That consideration of the application be deferred to allow the applicant to investigate whether it would be possible to remove the best and most versatile agricultural land from the application and to consult with local community on the revised plan. .
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
Responsible Officer: Tracy Darke, Assistant Director of Economy & Place
Summary of Application
Application Number: 22/02565/FUL Parish: Greete Proposal: Construction of a solar farm together with all associated works, equipment, necessary infrastructure and biodiversity enhancement areas. Site Address: Brick House Farm, Greete, Ludlow, SY8 3BZ Applicant: Bluefield Renewable Developments Ltd Case Officer: Grahame French email: [email protected]
Recommendation:- Approve subject to the conditions set out in Appendix 1. REPORT
1.0THE PROPOSAL
1.1The application is for a solar generating facility with a capacity of 49.99MW comprising solar photovoltaic (PV) panels and associated infrastructure including security fencing, CCTV cameras, an internal access track, underground cabling, inverters, substations, grid connection, environmental enhancement measures and other ancillary development.
1.2Construction would take 6 months. The site would have an operational life of up to 40 years, after which it would be decommissioned, and the agricultural land would be reinstated.
1.3The solar park would consist of photovoltaic solar arrays with a maximum height of 3m (limited to 2.1m in the south-western part of the site). The panels would be mounted to a metal frame securely fixed with appropriate ground piles and located in the areas shown on Plan 2 below.
Plan 2 – Site layout
1.4The PV panels would be mounted in rows across the site in an east-west orientation to face the south at 15 to 25 degrees from the horizontal to maximise efficiency, with a maximum height of 2.8m. Approximately 95%7 of the land between the solar panels will be accessible for plant growth, biodiversity enhancements and complementary agricultural activities such as sheep grazing, during the operational phase of the scheme. 1.5 The following structures are also proposed:
Inverter Substation Deer proof perimeter fencing and access gates Infrared CCTV fixed on poles Landscaping and Biodiversity Enhancement Areas WPD Substation Compound 25m Communications Tower Customer Switchroom DNO Switchroom
1.6The construction and decommissioning phases would also require the utilisati on of a Temporary Site Compound positioned adjacent to the access point
1.7Substations and Grid Connection: The proposed substation and associated ancillary infrastructure would be located in the north - western area of the site, to the north of the existing 132kV high voltage Overhead Line. An underground 132kV cable would connect the substation to an existing tower on the site. This position uses established vegetation and nearby woodland as a visual screen and wooded backdrop. Swales are proposed at locations around the periphery of the site as part of the drainage strategy.
1.8Footpath: A right of way (footpath 0529/10A/1) running south-east to north-west through the eastern parcel of the Site would be retained and one of the proposed Biodiversity Enhancement Areas is at this location.
1.9Security Fencing and Access Gates: The solar farm would be enclosed by a 2.5m high perimeter deer fence with small mammal access points to allow the passage of wildlife.
1.10CCTV and Lighting: In addition to fencing, it is proposed that 2.5m high pole mounted CCTV security cameras will be installed inside and around the Site. The CCTV system operates by infrared which will avoid the need for floodlighting. The development would not require any external lighting during the operational phase.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.