Resolved
Resolved :- That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin not later than three years of the date of this decision Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 02 The development hereby permitted shall be carried out in accordance with the following approved plans 385P01A, 385P02B, 385P03C, 385P04, 385P06, 385P07, 16025 (Measured topological survey April 2016), DFCP 3950 TPP (tree protection plan BY Bionomique Ltd dated 17.8.18) Reason: To ensure that the development is carried out in accordance with the Development Plan. 03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place until product details of the materials to be used on all the external elevations, including walls, roof, fascia and soffits. rooflights , windows and doors, dormer windows, porch canopy, boundary walls and fences, driveway, paving including parking area have been submitted to and approved by the local planning authority. The development shall only be carried out in accordance with the approved details. Reason: To safeguard the visual amenities of the area, in accordance with policies This is as set out in the National Planning Policy Framework (2018) Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009). 04 The first floor and second floor windows and rooflights in the north and south elevations of the proposed dwellings shall only be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy, or such equivalent as may be agreed in writing with the local planning authority) and fixed shut up to a height of 1.7m above first floor level before the occupation of the dwellings hereby approved and shall be retained as such in perpetuity. In the case of multiple or double glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4. Reason: To protect the privacy and environment of people in proposed and neighbouring residential properties, in accordance with the National Planning Policy Framework (2018), Core Strategy (2007) policy CP4, Development Management DPD (2015) policy DM1, and advice contained within the Design and Townscape Guide (2009). 05 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place until full details of both hard and soft landscape works to be carried out at the site have been submitted to and approved in writing by the local planning authority. The approved hard landscaping works shall be carried out prior to first ... view the full minutes text for item 317.