Resolved
- That ENFORCEMENT ACTION be AUTHORISED for the following reasons: 1. The proposal, by reason of the external staircase’s form, excessive size and scale and the rear dormers weak ratio of glazing to solid elevation constitutes poor design that would be excessively prominent and incongruous in appearance, resulting in material harm to the character and appearance of the host building and the wider rear garden scene. This harm is unacceptable and contrary to the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015) and the advice contained within the Design and Townscape Guide (2009). 2. The proposed external staircase, as a result of its size, siting and proximity to the north and south boundaries with the neighbouring properties would result in an unacceptable level of both actual and perceived overlooking and resultant loss of privacy to the occupants of Nos. 83, 81 and 79 Silverdale Avenue. This material harm to residential amenity is unacceptable and contrary to the National Planning Policy Framework (2019); Policies KP2 and CP4 of the Core Strategy (2007); Policies DM1 and DM3 of the Development Management Document (2015); and the advice contained within the Design and Townscape guide (2009). 3. The Committee resolved that the enforcement notice would include the unauthorised outbuilding which by virtue of its size, design and position appears as an excessively bulky and overbearing feature in the rear garden scene harmful to neighbour amenity which is unacceptable and conflicts with the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007), Policies DM1 and DM3 of the Southend-on-Sea Development Management Document (2015) and the advice contained within the Southend-on-Sea Design and Townscape Guide (2009). The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern with the proposal and determining the application within a timely manner, clearly setting out the reason(s) for refusal, allowing the Applicant the opportunity to consider the harm caused and whether or not it can be remedied by a revision to the proposal. The detailed analysis is set out in a report prepared by officers. In the circumstances the proposal is not considered to be sustainable development. The Local Planning Authority is willing to discuss the best course of action. Informatives You are advised that as the proposed extension(s) to your property equates to less than 100sqm of new floorspace the development benefits from a Minor Development Exemption under the Community Infrastructure Levy Regulations 2010 (as amended) and as such no charge is payable. See www.southend.gov.uk/cil for further details about CIL.