Highway Drainage Investment Programme and Culvert Investment Programme 2023-24.

Approved Planning 1 paper

Planning, Transport and Sustainable Development and Regeneration approved this item on Tuesday 18 April 2023. Below is the council's own wording, with the papers it was decided on.

Item3a

Resolved

Salford City Council - Record of Decision I, Councillor Mike McCusker, Lead Member for Planning, Transport & Sustainable Development , in exercise of the powers contained within the Council Constitution , do hereby: Approve the proposed programme of work for the Highway Drainage Investment Programme (DIP) 2023/24 and the Culvert Investment Programme (CIP) for 2023/24, as outlined in the report. The Reasons are: To facilitate continuous improvement of the highway drainage infrastructure as part of the defined Network Recovery Plan as part of the ongoing rolling programme of drainage repair works. Options considered and rejected were: No other options were considered for this report. Assessment of Risk: Medium – it is important that the existing highway drainage and culvert infrastructure improvements continue in order to ensure that surface flooding is minimised, and that the capacity of existing systems is maximised, especially in view of the climate emergency. The source of funding is: Prudential Code funding (Capital) Legal Advice obtained: Helen Chapman Principal Solicitor Solicitor-0161 234 3227 15th March 2023 The Council as highway authority has a number of statutory duties and powers in relation to flooding matters on highways maintainable at the public expense. The Highway Authority must take such care in all the circumstances as is reasonably required to ensure that the highway is not dangerous for traffic and for the public. Under s100 Highways Act 1980 the highway authority for a highway may, for the purpose of draining it or of otherwise preventing surface water from flowing on to it, do all or any of the following:— (a) construct or lay, in the highway or in land adjoining or lying near to the highway, such drains as they consider necessary. (b) erect barriers in the highway or in such land as aforesaid to divert surface water into or through any existing drain. (c) scour, cleanse and keep open all drains situated in the highway or in such land as aforesaid. On highways liable to flooding to a considerable depth, under s103 Highways Act 1980, the authority has a duty to provide graduated posts or stones indicating the depth of water covering the highway where it is considered necessary or desirable. The Council also has a duty to remove obstructions arising from snow, from falling down of banks/landslides on the side of the highway, or from any other cause. The Council has undertaken recent surveys and investigation of the highways drainage systems and identified a prioritised programme of repairs to ensure that the worst areas of flooding and structural defects are addressed first. Similarly, the culverts for which it is responsible have undergone surveys leading to prioritised repairs according to the future likelihood of collapses, blockages, and flooding, whilst also considering location and previous history. The proposals in the report for DIP and CIP will assist the Council in complying with these duties and strengthen the Council’s position in establishing a defence to any associated potential 3rd party claims by demonstrating that there is in place a sufficiently robust regime ...
Word for word from the decision Salford published for this meeting. Source: sccdemocracy.salford.gov.uk

Follow this further

Built from Salford's papers

What the report saysPro

Report to Planning, Transport and Sustainable Development and Regeneration

Part 1: Open to the Public

REPORT OF EXECUTIVE DIRECTOR PLACE TO LEAD MEMBER FOR PLANNING, TRANSPORT AND SUSTAINABLE DEVELOPMENT ON 18 t h APRIL 2023

TITLE: THE HIGHWAY DRAINAGE INVESTMENT PROGRAMME (DIP) 2023/24 AND THE CULVERT INVESTMENT PROGRAMME (CIP) 2023/24

RECOMMENDATIONS: That the Lead Member for Planning, Transport and Sustainable Development approves the proposed programme of work for the continuation of the Highway Drainage Investment Programme (DIP) 2023/24 and the Culvert Investment Programme (CIP) for 2023/24 as outlined in the report.

EXECUTIVE SUMMARY: The financial provision for the Highway Drainage Investment Programme for 2023/24 and the Culvert Investment Programme for 2023/24 has been confirmed as £250,000 (£200,000 and £50,000 respectively). The budget apportionments given in the report and detailed within the background document outline the 202324 scheme proposals as part of the ongoing rolling programme of drainage repair works. The works identified for inclusion within the Culvert Investment Programme are also outlined in the report.

BACKGROUND DOCUMENTS:

KEY DECISION: No

1 DETAILS: 1. The Highway Drainage Investment Programme

1.1Initial surveys and investigations into the condition of the highway drainage infrastructure identified many defective gullies and connections. The cause of many of these defects is attributed to damaged pipe work, which over time has allowed water to erode the carriageway foundation and cause failures. The repairs required usually consist of a small excavation to expose and repair the damaged sections of pipe work followed by backfill and reinstatement. 1.2 To date 6,024 of these defects have been addressed as summarised below in Table 1

Blocked Number of gullies covers lifted cleared with and greased New New concentrated following Gully Gully Gully General jetting & concentrated Connection Pots Covers Drainage Neighbourhood cleansing effort. Repairs installed installed Repairs Totals

Cadishead & Lower Irlam, Higher Irlam & Peel Green 377 75 70 25 60 61 668 Claremont, Weaste & Seedley 190 165 30 87 135 42 649 Swinton & Pendlebury 226 179 60 375 57 89 990 The Quays,Ordsall, Pendleton & Charlestown 281 100 41 152 75 48 697

East Salford 143 128 57 188 159 34* 709 Little Hulton, Walkden North & Walkden South 295 126 85 268 54 114 942 Worsley & Westwood Park, Boothstown & Ellenbrook 228 91 48 270 45 62 744 Eccles, Barton & Winton 205 122 30 66 83 57 563 Unscheduled (all Neighbourhoods) 62 62 Total **6024

2 Table 1 – Summary of highway drainage repairs completed (and scheduled to be completed to March 2022) * figure does not include the additional Broughton Flood Zone- 44 90 litre pots installed at Broughton Lane in 2018/19 ** Due to the new contractual arrangements- works will carry over to 2023/24 from 2022/23

1.3The capital funding allocation for highway drainage structural maintenance during 2023/24 has been confirmed as £200,000.

Work Element (£) Total (£) Drainage Investment Programme General Drainage Repairs: Direct Works Cost £173,145 Depot Overheads (15.51%)* £26,855 £26,855

Total Construction Costs £200,000.00

Total Budget for programme £200,000.00 Table 2 – proposed apportionment of DIP allocation for 2023/24. *Depot overhead for 2023/24 to be confirmed.

1.4The rolling programme of repairs will continue during 2023/24 to reduce the identified backlog of repairs. Details are as shown in Table 3 below. The programme has been prioritised using a risk-based approach to ensure that the worst areas of flooding and structural defects are addressed first. The programme has been identified in response to the following criteria:

 where flooding affects or is likely to affect property.

 locations adjacent to well used footways.

 where standing water is at critical turning or braking points; and

 where flooding is frequent and has been persistent for some years.

3 1.5 The proposed programme of work is highlighted in Table 3 below:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Highway Drainage Investment Programme and Culvert Investment Programme 2023-24.Report 443 KB DownloadRead as text

At this meeting

Whole meeting
3aHighway Drainage Investment Programme and Culvert Investment Programme 2023-24.This decision
3bCrash Barrier Investment Programme 2023-24.Approved

Who was there

1 of 1 attended
MM
Mike McCuskerCommittee Member, present

On this subject at Salford

Search all
  1. Highway Drainage Investment Programme and Culvert Investment Programme 2023-24.This decision
  2. Technical and Highways Minor Civils Framework Lot 3 – Drainage Investigation and Repair 2024/25 (Stuart Culshaw)Approved
  3. Highway Drainage (DIP) and Culvert (CIP) Investment Programmes 2024/25Approved
  4. Approval to Award the Contract for Highways Drainage Maintenance ProgrammeAgreed
  5. The Highway Drainage Investment Programme (DIP) 2022/23 and the Culvert Investment Programme (CIP) 2022/23.Approved
  6. Highway Drainage Investment Programme (DIP) 2021/22 and Culvert Investment Programme (CIP) 2021/22.Approved

More from Salford Planning, Transport and Sustainable Development and Regeneration

All decisions
MeetingDecisionOutcome
9 Sep 2026 Traffic Regulation Order 2453 - Chapel Street / Trinity Way / St Stephen Street & Ford Street, Blackfriars & Trinity and Ordsall) - Phase 1.Salford City Council - Record of Decision I, Councillor Mike McCusker, Deputy City Mayor and Lead Member for Planning... Refused Open
9 Sep 2026 City of Salford (Camp Street, Grecian Street, Neptune Gardens, & Trojan Gardens, Broughton) (No Waiting At Any Time) Order 2025.Salford City Council - Record of Decision I, Councillor Mike McCusker, Deputy City Mayor and Lead Member for Planning... Refused Open
12 Aug 2026 Irwell River Park Floating Wetland Habitats - Section 106 Contribution Expenditure.Salford City Council - Record of Decision I, Councillor McCusker, Deputy City Mayor and Lead Member for Planning, Tra... Approved Open
22 Jul 2026 Conservation Area Appraisals and Management Plans - Approval for Consultation, Proposed Boundary Changes, and Addition of a New Conservation Area.Salford City Council - Record of Decision I, Councillor Mike McCusker, Deputy City Mayor and Lead Member for Planning... Approved Open
22 Jul 2026 Update of the Salford City Council Local List of Heritage Assets, to include updates to existing entries, removals from the list and new additions as well as amendments to the selection criteria.Salford City Council - Record of Decision I, Councillor Mike McCusker , Deputy City Mayor and Lead Member for Plannin... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies