CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Feb5Thursday

Audit & Governance Committee

ShropshireHeldPapers from www.shropshire.gov.uk
Thursday 5 February 2026, 10.00amHeld 292 days ago.
Council ChamberThe Guildhall, Frankwell Quay, Shrewsbury, SY3 8HQ. Open to the public.
20 items, 22 papersAbout 12 MB, led by Second line assurance: Treasury Strategy 2026/27.
No exempt items listedEvery item is due to be heard in public.
This meeting was held5 February 2026
20items
22papers
10decisions
–exempt
Running order, sized by papersItem 84 to 103
ReportsProcedureExempt parts

AI summaryWhat Audit & Governance Committee decided

Checked against 8 papers PDF briefing Pro
7decisions 1agreed2approved1noted 2with money Topicsgovernance, finance
90
Agreed
First line assurance: Adult Social Care Outturn Management UpdateAudit & Governance Committee agreed current Adult Social Care outturn assurance is first-line only and asked Internal Audit to revisit in early March 2026 to validate savings documentation and controls. Councillor Lumby abstained.
£16.1mPeople Directorate overspend variance in 2024/25
Read in full
94
Noted
Third line assurance: Report of the Internal Audit Review of Risk ManagementShropshire Council's Audit & Governance Committee noted concern about the limited assurance rating for risk management while recognising that work was underway.
–
Read in full
95
Approved
Second line assurance: Treasury Strategy 2026/27Shropshire's Audit & Governance Committee approved the Treasury Management Strategy 2026/27, with a proviso that officers provide a supplementary paper on EFS contingency planning and confirm EFS implications are being fully considered in financial planning.
£415mAs at 31 December 2025
Read in full
96
Decided
Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26Shropshire Council's Audit & Governance Committee endorsed a revised annual internal audit plan for 2025/26, with new unsatisfactory or limited assurance opinions on budget monitoring, coroners, travel and other services.
–
Read in full
97
Decided
Third line assurance: Internal Audit Plan 2026/27Shropshire Council's Audit and Governance Committee has endorsed the Internal Audit Annual Plan for 2026/27, scheduling audits across social care, IT, finance, governance and procurement.
–
Read in full
98
Approved
Governance assurance: Draft Audit Committee Work Plan and Future Training RequirementsShropshire Council's Audit and Governance Committee approved its annual work plan and future learning and development programme for 2026/27, setting the schedule of assurance reports and training it will receive from June 2026 to February 2027.
–
Read in full
101
Decided
Exclusion of Press and PublicPlain-English summary not ready yet. The council's wording: That in accordance with the provision of Schedule 12A of the Local Government Act 1972, Section 5 of the Local Authorities (Executive Arrangements)...
–
Council decision
1 procedural item (apologies, declarations, minutes and the like) is not summarised.
Written by AI from the council's own reports and checked against them before publishing. Each decision page shows the sources, paragraph by paragraph.Report a problem

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Second line assurance: Treasury Strategy 2026/27 is the main business.

84
Procedure

Apologies for Absence / Notification of Substitutes

85
Procedure

Disclosable Pecuniary Interests

Members are reminded that they must declare their disclosable pecuniary interests and other registrable or non-registrable interests in any matter being considered at the meeting as set out in Appendix B of the Members’ Code of Conduct and consider if they should leave the room prior to the item being considered. Further advice can be sought from the Monitoring Officer in advance of the meeting.

86
Report

Minutes of the previous meeting held on the 27 November 2025

The Minutes of the meeting held on the 27 November 2025 are attached for confirmation. Contact Michelle Dulson (01743) 257719

Decision: That the Minutes of the meeting of the Audit Committee held on the 27 November 2025 be approved as a true record and signed by the Chairman Decision page

1 paper, 306 KBSearch inside with Pro
ReportMinutes of the previous meeting held on the 27 November 2025306 KBDownload
87
Report

Public Questions

To receive any questions from the public, notice of which has been given in accordance with Procedure Rule 14. The deadline for this meeting is 12noon on Friday 30 January 2026.

1 paper, 188 KBSearch inside with Pro
ReportPublic Questions188 KBDownload
88
Procedure

Member Questions

To receive any questions from the public, notice of which has been given in accordance with Procedure Rule 14. The deadline for this meeting is 12noon on Friday 30 January 2026.

89
Report

First line assurance: Improvement Plan Update

The report of the Interim Chief Executive is attached. Contact: Tanya Miles (01743) 255811

1 paper, 304 KBSearch inside with Pro
ReportFirst line assurance: Improvement Plan Update304 KBDownload
90
Report

First line assurance: Adult Social Care Outturn Management Update

The report of the Interim Chief Executive is to follow. Contact: Tanya Miles (01743) 255811

Decision: To agreed that the current assurance was first-line only and to proposed that Internal Audit revisit the area to provide independent validation of controls, especially regarding savings documentation and prevention of recurrence. Councillor Lumby abstained from voting for this recommendation. Decision page

2 papers, 322 KBSearch inside with Pro
AppendixAppendix 1: Recommendations and Management Action Plan: current87 KBDownload
ReportFirst line assurance: Adult Social Care Outturn Management Update235 KBDownload
91
Report

First line assurance: Supply Contracts Management Update

The report of the Service Director for Commissioning is attached. Contact: Laura Tyler (01743) 253178

2 papers, 1.4 MBSearch inside with Pro
ReportFirst line assurance: Supply Contracts Management Update814 KBDownload
ReportProcurement and contract Transformation plan635 KBDownload
92
Report

First line assurance: Shirehall Decant Management Update

The report of the Head of Property and Development is to follow. Contact: Steve Law (01743) 281017

1 paper, 357 KBSearch inside with Pro
ReportFirst line assurance: Shirehall Decant Management Update357 KBDownload
93
Report

Second line assurance: Strategic Risks Update

The report of the Strategy and Scrutiny Manager is to follow. Contact: Tom Dodds (01743) 258518

1 paper, 227 KBSearch inside with Pro
ReportSecond line assurance: Strategic Risks Update227 KBDownload
94
Report

Third line assurance: Report of the Internal Audit Review of Risk Management

The report of the Internal Audit Manager is attached. Contact: Katie Williams (01743) 255637

Decision: To note concern regarding the limited assurance rating for risk management whilst recognising that work was underway ... view the full minutes text for item 94. Decision page

1 paper, 305 KBSearch inside with Pro
ReportThird line assurance: Report of the Internal Audit Review of Risk Management305 KBDownload
95
ReportMain business

Second line assurance: Treasury Strategy 2026/27

The report of the Interim Director of Finance for Improvement is to follow. Contact: Duncan Whitfield

Decision: To approve the Treasury Management Strategy with the proviso that a supplementary paper be provided setting out contingency planning relating to EFS and to confirm that the implications of EFS were being fully considered within the Council’s financial planning. Decision page

2 papers, 1.7 MBSearch inside with Pro
Appendix20260211 Appendix 1: TREASURY MANAGEMENT STRATEGY 2026-271.3 MBDownload
ReportSecond line assurance: Treasury Strategy 2026/27323 KBDownload
96
Report

Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26

The report of the Head of Policy and Governance is attached. Contact: Barry Hanson [phone removed]

Decision: To endorse the revised annual audit plan and request that ... view the full minutes text for item 96. Decision page

1 paper, 994 KBSearch inside with Pro
ReportThird line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26994 KBDownload
97
Report

Third line assurance: Internal Audit Plan 2026/27

The report of the Head of Policy and Governance is attached. Contact: Barry Hanson [phone removed]

Decision: To endorse the Internal Audit Annual Plan for 2026/27. Decision page

1 paper, 811 KBSearch inside with Pro
ReportThird line assurance: Internal Audit Plan 2026/27811 KBDownload
98
Report

Governance assurance: Draft Audit Committee Work Plan and Future Training Requirements

The report of the Head of Policy and Governance is attached. Contact: Barry Hanson [phone removed]

Decision: To approve the annual work plan and the future learning and development programme for 2026/27. Decision page

1 paper, 746 KBSearch inside with Pro
ReportGovernance assurance: Draft Audit Committee Work Plan and Future Training Requirements746 KBDownload
99
Procedure

Date and Time of Next Meeting

The next meeting of the Audit & Governance Committee will be held on the 25 June 2026 at 10.00 am.

101
Procedure

Exclusion of Press and Public

To RESOLVE that in accordance with the provision of Schedule 12A of the Local Government Act 1972, Section 5 of the Local Authorities (Executive Arrangements)(Meetings and Access to Information)(England) Regulations and Paragraphs 2, 3 and 7 of the Council’s Access to Information Rules, the public and press be excluded during consideration of the following items.

Decision: That in accordance with the provision of Schedule 12A of the Local Government Act 1972, Section 5 of the Local Authorities (Executive Arrangements)(Meetings and Access to Information)(England) Regulations and Paragraphs 1, 2, 3 and 7 of the Council’s Access to Information Rules, the public and press be excluded during consideration of the following items. Decision page

102
Procedure

Exempt Minutes of the previous meeting held on the 27 November 2025

The Exempt Minutes of the meeting held on the 27 November 2025 are attached for confirmation. Contact Michelle Dulson (01743) 257719

Decision: That the Exempt Minutes of the meeting of the Audit Committee held on the 27 November 2025 be approved as a true record and signed by the Chairman.

103
Procedure

Third line assurance: Contract Rules Exemptions Update (Exempted by Category 3)

The report of the Assistant Director of Legal and Governance is attached. Contact: Tim Collard (01743) 252756

Decision: To note the contents of the report.

Read inside all 22 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

What this meeting moved on

1 journey

The main business: Second line assurance: Treasury Strategy 2026/27

Item 95 is where most of this meeting's papers sit: 2 papers, about 1.7 MB.

Item 95

Second line assurance: Treasury Strategy 2026/27

The report of the Interim Director of Finance for Improvement is to follow. Contact: Duncan Whitfield

What is in the pack2 papers, about 1.7 MB
Appendix
20260211 Appendix 1: TREASURY MANAGEMENT STRATEGY 2026-27Supporting paper
1.3 MB
Report
Second line assurance: Treasury Strategy 2026/27The report to the committee
323 KB
Read and search every page of this itemPro opens all 2 papers, and keeps them if the council removes them.

How this item got here

This committee has dealt with the subject before.

27 November 2025Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26The report of the Head of Policy and Governance is attached. Contact: Barry Hanson [phone removed]
27 November 2025Third line assurance: External Audit: Draft Auditors Annual ReportThe report of the Engagement Lead is attached. Contact: Avtar S Sohal (0121) 232 6420
27 November 2025First line assurance: Internal Control Management UpdateThe report of the Interim Chief Executive is attached. Contact: Tanya Miles (01743) 255811
5 February 2026Second line assurance: Treasury Strategy 2026/27This meeting.

Every paper for this meeting

All 22 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Agenda frontsheetItem
406 KB
Kept 2 Oct
Printed minutesItem
300 KB
Kept 2 Oct
To Follow: Shirehall Decant Management UpdateItem
504 KB
Kept 2 Oct
To Follow REeport: Treasury Strategy 2026-27Item
1.8 MB
Kept 2 Oct
To Follow Report: Adult Social Care Outturn Management UpdateItem
438 KB
Kept 2 Oct
To Follow Report: Strategic Risks UpdateItem
397 KB
Kept 2 Oct
Minutes of the previous meeting held on the 27 November 2025Item 86, Minutes of the previous meeting held on the 27 November 2025
306 KB
Kept 2 Oct
Public QuestionsItem 87, Public Questions
188 KB
Kept 2 Oct
First line assurance: Improvement Plan UpdateItem 89, First line assurance: Improvement Plan Update
304 KB
Kept 2 Oct
Recommendations and Management Action Plan: currentAppendix 1, item 90, First line assurance: Adult Social Care Outturn Management Update
87 KB
Kept 2 Oct
First line assurance: Adult Social Care Outturn Management UpdateItem 90, First line assurance: Adult Social Care Outturn Management Update
235 KB
Kept 2 Oct
First line assurance: Supply Contracts Management UpdateItem 91, First line assurance: Supply Contracts Management Update
814 KB
Kept 2 Oct
Procurement and contract Transformation planItem 91, First line assurance: Supply Contracts Management Update
635 KB
Kept 2 Oct
First line assurance: Shirehall Decant Management UpdateItem 92, First line assurance: Shirehall Decant Management Update
357 KB
Kept 2 Oct
Second line assurance: Strategic Risks UpdateItem 93, Second line assurance: Strategic Risks Update
227 KB
Kept 2 Oct
Third line assurance: Report of the Internal Audit Review of Risk ManagementItem 94, Third line assurance: Report of the Internal Audit Review of Risk Management
305 KB
Kept 2 Oct
20260211 Appendix 1: TREASURY MANAGEMENT STRATEGY 2026-27Item 95, Second line assurance: Treasury Strategy 2026/27
1.3 MB
Kept 2 Oct
Second line assurance: Treasury Strategy 2026/27Item 95, Second line assurance: Treasury Strategy 2026/27
323 KB
Kept 2 Oct
Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26Item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
994 KB
Kept 2 Oct
Third line assurance: Internal Audit Plan 2026/27Item 97, Third line assurance: Internal Audit Plan 2026/27
811 KB
Kept 2 Oct
Governance assurance: Draft Audit Committee Work Plan and Future Training RequirementsItem 98, Governance assurance: Draft Audit Committee Work Plan and Future Training Requirements
746 KB
Kept 2 Oct
Action LogItem 100, Action Log
229 KB
Kept 2 Oct

Last time, and what carried over

The committee last met on 27 November 2025. 14 of its items lead into this meeting; 1 item is new. Point at any item to follow a thread. Procedural items are left out.

Nov27
27 November 202523 items, 32 papers
Held
carried over
Feb5
5 February 202620 items, 22 papers
Held
63
Minutes of the previous meeting held on the 26 September 2025The Minutes of the meeting held on the 26 September 2025 are attached...
66
First line assurance: Internal Control Management UpdateThe report of the Interim Chief Executive is attached. Contact: Tanya...
67
Third line assurance: External Audit: Draft Auditors Annual ReportThe report of the Engagement Lead is attached. Contact: Avtar S Sohal...
68
Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26The report of the Head of Policy and Governance is attached. Contact...
69
First Line Assurance: ASC Outturn Update (Period 13)The report of the Interim Chief Executive is attached. Contact: Tanya...
70
First line assurance: The Lantern Management UpdateThe report of the Property Services Group (PSG) Facilities and...
71
First line assurance: Deferred Payments Management UpdateThe report of the Team Leader for Business Support is attached....
72
Second line assurance: Treasury Strategy Mid-Year Report 2025/26The report of the Executive Director of Resources (Section 151...
73
Governance Assurance: Annual Audit Committee Self-AssessmentThe report of the Executive Director of Resources (Section 151...
74
Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud InitiativeThe report of the Head of Policy and Governance is attached. Contact...
75
First line assurance: Final Approval Statement of Accounts 2024/25The report of the Executive Director of Resources (Section 151...
76
Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25The report of the Engagement Lead is attached. Contact: Avtar S Sohal...
77
Third Line Assurance: Fraud, Special Investigation, RIPA UpdateThe report of the Internal Audit Manager is attached. Contact: Katie...
78
Fraud Investigation OptionsThe report of the Executive Director of Resources (Section 151...
80
Action LogA review of meeting actions.
86
Minutes of the previous meeting held on the 27 November 2025The Minutes of the meeting held on the 27 November 2025 are attached...
87
Public QuestionsNew this time
89
First line assurance: Improvement Plan UpdateThe report of the Interim Chief Executive is attached. Contact: Tanya...
90
First line assurance: Adult Social Care Outturn Management UpdateThe report of the Interim Chief Executive is to follow. Contact...
91
First line assurance: Supply Contracts Management UpdateThe report of the Service Director for Commissioning is attached....
92
First line assurance: Shirehall Decant Management UpdateThe report of the Head of Property and Development is to follow....
93
Second line assurance: Strategic Risks UpdateThe report of the Strategy and Scrutiny Manager is to follow....
94
Third line assurance: Report of the Internal Audit Review of Risk ManagementThe report of the Internal Audit Manager is attached. Contact: Katie...
95
Second line assurance: Treasury Strategy 2026/27The report of the Interim Director of Finance for Improvement is to...
96
Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26The report of the Head of Policy and Governance is attached. Contact...
97
Third line assurance: Internal Audit Plan 2026/27The report of the Head of Policy and Governance is attached. Contact...
98
Governance assurance: Draft Audit Committee Work Plan and Future Training RequirementsThe report of the Head of Policy and Governance is attached. Contact...
100
Action LogA review of meeting actions.

The threads

  • Minutes of the previous meeting held on the 26 September 2025 leads to item 86, Minutes of the previous meeting held on the 27 November 2025
  • First line assurance: Internal Control Management Update leads to item 89, First line assurance: Improvement Plan Update
  • First line assurance: Internal Control Management Update leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • First line assurance: Internal Control Management Update leads to item 91, First line assurance: Supply Contracts Management Update
  • First line assurance: Internal Control Management Update leads to item 92, First line assurance: Shirehall Decant Management Update
  • First line assurance: Internal Control Management Update leads to item 93, Second line assurance: Strategic Risks Update
  • First line assurance: Internal Control Management Update leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • First line assurance: Internal Control Management Update leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • First line assurance: Internal Control Management Update leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • First line assurance: Internal Control Management Update leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 89, First line assurance: Improvement Plan Update
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 91, First line assurance: Supply Contracts Management Update
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 92, First line assurance: Shirehall Decant Management Update
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 93, Second line assurance: Strategic Risks Update
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • Third line assurance: External Audit: Draft Auditors Annual Report leads to item 98, Governance assurance: Draft Audit Committee Work Plan and Future Training Requirements
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 89, First line assurance: Improvement Plan Update
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 91, First line assurance: Supply Contracts Management Update
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 92, First line assurance: Shirehall Decant Management Update
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 93, Second line assurance: Strategic Risks Update
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • Third line assurance: Internal Audit Performance Report and revised Annual Audit Plan 2025/26 leads to item 98, Governance assurance: Draft Audit Committee Work Plan and Future Training Requirements
  • First Line Assurance: ASC Outturn Update (Period 13) leads to item 89, First line assurance: Improvement Plan Update
  • First Line Assurance: ASC Outturn Update (Period 13) leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • First Line Assurance: ASC Outturn Update (Period 13) leads to item 91, First line assurance: Supply Contracts Management Update
  • First Line Assurance: ASC Outturn Update (Period 13) leads to item 92, First line assurance: Shirehall Decant Management Update
  • First Line Assurance: ASC Outturn Update (Period 13) leads to item 93, Second line assurance: Strategic Risks Update
  • First Line Assurance: ASC Outturn Update (Period 13) leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • First Line Assurance: ASC Outturn Update (Period 13) leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • First Line Assurance: ASC Outturn Update (Period 13) leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • First Line Assurance: ASC Outturn Update (Period 13) leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • First line assurance: The Lantern Management Update leads to item 89, First line assurance: Improvement Plan Update
  • First line assurance: The Lantern Management Update leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • First line assurance: The Lantern Management Update leads to item 91, First line assurance: Supply Contracts Management Update
  • First line assurance: The Lantern Management Update leads to item 92, First line assurance: Shirehall Decant Management Update
  • First line assurance: The Lantern Management Update leads to item 93, Second line assurance: Strategic Risks Update
  • First line assurance: The Lantern Management Update leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • First line assurance: The Lantern Management Update leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • First line assurance: The Lantern Management Update leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • First line assurance: The Lantern Management Update leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • First line assurance: Deferred Payments Management Update leads to item 89, First line assurance: Improvement Plan Update
  • First line assurance: Deferred Payments Management Update leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • First line assurance: Deferred Payments Management Update leads to item 91, First line assurance: Supply Contracts Management Update
  • First line assurance: Deferred Payments Management Update leads to item 92, First line assurance: Shirehall Decant Management Update
  • First line assurance: Deferred Payments Management Update leads to item 93, Second line assurance: Strategic Risks Update
  • First line assurance: Deferred Payments Management Update leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • First line assurance: Deferred Payments Management Update leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • First line assurance: Deferred Payments Management Update leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • First line assurance: Deferred Payments Management Update leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • Second line assurance: Treasury Strategy Mid-Year Report 2025/26 leads to item 89, First line assurance: Improvement Plan Update
  • Second line assurance: Treasury Strategy Mid-Year Report 2025/26 leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • Second line assurance: Treasury Strategy Mid-Year Report 2025/26 leads to item 91, First line assurance: Supply Contracts Management Update
  • Second line assurance: Treasury Strategy Mid-Year Report 2025/26 leads to item 92, First line assurance: Shirehall Decant Management Update
  • Second line assurance: Treasury Strategy Mid-Year Report 2025/26 leads to item 93, Second line assurance: Strategic Risks Update
  • Second line assurance: Treasury Strategy Mid-Year Report 2025/26 leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • Second line assurance: Treasury Strategy Mid-Year Report 2025/26 leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • Second line assurance: Treasury Strategy Mid-Year Report 2025/26 leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • Second line assurance: Treasury Strategy Mid-Year Report 2025/26 leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • Governance Assurance: Annual Audit Committee Self-Assessment leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • Governance Assurance: Annual Audit Committee Self-Assessment leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • Governance Assurance: Annual Audit Committee Self-Assessment leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • Governance Assurance: Annual Audit Committee Self-Assessment leads to item 98, Governance assurance: Draft Audit Committee Work Plan and Future Training Requirements
  • Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud Initiative leads to item 89, First line assurance: Improvement Plan Update
  • Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud Initiative leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud Initiative leads to item 91, First line assurance: Supply Contracts Management Update
  • Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud Initiative leads to item 92, First line assurance: Shirehall Decant Management Update
  • Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud Initiative leads to item 93, Second line assurance: Strategic Risks Update
  • Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud Initiative leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud Initiative leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud Initiative leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • Second line assurance: Annual review of Counter Fraud, Bribery and Anti-Corruption Strategy and activities, including an update on the National Fraud Initiative leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • First line assurance: Final Approval Statement of Accounts 2024/25 leads to item 89, First line assurance: Improvement Plan Update
  • First line assurance: Final Approval Statement of Accounts 2024/25 leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • First line assurance: Final Approval Statement of Accounts 2024/25 leads to item 91, First line assurance: Supply Contracts Management Update
  • First line assurance: Final Approval Statement of Accounts 2024/25 leads to item 92, First line assurance: Shirehall Decant Management Update
  • First line assurance: Final Approval Statement of Accounts 2024/25 leads to item 93, Second line assurance: Strategic Risks Update
  • First line assurance: Final Approval Statement of Accounts 2024/25 leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • First line assurance: Final Approval Statement of Accounts 2024/25 leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • First line assurance: Final Approval Statement of Accounts 2024/25 leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • First line assurance: Final Approval Statement of Accounts 2024/25 leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 89, First line assurance: Improvement Plan Update
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 91, First line assurance: Supply Contracts Management Update
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 92, First line assurance: Shirehall Decant Management Update
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 93, Second line assurance: Strategic Risks Update
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • Third line of assurance: External Audit: Shropshire Council Audit Findings Report 2024/25 leads to item 98, Governance assurance: Draft Audit Committee Work Plan and Future Training Requirements
  • Third Line Assurance: Fraud, Special Investigation, RIPA Update leads to item 89, First line assurance: Improvement Plan Update
  • Third Line Assurance: Fraud, Special Investigation, RIPA Update leads to item 90, First line assurance: Adult Social Care Outturn Management Update
  • Third Line Assurance: Fraud, Special Investigation, RIPA Update leads to item 91, First line assurance: Supply Contracts Management Update
  • Third Line Assurance: Fraud, Special Investigation, RIPA Update leads to item 92, First line assurance: Shirehall Decant Management Update
  • Third Line Assurance: Fraud, Special Investigation, RIPA Update leads to item 93, Second line assurance: Strategic Risks Update
  • Third Line Assurance: Fraud, Special Investigation, RIPA Update leads to item 94, Third line assurance: Report of the Internal Audit Review of Risk Management
  • Third Line Assurance: Fraud, Special Investigation, RIPA Update leads to item 95, Second line assurance: Treasury Strategy 2026/27
  • Third Line Assurance: Fraud, Special Investigation, RIPA Update leads to item 96, Third line assurance: Internal Audit Performance Report and Revised Annual Audit Plan 2025/26
  • Third Line Assurance: Fraud, Special Investigation, RIPA Update leads to item 97, Third line assurance: Internal Audit Plan 2026/27
  • Action Log leads to item 100, Action Log

Not carried over

Fraud Investigation Options do not return this time.

See the 27 November meeting

This committee over time

Every Audit & Governance Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

8 meetings, 2025 to 2026Dot size shows the number of papers
20252026
HeldThis meeting
MeetingItemsPapers
26 Nov 2026Thursday
19items
19papers
UpcomingOpen
25 Sep 2026Friday
16items
14papers
HeldOpen
15 Jul 2026Wednesday
12items
17papers
HeldOpen
25 Jun 2026Thursday
17items
14papers
HeldOpen
14 May 2026Thursday
3items
3papers
HeldOpen
5 Feb 2026Thursday, this meeting
20items
22papers
27 Nov 2025Thursday
23items
32papers
HeldOpen
26 Sep 2025Friday
21items
19papers
HeldOpen

Follow the Audit & Governance Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Shropshire, Audit & Governance Committee

Audit & Governance Committee: 3 kinds of updateShropshire, sent the same day
PDF
22 papers published for 5 FebruarySecond line assurance: Treasury Strategy 2026/27 and 21 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 5 FebruaryThe committee's resolutions, the day they are recorded
ABC
"second" found in 2 papersSecond line assurance: Strategic Risks Update and Second line assurance: Treasury Strategy 2026/27
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Audit & Governance Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies