Erection of 6 No 132m high wind turbines and associated 80m high anemometer mast, access roads, crane pads, control building, sub-station and temporary construction compound at land at Penny Hill Lane, Ulley, Rotherham for Penny Hill Wind Farm Ltd. (RB2009/0824)

Approved Planning 1 paper

Planning Board approved this item on Wednesday 26 May 2010. Below is the council's own wording, with the papers it was decided on.

Item3

Resolved

Resolved :- (1) That the application be referred to the Department for Communities and Local Government under The Town and Country Planning (Consultation) (England) Direction 2009. (2) That consequent upon the Department for Communities and Local Government deciding not to intervene on this application, planning permission be granted for the reasons and the revisions adopted by Members at the meeting and appended to the minutes, the revisions as set out below and subject to the following conditions:- 1. Page 8 paragraph (b):- “European Community Directive 2009 requires that 15% of the UK’s total energy use should be supplied by renewable sources by 2020. The Climate Change Act 2008 legally binds the UK to deliver a reduction in greenhouse gas emissions of 80% by 2050 and at least 34% by 2020, compared with 1990 levels. The Energy Act 2008 places obligations on the electricity generating industry to provide electricity from renewable sources.” 2. Page 18 Condition 30:- “Before the development is commenced on site, details of the need for and level of on-site water extraction for the mixing of concrete, along with the likely impact of this activity on the watercourse, wetland habitat and associated species, and details of the proposed measures to minimise and mitigate any negative impact, shall be submitted to and approved by the Local Panning Authority. The development shall be carried out in accordance with the approved details.” 3. Page 21 Condition 47:- “Wind speed, wind direction and power generation data for each wind turbine shall be continuously logged. In the event of complaint, relevant data shall be provided to the Local Planning Authority in accordance with the attached Guidance Note 1(d), and within 28 days of such request.” 4. Page 21 Condition 48:- “Before the development is commenced on site, details of the chosen turbine shall be submitted to and approved by the Local Planning Authority. Details shall include the full turbine specifications and evidence that the units meet the same criteria as those measured ... view the full minutes text for item 3.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Planning Board
This report is being read into text

Papers are read newest first, so recent reports come through within hours. Until then, open it at source.

Open the PDF

Papers for this item

Kept in our archive, download once signed in
PDF
Erection of 6 No 132m high wind turbines and associated 80m high anemometer mast, access roads, crane pads, control building, sub-station and temporary construction compound at land at Penny Hill Lane, Ulley, Rotherham for Penny Hill Wind Farm Ltd. (RB2009/0824)Report 618 KB Copy on its way

At this meeting

Whole meeting
2Deferments/Site VisitsOn the agenda
3Erection of 6 No 132m high wind turbines and associated 80m high anemometer mast, access roads, crane pads, control building, sub-station and temporary construction compound at land at Penny Hill Lane, Ulley, Rotherham for Penny Hill Wind Farm Ltd. (RB2009/0824)This decision
4Erection of 29 No. dwellinghouses comprising 1 No. bungalow, 2 No. two storey apartment buildings with Juliet balconies comprising 12 No. apartments and 16 No. two storey dwellinghouses at land at Garden Street, Melton High Street, Frederick Street and Victoria Road, Wath upon Dearne (RB2010/0351)Agreed

On this subject at Rotherham

Search all
  1. Erection of 6 No 132m high wind turbines and associated 80m high anemometer mast, access roads, crane pads, control building, sub-station and temporary construction compound at land at Penny Hill Lane, Ulley, Rotherham for Penny Hill Wind Farm Ltd. (RB2009/0824)This decision
  2. Courtesy Consultation - Erection of a non-food retail unit (Class A1) with ancillary customer restaurant and bistro and provision of associated car parking, landscaping works, servicing and access and highway works (additional information rApproved
  3. Courtesy Consultation in respect of the erection of one wind turbine (34.4m high) and associated works at Glen Quarry Ruddle Mill Lane Hirst Lane Stainton for Urban Wind Ltd. (RB2014/0261)Decided
  4. Courtesy Consultation in respect of the erection of one wind turbine (79m high) and associated works with installation of transformer/substation enclosure, formation of crane hardstanding area and creation of new access on approx 0.51 ha ofDecided
  5. Courtesy Consultation for the erection of a non-food retail unit (Class A1) with ancillary customer restaurant and bistro, and provision of associated car parking, landscaping works, servicing and access and highway works, site off Betafence Wire Factory, Lock House Road, Sheffield (RB2013/0707)Approved
  6. Courtesy Consultation in respect of the erection of one wind turbine (79m high to blade tip) and associated works at land to south of Moor Lane Micklebring, Rotherham for One Winds Renewables Limited (RB2013/0166)Decided

More from Rotherham Planning Board

All decisions
MeetingDecisionOutcome
29 Oct 2026 Minutes of the previous meeting held on 8th October 2026- That the minutes of the previous meeting of the Planning Regulatory Board held on Thursday, 8 th October, 2026, be ... Approved Open
29 Oct 2026 Development Proposals- (1 ) That , on the development proposals now considered, the requisite notices be issued and be made available on t... Approved Open
29 Oct 2026 Report of the Service Director for Planning, Regeneration and Transport - Whitestone Solar Farm - Nationally Significant Infrastructure Project Update- That the update be received and the contents noted. Noted Open
8 Oct 2026 Minutes of the previous meeting held on 17th September, 2026- That the minutes of the previous meeting of the Planning Regulatory Board held on Thursday, 17 th September, 2026, ... Approved Open
8 Oct 2026 Development Proposals- (1) That, on the development proposals now considered, the requisite notices be issued and be made available on the... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies