Resolved
- That PLANNING PERMISSION be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin not later than three years of the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 02 The development hereby permitted shall be carried out in accordance with the following approved plans Chalkwell Plan1 Rev E, Chalkwell Plan2 Rev E, Chalkwell Plan5 Rev E, Chalkwell Plan5A Rev E, Chalkwell Plan10 Rev E, Chalkwell Plan11 Rev E, Chalkwell Plan12, SYLVA-DET-8.62AREVD, SYLVA-DET-8.60AREVD, SYLVA-DET-8.03AREVC, SYLVA -DET-8.01AREVD Reason: To ensure that the development is carried out in accordance with the Development Plan. 03 The materials for the external surfaces of the development hereby approved shall be EBS Sanded Red Stock Brick slips with mortar joints, white through colour render, single membrane bonded roof (grey) with aluminium coping to two storey section, grey (RAL 7004) double glazed aluminium windows and doors and a matching brick boundary wall unless alternative materials are previously submitted to and agreed in writing with the Local Planning Authority. The detailing of the proposal shall be carried out only as specified on drawings reference SYLVA-DET-8.62AREVD, SYLVA-DET-8.60AREVD, SYLVA-DET-8.03AREVC, SYLVA -DET-8.01AREVD Reason: To safeguard the visual amenities of the area, in accordance with Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009). 04 The first floor flank windows in the north east and south west elevation of the two storey element of the development hereby approved shall be permanently glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy, or such equivalent as may be agreed in writing with the local planning authority) and permanently fixed shut up to a height of not less than 1.7m above first floor level before the occupation of the development hereby approved and shall be retained as such in perpetuity. In the case of multiple or double glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4. Reason: To protect the privacy and environment of people in neighbouring residential properties, in accordance with the National Planning Policy Framework (2019), Core Strategy (2007) policy CP4, Development Management Document (2015) policy DM1, and advice contained within the Design and Townscape Guide (2009). 05 No development above ground floor slab level shall take place until full details of both hard and soft landscape works to be carried out at the site have been submitted to and approved in writing by the local planning authority. The approved hard landscaping works shall be carried out prior to first occupation of the development and the soft landscaping works within the first planting season following first occupation of the development, unless ... view the full minutes text for item 35.