CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Rotherham Metropolitan Borough Council

BDR Manager's Report

Agreed Committee 1 paper

Barnsley, Doncaster and Rotherham Joint Waste Board agreed this item on Friday 12 December 2014. Below is the council's own wording, with the papers it was decided on.

Item27

Resolved

Agreed :- That the report of the BDR Joint Waste Manager be received and its contents noted.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Barnsley, Doncaster and Rotherham Joint Waste Board, 9 pages

BDR WASTE PFI BDR MA NAGER UPDATE REPORT (DECEMBER 2014)

1.0Governance

Reports on amendments to the current delegations under the PFI Contract have been considered and approved across all three Councils. The Legal team is considering revisions to the Inter Authority Agreement, this work has been impacted on by a key individual leaving the team.

2.0Project Delivery

2.1Bolton Road

Item Percentage Target Actual Comments Complete Completion Completion Date Date Discharge of 95% 1/7/2015 Outstanding conditions: planning • Biodiversity conditions • Flood management plan • Traffic management plan The above have all now been submitted to RMBC planners, Shanks awaiting comments.

A section 73 planning application in respect of minor amendments to the AD facility and final internal layout has been submitted and was considered and approved by the Planning Committee on 30 October 2014. Formal sign off has now been provided by RMBC. Permit progress 100% 1/7/2012 1/10/12 Permit received from Environment Agency on 5/10/2012. There are 4 pre-operational conditions, which have all now been signed off. Variation for AD to move from standard rules to bespoke, now issued by EA. Fire Strategy 95% The Fire Strategy has undergone completed a complete review following incidents at Ferrybridge and Frog Island. Power on to 100% 26/8/2014 Final connection now made. permanent works Buildings 100% 29/9/2014 All external works complete. complete Workshop build and fit out excluding complete. planting Visitors centre build and fit out complete, handover on 23/06/14. Roads and 100% 01/10/2014 Weighbridges installed and roads weighbridge complete. complete Handover completed 01/09/14. Intelligent 100% 7/4/2015 All external works nearing Transfer Station completion. (ITS) Construction ITS 75% 24/2/2015 Process water cannons Commissioning installation complete. All six waste handling cranes installed and grabs now on site Work commenced on refinement layout with several pieces of equipment (trommel, conveyors) now in place. Mechanical installation now 80% complete, electrical wiring to commence. Bio filter construction commenced, line 1 and 2 now complete and filled Cable pulling and electrical work commenced. Shredders installed. Fast acting doors to reception pits and shredder pits now installed ITS Acceptance 0% 20/5/2015 Tests Anaerobic 70% 11/11/2014 Good progress made with all Digestion (AD) internal construction works to Commissioning fermenters, reception hall, ASP and In Vessel Composting (IVC) areas now substantially complete. Standby boiler commissioned and commenced heat cycle of fermenter under floor heating. Bio filter construction complete, fill of LECA complete, and tented cover now installed. Extraction ductwork, now substantially complete. Training of workforce commenced w/c 23/09/14. Readiness test certificate issued.by Independent Certifier (IC). FITs application 50% 12/10/2014 FiTS application underway. BDR manager has raised with Contract Director that BDR need to have sight of the application. Animal By- 50% 12/5/2015 Meeting held with Vets on site, Products Further plans submitted to Vets Regulations for sign off, ref. Addition of (ABPR) mechanical heat to pasteurisation Compliance process, further meetings planned in November 2014. Early warning issued by Jones Celtic to Shanks to their perceived change in State vets guidance. AD Acceptance 0% 16/6/2015 Tests Progress 74% 1/7/2015 Balfour Beatty have now left site towards Service Both A2A (Ecodeco) and Jones Commencement Celtic Bio Energy (JCBE) now established with progress on mechanical and equipment fit out. Recruitment 40% Recruitment for AD manager, MBT manager, AD supervisor, and AD operators now complete.

2.2Ferrybridge

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
BDR Manager's ReportReport 9 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. BDR Manager's ReportThis decision
  2. BDR Managers ReportAgreed
  3. BDR Managers ReportNoted
  4. BDR Managers ReportNoted
  5. BDR Managers ReportNoted
  6. BDR Managers ReportNoted

More from Rotherham Barnsley, Doncaster and Rotherham Joint Waste Board

All decisions
MeetingDecisionOutcome
16 Nov 2026 Minutes of the previous meeting held on (copy attached)That the minutes of the meeting of 3 February 2026 be approved. Approved Open
16 Nov 2026 BDR Managers ReportThat the budget for 2026/27 be agreed. 2. That the report be noted. Agreed Open
16 Nov 2026 BiffaThat the update be noted. Noted Open
16 Nov 2026 Risk RegisterThat the report be noted. Noted Open
3 Feb 2026 Minutes of the previous meeting held on 7 October 2025 (copy attached) and any matters arising- That the minutes of the meeting held on 7 October 2025, be approved as a true and correct record of the proceedings. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies