Resolved
- That PLANNING PERMISSION be REFUSED for the following reasons: 01 The proposed development is located part within a high risk Flood Risk Zone (Flood Zone 3a) and insufficient information has been submitted in terms of the sequential and exceptions test to demonstrate that there are not more suitable sites for this level of residential development elsewhere in the area and that the development will be safe for future occupiers over its lifetime. The development is therefore unacceptable and contrary to the National Planning Policy Framework (2019), and Policies KP1 and KP2 of the Core Strategy (2007). 02 The proposal has failed to demonstrate that the conversion of the outbuildings to 6 residential units and associated internal and external works to the site can be achieved without materially harming the special character and significance of the listed buildings and their unique setting. In particular the proposals will have a significant detrimental impact on the character of the outbuildings and Cockethurst Farmhouse itself due to the intensity of proposed use, scale and unsympathetic nature of the development and subdivision of the site. The lack of regard for the relationship between the outbuildings and the farmhouse would have a detrimental impact on the listed buildings and the harm identified is not outweighed by any public benefits. The proposed scheme is therefore contrary to the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007) Policies DM1, DM3 and DM5 of the Southend-on-Sea Development Management Document (2015) and advice contained within the Southend-on-Sea Design and Townscape Guide (2009). 03 The proposal has failed to demonstrate that the works proposed can be carried out without materially harming or totally transforming the outbuildings and it appears unlikely that the buildings can be converted to modern standards without serious damage to these designated heritage assets for this number of units without an unsympathetic domestic appearance being established. This harm is unacceptable and not outweighed by any public benefits. The proposed scheme is therefore contrary to the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Southend-on-Sea Core Strategy (2007) Policies DM1, DM3 and DM5 of the Southend-on-Sea Development Management Document (2015) and advice contained within the Southend-on-Sea Design and Townscape Guide (2009). 04 The proposed conversion of the outbuildings, by reason of the inadequate size of the Coach House, Dairy 1 and Dairy 2, the limited outlook to the Coach House, and poor quality of the amenity space to Coach House, Dairy 1 and Dairy 2 would result in an inadequate quality living environment, to the detriment of the amenities of the future occupiers of the proposed dwellings. This is unacceptable and contrary to National Planning Policy Framework (2019), policies KP2 and CP4 ... view the full minutes text for item 46.