That planning permission be granted as per the Officer’s recommendation, subject to: · A Unilateral Undertaking covering ecological mitigation; · The Conditions as set out in Appendix 1 to the report; · The amendment of Condition No. 10 to ensure that the external surfaces of the new buildings shall be BS18B29 and appropriate in the landscape; · The extension of the proposed planting along the field margin in a north westerly direction towards Walcot pool and the Water Meadow plantation. (The Chairman returned to the meeting and resumed the Chair.)
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
Application Number: 14/05323/FUL Parish: Lydbury North Proposal: Erection of agricultural buildings for barn egg production, together with attenuation pond and access visibility splay improvement
Site Address: Walcot Farm, Lydbury North, Shropshire, SY7 8AA
Contact: Tim Rogers (01743) 258773 Walcot Farm, Lydbury North, Shropshire, South Planning Committee – 8 September 2015 SY7 8AA
Recommendation:- Approve subject to the conditions set out in Appendix 1 and subject to a legal agreement (Unilateral Undertaking) covering ecological mitigation
REPORT 1.0 THE PROPOSAL
1.1The applicants JW Evans & Son are proposing to diversify their agricultural enterprise through the erection of a barn egg laying unit This would extend to 35000 birds, producing fertile eggs for hatching to supply the pullet rearing industry which produces replacement birds for free range egg units. The proposals involve erection of 2 poultry buildings with a linked egg packing and storage area, and will provide housing for 35,000 birds (32,000 hens and 3000 cockerels). The proposed buildings will be of steel portal frame construction and clad in juniper green profile sheeting BS12B29.
1.2The proposed buildings would be purpose built poultry barns, constructed of a steel portal frame with polyester coated box profile sheeting for the walls and roof. The external colour will be juniper green (13S12B29). The buildings would each measure 104m x 19m with an eaves height of 3m and a ridge height of 5.5m. There would be five ventilation flues 0.9m high protruding from the ridge crests.
1.3Access to the public highway would be obtained using the existing farm road and highway access. The existing highway access would be upgraded. The proposal also includes hardstanding for parking and turning and 2 feed bins per building (5.87m high x 2.32m diameter).
1.4The unit would operate on a 48 week production cycle, including a 4 week period for cleaning and preparation at the end of each cycle.
Contact: Tim Rogers (01743) 258773 Walcot Farm, Lydbury North, Shropshire, South Planning Committee – 8 September 2015 SY7 8AA
1.5The inside of the building includes a scratch area and a plastic slatted dunging area. Nest boxes are situated centrally within the building adjacent to an egg collection conveyor. The nest boxes are angled towards the conveyor and the hens lay their eggs in the nest boxes. The eggs then roll onto the conveyor and are brought to the service area at the end of the building.
1.6An automated chain-fed feeding system would be employed which operates every 2 hours between the hours of 6.00am and 9.00pm. Water supply is provided by nipple drinkers. The lighting within the building is on a time switch, providing the birds with 14 hours of daylight per day. Ventilation is provided by ridge chimneys and side inlet vents.
1.7The design of the Unit incorporates a plastic slatted floor droppings pit, which has a proven history of creating no smell nuisance. As droppings build up through the flock cycle, they remain dry. A natural dry composting takes place and hence ammonia does not build up. The droppings pit is sufficient to accommodate the entire 48 week supply of manure. Hence, cleanout of the building only occurs once every year for I day within a 4 week cleanout and preparation period when the unit is dismantled internally and the detritus removed. This contrasts with more intensive poultry rearing operations where the cycles can be as short as 6 weeks.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.