BDR Manager - Annual Report 2013-2014

Agreed Committee 1 paper

Barnsley, Doncaster and Rotherham Joint Waste Board agreed this item on Friday 27 June 2014. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

Agreed:- That the BDR Joint Waste Manager’s annual report for the period April 2013 to March 2014, as now submitted, be approved.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Barnsley, Doncaster and Rotherham Joint Waste Board, 9 pages

BDR MANAGER UPDATE REPORT

BDR WASTE PFI BDR M AN AGER AN NU AL UPD ATE REPORT APRIL 2013 – MARCH 2014

1.0Governance

Following the 2014 elections in Doncaster, Cllr Ros Jones, Labour, was elected Mayor. Cllr Chris Mills, Labour, was appointed as portfolio holder for Environment and Waste in Doncaster. Cllr Mills replaced Cllr Cynthia Ransome as the Doncaster representative on Joint Waste Board (JWB) and took over as Chair for the 2013/14 session.

The first meeting of the Liaison Committee took place on the 16 October 2013. Reports were submitted on progress of the construction so far and Mike Tuner of Shanks updated committee members on the recent sale of Shanks solid waste business to Biffa. Members of the Liaison Committee raised concerns on the recent fly outbreak at Cumbria, which Mike Turner replied to. Overall, the Liaison Committee were pleased with the projects progress. A working group is to be set up to maximise the local employment benefits of the Contract.

2.0Project Delivery

2.1Bolton Road

Item Percentage Target Actual Comments Complete Completion Completion Date Date Bridge design 100% 24/9/2012 17/8/2012 Bridge construction to adoptable standards for 120 year life Planning Bolton 100% 10/8/2012 9/8/2012 Full planning consent obtained Judicial Road Review period ended on 9/8/2012 no issues were raised. Detail design work previously discussed at Steering Committees on 12/6/2012 and 10/7/2012 submitted and approved as Section 73 amends. Planning Casework unit did not call these in. Discharge of 95% 1/7/2015 Outstanding conditions: planning • Biodiversity conditions • Flood management plan • Traffic management plan The above have now all been submitted to RMBC planners SWM, awaiting comments. Item Percentage Target Actual Comments Complete Completion Completion Date Date Bolton Road 100% July 2012 in 7/01/2013 Permit received from Environment permit process Final Agency on 5/10/2012. There are 4 pre- Business operational conditions. Case (FBC) • An odour management plan is to be submitted before the facility becomes operational • Background sampling of bio- aerosols must be undertaken • Further information on noise must be submitted • Evidence of the technical competence of the Site Manager must be supplied Judicial Review Period ended on 6/1/2013 the permit is now deemed satisfactory, as Shanks have not raised any issues. Variation for AD to move from standard rules to bespoke submitted and duly made. Fire Strategy 85% ITS Fire strategy in place and reviewed by completed Building Control for life only Site possession 100% Shanks Contractor onsite Construction, Shanks Design and Management advisor checked Method Statements and Quality Systems, enabling works underway. Mobilisation for 100% 15/10/2012 13/8/12 Shanks Contractor mobilised plant for Enabling Works main works on site. Shanks and Birse leased office space at Patrick Tobin Business Park, Wath. The Independent Certifier has commenced his review of the design and build. Enabling works 100% 23/12/2012 23/12/12 All consents in place for working on the Bolton Road access road. Culvert in place, backfilling complete Mobilisation for 100% 12/12/12 7/12/2013 3SE construction sub-contractor Birse Construction mobilised for the construction of the main Bolton Road facility. Office lease now in place. Excavation works commenced. The EA are consulting on the discharge of dewatering effluent from site. Power on to 100% 26/8/2014 Way leaves in place, electricity substation permanent now completed, cables pulled across road works ready for jointing, final connection now made.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
BDR Manager: Annual Report 2013-2014Report 9 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. BDR Manager - Annual Report 2013-2014This decision
  2. BDR Managers ReportAgreed
  3. BDR Managers ReportNoted
  4. BDR Managers ReportNoted
  5. BDR Managers ReportNoted
  6. BDR Managers ReportNoted

More from Rotherham Barnsley, Doncaster and Rotherham Joint Waste Board

All decisions
MeetingDecisionOutcome
16 Nov 2026 Minutes of the previous meeting held on (copy attached)That the minutes of the meeting of 3 February 2026 be approved. Approved Open
16 Nov 2026 BDR Managers ReportThat the budget for 2026/27 be agreed. 2. That the report be noted. Agreed Open
16 Nov 2026 BiffaThat the update be noted. Noted Open
16 Nov 2026 Risk RegisterThat the report be noted. Noted Open
3 Feb 2026 Minutes of the previous meeting held on 7 October 2025 (copy attached) and any matters arising- That the minutes of the meeting held on 7 October 2025, be approved as a true and correct record of the proceedings. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies