BDR MANAGER UPDATE REPORT
BDR WASTE PFI BDR MANAGER ANNUAL REPORT 2019-2020
1.0Governance
1.1Resources
1.1.1 The BDR Team have been home working since the week prior to Covid-19 lockdown being introduced and will continue to do so until advised otherwise. The team’s work has been managed and completed through conference calls and meetings held via SKYPE and Microsoft Teams. As well as our own workload we are supporting and helping to co-ordinate the three councils’ response to the Covid-19 crisis. This includes ensuring the Bolton Road waste treatment facility continues to accept waste, supporting a joint BDR response to managing HWRCs and supplying the latest guidance, information and legislation amendments to Waste Managers to help organise a joint response.
1.1.2 The BDR Community Education Liaison Officer (CELO) has now returned to her substantive post at Renewi (after providing support to RMBC to assist with the engagement of residents on the new waste service). Since being back in the roll the CELO is now being supported by an Assistant CELO.
1.1.3 Steering Committee have agreed the CELO plan and budget for 2020/21 which was developed in consultation with the communications group. The roll- out of the new waste minimisation, social media and targeted campaigns had begun. But due to the impact of COVID-19 the CELO plan has be adapted to cope with the current limitations and will reviewed to once a new normal has been established?
1.2BDR Liaison Committee Meeting
1.2.1 Tom Smith, RMBC, became the Chair of the BDR Liaison Committee, and meetings were held in October 2019 and May 2020. Appendix 1 to this report contains the TOR for the Liaison Committee and appendix 2 contains the approved set of minutes from 19.10.19.
1.3Steering Committee
1.3.1 The Chair of the BDR Steering Committee rotated from Barnsley Council to Rotherham Council in July 2019 and the BDR Team would like to thank Paul Castle for his hard work and support during his term as Chair.
1.3.2 Tom Smith, RMBC, became the Chair of the Steering Committee. BDR MANAGER UPDATE REPORT
1.4South Yorkshire Leaders’ Meeting
1.4.1 Beth Baxter, BDR Manager and Paul Hutchinson, BDR Contract Officer attended the South Yorkshire Leaders’ Meeting on 27.1.20 to update on the South Yorkshire Waste Strategy.
1.4.2 No actions were required to be followed up on from the meeting
1.5Operating Contractor (OpCo)
1.5.1 Monthly meetings are held between the BDR team, Renewi the Operating Sub-contractor and invited representatives from SSE (Ferrybridge Multi-fuel energy from waste facility).
1.5.2 At these meeting the BDR team receive updated reports on plant performance and maintenance, duty of care, health and safety, any projects, contractual performance and site inspection outcomes. The BDR team raise any performance issues and agree deductions that should be applied and the Contractor is measured against contractual requirements.
2.0Contract Delivery
2.1Bolton Road
2.1.1 The two primary monitoring metrics for the contract are recycling performance and diversion from landfill.
2.1.2 The contractual target was originally set at 19% recycling performance (default trigger below 12.5%) and more than 95% diversion of waste from landfill. 2.1.3 After the significant service change made by Rotherham MBC in January 2019 (introduction of the collection of plastic bottles, pots, tubs and trays in the kerbside recycling), the recycling target was reduced to 18% and the default trigger to 10.5%. To implement this agreement approvals were authorised by each authority, Defra, the SPV Board and the operating contractor’s Board. The agreement was formalised through the contractual mechanisms.
2.1.4 In 2019/20 the facility achieved a recycling rate of 12.08%, an increase of 0.67% on the 2018/19 rate. This recycling rate includes all material presented to the market for recycling from the BDR Waste Treatment Facility.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Updates for virtual CLG meeting 30th March-2Appendix 3 | 75 KB | Download |
PDF |
Updates for virtual meeting 8th JuneAppendix 4 | 79 KB | Download |
PDF |
BDR Manager's ReportReport | 293 KB | DownloadRead as text |
PDF |
IAppendix 2: Schedule A: Functions of Liaison Commmittee v2Appendix | 56 KB | Download |
Follow Barnsley, Doncaster and Rotherham Joint Waste Board at Rotherham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Nov 2026 | Minutes of the previous meeting held on (copy attached)That the minutes of the meeting of 3 February 2026 be approved. | Approved | Open |
| 16 Nov 2026 | BDR Managers ReportThat the budget for 2026/27 be agreed. 2. That the report be noted. | Agreed | Open |
| 16 Nov 2026 | BiffaThat the update be noted. | Noted | Open |
| 16 Nov 2026 | Risk RegisterThat the report be noted. | Noted | Open |
| 3 Feb 2026 | Minutes of the previous meeting held on 7 October 2025 (copy attached) and any matters arising- That the minutes of the meeting held on 7 October 2025, be approved as a true and correct record of the proceedings. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.