CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Rotherham Metropolitan Borough Council

BDR Manager's Report

Noted Committee 1 paper

Barnsley, Doncaster and Rotherham Joint Waste Board noted this item on Monday 7 October 2013. Below is the council's own wording, with the papers it was decided on.

Item16

Resolved

Resolved :- That the BDR Manager’s report be received and its contents noted.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Barnsley, Doncaster and Rotherham Joint Waste Board, 5 pages

Item 4 BDR MANAGER UPDATE REPORT

BDR WASTE PFI BDR M AN AGER UPD ATE REPORT 25/9/2013

.

1.0Governance

The BDR Manager and the 3SE Contract Manager will be reporting to the Liaison Committee on the progress of the Contract on 16/10/2013. The Liaison Committee comprises of Board Directors of the Special Purpose Vehicle. Targets for the next phase of the Project will be set at this meeting.

The first draft of the Contract Manual is currently under review by the wider team.

2.0Project Delivery

2.1Bolton Road

Item Percentage Target Actual Comments Complete Completion Completion Date Date Bridge design 100% 24/9/2012 17/8/2012 Bridge construction to adoptable standards for 120 year life Planning Bolton 100% 10/8/2012 9/8/2012 Full planning consent obtained Judicial Road Review period ended on 9/8/2012 no issues were raised. Detailed design work will require some minor-material amendments to be made to the application. These are due to some slight practical variations in the design of the gatehouse, visitors centre, architectural treatment and ground surface treatment. Discharge of 75% 1/7/2015 The Bolton Road planning consent planning conditions that require more work to be conditions undertaken are related to drainage, odour management, contamination and noise.

Item Percentage Target Actual Comments Complete Completion Completion Date Date Bolton Road 100% July 2012 in 7/01/2013 Permit received from Environment permit process Final Agency on 5/10/2012. There are 4 pre- Business operational conditions. Case (FBC) • An odour management plan is to be submitted before the facility becomes operational • Background sampling of bio-

1 aerosols must be undertaken • Further information on noise abatement must be submitted • Evidence of the technical competence of the Site Manager must be supplied Judicial Review Period ended on 6/1/2013; the permit is now deemed satisfactory as Shanks have not raised any issues. Site possession 100% Shanks Contractor onsite. Construction, Shanks Design and Management advisor has checked Method Statements and Quality Systems, enabling works underway. Mobilisation for 100% 15/10/2012 13/8/12 Shanks Contractor (Birse) have mobilised Enabling Works plant for main works on site. Shanks and Birse leased office space at Patrick Tobin Business Park, Wath. The Independent Certifier has commenced his review of the design and build. Enabling works 100% 23/12/2012 All consents in place for working on the Bolton Road access road. Culvert in place, backfilling complete Mobilisation for 100% 12/12/12 7/12/2013 3SE construction sub-contractor Birse Construction mobilised for the construction of the main Bolton Road facility. Excavation works commenced. The EA are consulting on the discharge of dewatering effluent from site. Power on to 25% 26/8/2014 Way leaves in place permanent works Buildings 14% 29/9/2014 Slab pours in progress, reception pit floor complete now complete. Haul roads on site are excluding being constructed along with drainage planting and cable ductwork. Cabin office block has been relocated to allow access to visitors centre and workshop footprints. Roads and 1% 01/10/2014 weighbridge complete Intelligent 0% 7/4/2015 Transfer Station (ITS) Commissioning ITS Acceptance 0% 20/5/2015 Tests Anaerobic 0% 12/5/2015 Digestion (AD) Commissioning Animal By- 0% 12/5/2015 Products Regulations (ABPR) Compliance AD Acceptance 0% 16/6/2016 Tests Progress 6% 1/7/2015 towards Service Commencement

2.2Ferrybridge

Ferrybridge 1005 July 2012 Permit issued 30/11/2012 SSE confirmed this as a permitting in FBC satisfactory permit. Judicial Review period ended on process 1/3/2013 with no challenges received. Enabling works 95% 17/12/2012 Cricket Pavilion completed, new car parking area Ferrybridge completed, work on access underway outstanding work on tank but this will not effect the main works commencing Main Works Hot 0% 12/10/2014 Commissioning Operational 0% 5/4/2015 Testing Facility 0% 5/4/2015 Operational

3.0Technical

3.1Bolton Road

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
BDR Manager's ReportReport 5 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. BDR Manager's ReportThis decision
  2. BDR Managers ReportAgreed
  3. BDR Managers ReportNoted
  4. BDR Managers ReportNoted
  5. BDR Managers ReportNoted
  6. BDR Managers ReportNoted

More from Rotherham Barnsley, Doncaster and Rotherham Joint Waste Board

All decisions
MeetingDecisionOutcome
16 Nov 2026 Minutes of the previous meeting held on (copy attached)That the minutes of the meeting of 3 February 2026 be approved. Approved Open
16 Nov 2026 BDR Managers ReportThat the budget for 2026/27 be agreed. 2. That the report be noted. Agreed Open
16 Nov 2026 BiffaThat the update be noted. Noted Open
16 Nov 2026 Risk RegisterThat the report be noted. Noted Open
3 Feb 2026 Minutes of the previous meeting held on 7 October 2025 (copy attached) and any matters arising- That the minutes of the meeting held on 7 October 2025, be approved as a true and correct record of the proceedings. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies