Resolved
The Cabinet Member:- i ). Noted the progress of the major project
CPH Transport & Highways Decision Session noted this item on Thursday 25 February 2016. Below is the council's own wording, with the papers it was decided on.
Resolved
The Cabinet Member:- i ). Noted the progress of the major project
1.1To update on the progress of the work on the A45 South Bridge replacement project.
2. Decision(s) Recommended
2.1The Cabinet Member is asked to :-
i. Note the progress of the major project 3. Progress
3.2The A45 South Bridge Replacement Major Scheme replaces a vital bridge in Solihull on the A45, and over the West Coast Mainline. The A45 is a key route, forming an important gateway to the West Midlands and providing vital access to major and unique strategic economic assets, including Birmingham Airport, the National Exhibition Centre (NEC), Birmingham International station, Jaguar Land Rover, Birmingham Business Park and the South Birmingham Corridor. The road carries well in excess of 50,000 vehicles per day (AADT) both ways, with westbound counts showing average daily flows of 28-30,000 vehicles, with significant peaks in excess of this when major events are held at the NEC, such as Crufts
3.3The scheme is part of a package of measures over the last 5 years to improve the A45 in this area which has included the A45 Corridor works adjacent to Birmingham Airport, “pinchpoint” works by Highways England at M42 Junction 6 and the widening by Birmingham Airport of the westbound A45 either side of this bridge.
3.4The A45 South Bridge Replacement Major Scheme has the objectives to increase capacity at a key route in our region as well as to replace an old brick arch bridge structure over the busy main Birmingham to London electrified railway. The replacement bridge will create an additional lane of traffic and increase the width of the other 3 lanes improving road safety and reducing congestion.
Design
3.5The bridge is designed to span over the railway and to allow for 4 railway tracks in the future. As reported in the last report, the detailed design drawings of the replacement bridge were completed and approved early in 2015 to allow construction to proceed by our Contractor Carillion Construction Ltd (CCL) and with consultants, SLC Rail, as our project managers.
3.6Construction
3.7Your Officers gave careful consideration to the programming of the works on this busy section of the A45. Construction of the widened roads was completed in December 2014 by Birmingham Airport. The bridge has been split into two phases in order to facilitate the construction and maintain three lanes of A45 traffic at all peak times.
3.8The southern section of the bridge was completed on time and traffic was diverted off the old existing bridge onto the southern section of the new bridge in November 2015. The demolition of the old existing bridge was successfully completed during the 54 hour possession over the railway at Christmas 2015 and work is now continuing on completing the northern section of the bridge.
3.9Construction has continued to be on programme and work is progressing well. Any issues arising from a complicated job of this size are being managed successfully by the Project Team. The remaining utilities were diverted out of the old bridge with the last utility, a medium pressure gas main, completed in November 2015. 3.10 The new widened bridge will then be re-opened with the additional lane as well as a cycleway and footpath with an expected completion date of 6th September, 2016.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
A45 SOUTH BRIDGE: UPDATE REPORT.Report | 175 KB | DownloadRead as text |
Follow CPH Transport & Highways Decision Session at Solihull and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 28 Mar 2019 | Apologies and SubstitutionsApologies from Councillor D Cole. | Decided | Open |
| 28 Mar 2019 | Declarations of InterestNone. | Decided | Open |
| 28 Mar 2019 | Questions and DeputationsCouncillor T Hodgson attended and addressed the meeting in relation to Petitions 5 & 6 – Request to keep the 3 hours ... | Decided | Open |
| 28 Mar 2019 | Petition SummaryThe Cabinet Member: (a) Noted the petitions received and the proposed programme for investigating and responding to t... | Noted | Open |
| 28 Mar 2019 | Revenue & Capital Monitoring 2018/19 as at 31st December 2018The Cabinet Member: 1. Considered and endorsed the 2018/19 revenue and capital financial monitoring forecast as at 31... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.