CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Rotherham Metropolitan Borough Council

BDR Manager's Annual Report.

Agreed Committee 1 paper

Barnsley, Doncaster and Rotherham Joint Waste Board agreed this item on Friday 12 June 2015. Below is the council's own wording, with the papers it was decided on.

Item4

Resolved

Agreed: - That the report be noted.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Barnsley, Doncaster and Rotherham Joint Waste Board, 13 pages

BDR MANAGER UPDATE REPORT

BDR WASTE PFI BDR MA NAGER A NNUAL UPDATE REPORT

A PRIL 2014 – MARCH 2015

1.0Governance

In May 2014 the Rotherham representative on the Joint Waste Board, Richard Russell was not elected. In December 2014 Cllr Mahroof Hussain, RMBC, was formally appointed as Rotherham’s representative and Vice Chair to the Joint Waste Board.

Cllr Hussain resigned from RMBC early 2015.

Councillor Roy Miller, the Chair of the Joint Waste Board, formally thanked Richard Russell for his work on the BDR PFI Project over the years.

2.0Project Delivery

2.1Bolton Road

Item Percentage Target Actual Comments Complete Completion Completion Date Date Discharge of 95% 1/7/2015 Outstanding conditions: planning • Biodiversity conditions • Flood management plan • Traffic management plan The above have now all been submitted to RMBC planners, who have verbally accepted them. Shanks awaiting formal sign off Permit progress 100% 1/7/2012 1/10/12 All 4 pre-operational permit conditions have been signed off Fire Strategy 95% 24/2/2015 24/2/2015 The Fire Strategy has undergone completed a complete review following incidents at Ferrybridge and Frog Island. Fire Service/RMBC Emergency planners have attended site and have been consulted regarding requirements in case of emergency

1 Item Percentage Target Actual Comments Complete Completion Completion Date Date Power on to 100% 26/8/2014 Final G59 connection completed permanent works Buildings 100% 29/9/2014 23/6/2014 All external works complete. complete Workshop build and fit out excluding complete. planting Visitors’ centre build and fit out complete, handover on 23/06/14 Roads and 100% 01/10/2014 01/09/2014 Weighbridges installed and roads weighbridge complete. complete Handover completed 01/09/14 Intelligent 100% 7/4/2015 24/2/2015 All external works completed Transfer Station (ITS) Construction ITS 98% 24/2/2015 All six waste handling cranes and Commissioning grabs installed, cold commissioning commenced. Refinement progressing well on mechanical and electrical installation they are now 100% complete, Both bio drying halls suspended concrete floors, 100% complete. Fast acting doors to reception pits and shredder pits now commissioned ITS Acceptance 10% 20/5/2015 Acceptance testing commenced Tests 18/4/2015 Anaerobic 70% 11/11/2014 Readiness certificate issued by Digestion (AD) IC. Commissioning Vets signed off of Hazard Analysis and Critical Control Point (HACCP) plan and hot commissioning on AD commenced Item Percentage Target Actual Comments Complete Completion Completion Date Date FITs application 50% The target FiTS application underway. BDR date for this manager has raised with Contract to have the Director that BDR need to have maximum sight of the application benefit for the term of the Contract is 1//7/2015 Animal By- 100% 12/5/2015 22/06/2015 Sign off now complete. Products Regulations (ABPR) Compliance AD Acceptance 50% 16/6/2015 Due to commence May 2015 Tests Progress 98% 1/7/2015 Balfour Beatty have now left site towards Service Both A2A (formerly Ecodeco) and Commencement Jones Celtic Bio Energy (JCBE) now established with progress on mechanical and equipment fit out. Recruitment 95% Staff turnover has resulted in vacancies for some office staff.

2.2Ferrybridge

Item Percentage Target Actual Comments Complete Completion Completion Date Date Enabling works 95% 17/12/2012 Cricket pavilion completed, new car Ferrybridge parking area completed, work on access underway. Outstanding work on tank but this will not affect the main works commencing Main Works 50% 12/10/2014 29/3/2015 This date has slipped into March Hot 2015 at last update. This date has Commissioning no implications for BDR as SRF will not be available until early March 2015 Operational 0% 5/4/2015 Testing Facility 0% 5/4/2015 Operational 2.3 Grange Lane

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
BDR Manager's Annual Report.Report 13 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. BDR Manager's Annual Report.This decision
  2. BDR Managers ReportAgreed
  3. BDR Managers ReportNoted
  4. BDR Managers ReportNoted
  5. BDR Managers ReportNoted
  6. BDR Managers ReportNoted

More from Rotherham Barnsley, Doncaster and Rotherham Joint Waste Board

All decisions
MeetingDecisionOutcome
16 Nov 2026 Minutes of the previous meeting held on (copy attached)That the minutes of the meeting of 3 February 2026 be approved. Approved Open
16 Nov 2026 BDR Managers ReportThat the budget for 2026/27 be agreed. 2. That the report be noted. Agreed Open
16 Nov 2026 BiffaThat the update be noted. Noted Open
16 Nov 2026 Risk RegisterThat the report be noted. Noted Open
3 Feb 2026 Minutes of the previous meeting held on 7 October 2025 (copy attached) and any matters arising- That the minutes of the meeting held on 7 October 2025, be approved as a true and correct record of the proceedings. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies