Proposed Solar Farm to the east of Squirrel Lane, Ledwyche, Ludlow (22/02151/FUL)

Refused Planning 1 paper

Southern Planning Committee refused this item on Tuesday 27 September 2022. Below is the council's own wording, with the papers it was decided on.

Item64

Resolved

That contrary to the Officer recommendation planning permission be refused as the application would result in the loss of best and most versatile agricultural land and would have an adverse effect on the setting of the AONB and public rights of way and hence would be contrary to paragraph 174 B of the NPPF, Core Strategy Policy CS6 (and the accompanying explanatory paragraphs) and policy DP26 of the emerging local plan.
Word for word from the decision Shropshire published for this meeting. Source: www.shropshire.gov.uk

Follow this further

Built from Shropshire's papers

What the report saysPro

Report to Southern Planning Committee, 54 pages

Committee and date

Southern Planning Committee

20th September 2022

Development Management Report

Responsible Officer: Tracy Darke, Assistant Director of Economy & Place

Summary of Application

Application Number: 22/02151/FUL Parish: Bitterley PC Proposal: Formation of solar farm including installation of solar panels, construction compound, security fencing, CCTV cameras, an internal access track, underground cabling, invertors, substations, grid connection and other ancillary development

Site Address: Proposed Solar Farm to the east of Squirrel Lane, Ledwyche, Ludlow

Applicant: Ledwyche Solar Limited (Locogen)

Case Officer: Grahame French email: [email protected]

Recommendation:- Approve subject to the conditions set out in Appendix 1. REPORT

1.0THE PROPOSAL

1.1The application is for a solar generating facility with a capacity of up to 12 MW on land to the east of Squirrel Lane, Ledwyche, near Ludlow, Shropshire. The proposal includes solar panels, security fencing, CCTV cameras, an internal access track, underground cabling, inverters, substations, grid connection, environmental enhancement measures and other ancillary development (the Proposed Development).

1.2Construction would take up to 6 months. The site would have an operational life of up to 40 years, after which it would be de-commissioned and the agricultural land would be reinstated.

1.3The solar park would consist of photovoltaic solar arrays with a maximum height of 3m (limited to 2.1m in the south-western part of the site). The panels would be mounted to a metal frame securely fixed with appropriate ground piles and located in the areas shown on Plan 2 below. The following supporting infrastructure would also be required:

 Inverters enclosure with a max height of 2.6m;  Transformers enclosure with a max height of 3.2m;  Switchgear enclosure with a max height of 3.2m;  Customer’s and DNO substations with a max height of 4.4m;  A communication building with a max height of 4.4m; and,  A storage building with a max height of 3.2m.

Plan 2 – Site layout 1.4 The following structures are also proposed:

i. Construction compound – This retained hardstanding c50 x 60m area is required for the delivery and assembly of the solar array equipment. During operation, the area will be used primarily for agricultural purposes as well as occasional maintenance works. The compound will also be needed when the site is decommissioned at the end of its operational lifetime ii. Fencing – A c2.0m high deer fence is proposed around the full perimeter of the panels for security reasons.

iii. Security – A security and monitoring system employing infrared motion detection and CCTV will be employed. All CCTV cameras will be carefully positioned to face into the land within the application site boundary. These systems will be discrete, mounted no higher than 3m above the ground. No permanent security lighting is proposed.

iv. Grid connection and cabling – The cable connecting the solar array to the proposed grid connection point will be buried underground to minimise visual impacts. It would be laid alongside the public right of way route to the south of the Proposed Development with appropriate management whilst the work is taking place. The applicant has confirmed grid availability with Western Power Distribution. The electricity would be exported to the local distribution network for sale as part of a long-term power purchase contract.

1.5Access to the site would be gained from Squirrel Lane on the northern side of the development. A construction management plan would determine the timing of deliveries and the proposed route to the development from the principal road network. Following construction there would be periodic visits to the site for occasional repair work. Around 700m of access track is required within the site and would be constructed with gravel on a permeable compressed stone base.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Proposed Solar Farm to the east of Squirrel Lane, Ledwyche, Ludlow (22/02151/FUL)Report 54 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Shropshire

Search all
  1. Proposed Solar Farm to the east of Squirrel Lane, Ledwyche, Ludlow (22/02151/FUL)This decision
  2. Proposed Solar Farm SE of Rock Farm, Rocks Green, Ludlow (22/05424/EIA)Approved
  3. Proposed Solar Farm to the west of Berrington, Shrewsbury, SY5 6HA (22/04355/FUL)Refused
  4. Proposed Solar Farm to the south of Hall Lane, Kemberton, Shifnal (22/02441/FUL)Refused
  5. Proposed Solar Farm to the south of Holyhead Road, Albrighton (22/03068/FUL)Agreed
  6. Proposed Solar Farm At Rhosygadfa, Gobowen, Shropshire (16/05607/FUL)Decided

More from Shropshire Southern Planning Committee

All decisions
MeetingDecisionOutcome
26 May 2026 MinutesThat the of the meetings of the Southern Planning Committee held on Tuesday 24 February 2026 and 14 May 2026 be appro... Approved Open
26 May 2026 Proposed Residential Development Land East of Ford Shrewsbury Shropshire (25/04301/FUL)RESOLVED That contrary to officer recommendation planning permission be refused for the following reasons: · The appl... Refused Open
26 May 2026 Swancote Energy Ltd Anaerobic Digestion Plant at Swancote Farm, Swancote, Bridgnorth (25/02645/VAR)RESOLVED That in accordance with Officer recommendation planning permission be granted subject to the conditions set ... Decided Open
26 May 2026 Proposed Residential Development Land Off Benthall Lane And Bridge Bank Benthall Broseley Shropshire (25/03946/OUT)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... Decided Open
26 May 2026 Proposed Residential Development Land East Of Shaw Lane Albrighton Shropshire (25/03227/REM)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies