CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Rotherham Metropolitan Borough Council

Information Only Items

Noted Committee 1 paper

Barnsley, Doncaster and Rotherham Joint Waste Board noted this item on Monday 26 June 2023. Below is the council's own wording, with the papers it was decided on.

Item9

Resolved

- That the minutes of the Community Liaison Group meeting held on 22 November 2022 be noted.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Barnsley, Doncaster and Rotherham Joint Waste Board

Notes from the meeting of Community Liaison Group on Tuesday, 22 November 2022, at 6pm at the Manvers site. Attendance Non-members Apologies 1.Welcome and introductions. The acting Chair welcomed everyone to the meeting. 2. Notes from the last meeting on 9 August 2022. These were agreed as a true record. 3. Issues arising. There were none. 4. Renewi BDR Ltd update The Renewi BDR Contract Director summarised and updated his report. Moderate levels of Covid over the last five months averaging positive cases per month. Infections peaked at 10 cases in June dropping to two in September. Over the period the average absence rate due to Covid was 7%.

There has again been a reduction in Contract waste volumes over the last four months. Inbound tonnages are currently 4% lower than forecast with a total of 67885 tonnes received against a target of 70772 tonnes. The overall annual forecast was previously reduced from 217,000 tonnes to 214,000 tonnes. From November onwards the annual forecast has been reduced to 210,000 tonnes.

Recycling dipped slightly in the quarter to 14.40%. The performance was affected by lower fines recovery as a result of high stocks in the Anaerobic Digestion plant. Moisture loss has continued to perform well with the 4-month average at 30.20. %. The moisture loss forecast for the period was 30.94%.

Processing in the Anaerobic Digestion plant has been affected by a structural issue with the concrete in some sections of the walls. Renewi central engineering team are currently working on a rectification project which could take up to four months.

A campaign was launched in August by the Environmental Services Association of which Renewi is a member to raise awareness of lithium-ion batteries in waste. These items are commonplace in domestic waste and a now a major cause of fires in the waste industry.

Another review of shutdown frequency has been undertaken at Ferrybridge. The latest proposal shutdowns will take place at 15-month intervals in each facility, alternating between FM1 and FM2. The next shutdown in FM1 is planned for the end of March 2023 and FM2 in May 2023.

The CLG was informed that after the last CLG meeting in August nine odour complaints had been received about the site. The Environment Agency had responded and carried out a number of investigations. It had not found anything amiss on any of its visits to the site or surrounding localities.

CLG members discussed other possible sources of odour in the area. They were advised that if residents detected odour in the area in future, they could use the BDR Renewi enquiries email address to raise the issue or call the office.

Action: Quarterly figures on waste received and amount recycled to be reported at each CLG meeting. 5. The Councils’ BDR Team The BDR Team’s report was summarised. The BDR Councils have continued to successfully deliver waste services and collect waste streams as scheduled.

The Councils continue to see a lowering of household waste tonnages collected. The trend is now seeing that reduction taking the levels of household waste collected down to pre-Covid levels. It is becoming clear that more residents have returned to the workplace with less home working. The current cost of living crisis is seeing less waste produced as we all tighten our belts, make do and mend, and look to ensure we only buy what we need and throw away less unused food or fast fashion and cut back on luxuries.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Information Only ItemsReport 266 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 8 attended
DB
Councillor Dominic BeckMember, present
JH
Councillor James HigginbottomChair, present
MH
Councillor Mark Houlbrook (Doncaster MBC)Vice-Chair, present
LB
Lisbeth BaxterCouncil Staff, present
RF
Rhonda FleetwoodCouncil Staff, present
SK
Sharon KempCouncil Staff, expected
PW
Paul WoodcockOfficer, apologies
SB
Sam BarstowOfficer, present

More from Rotherham Barnsley, Doncaster and Rotherham Joint Waste Board

All decisions
MeetingDecisionOutcome
16 Nov 2026 Minutes of the previous meeting held on (copy attached)That the minutes of the meeting of 3 February 2026 be approved. Approved Open
16 Nov 2026 BDR Managers ReportThat the budget for 2026/27 be agreed. 2. That the report be noted. Agreed Open
16 Nov 2026 BiffaThat the update be noted. Noted Open
16 Nov 2026 Risk RegisterThat the report be noted. Noted Open