CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Southend-on-Sea Borough Council
Cabinet, Monday 15 June 2026 at 6.00pm

Petition response - Save Southchurch Library from Closure

Agreed Executive 2 papers

Cabinet agreed this item on Monday 15 June 2026. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

- That Cabinet: 1. Notes the e-petition and that it is uneconomical to repair the existing library. 2. Agrees that officers will undertake a full options appraisal and equalities impact assessment for the future provision of the library service in the Southend Central East area.
Word for word from the decision Southend-on-Sea published for this meeting. Source: democracy.southend.gov.uk

Follow this further

Built from Southend-on-Sea's papers

What the report saysPro

Report to Cabinet

Southend on Sea City Council Department for Place Property & Estate Management www.southend.gov.uk

Condition Survey Report Southchurch Library

2023 Prepared for: Southend City Council

Report Written By Kathleen Spratt [email protected] 01702 215597

Printed Date: 05/12/2023

Report: KSCS#00000100

Statement of Confidentiality This proposal and supporting materials contain confidential and proprietary business information of Southend on Sea City Council. These materials may be printed or photocopied for use in evaluating the proposed project. 1 INTRODUCTION 1.1 Description The library is situated in an area comprising of commercial and residential buildings. It is within close proximity to the local high street and public transport links, local schools and public wc's. The Library has a small public car park for users.

1.2Construction The building is a single story prefabricated timber structure with a flat felt roof. The exact date of construction is not known, however, it is estimated that the building was erected in the 1960's.The building is clad externally with timber and has timber framed single glazed windows and doors. The building has a warm air heating system. The roof appears to have undergone repairs within the past 5 years. Repairs have also taken place to window and door frames, however, these appear to be sporadic and not part of an upgrade programme.

1.3Condition Surveys Condition surveys establish the physical condition of school premises. Surveyors identify repairs and maintenance works that are necessary, and the reports allow these works to be costed, prioritised and planned. This enables resources to be targeted where they are most needed and reduce the effects of unsatisfactory premises on pupils and staff.

External areas are surveyed, and all buildings for which the site has a maintenance responsibility are assessed. Buildings are generally broken down into blocks and sub-blocks – see the references on the plan for your site. Your premises are assessed, block by block, element by element, to collect information on:

· building type; · existing condition of all elements; · priority and cost of any necessary works

1.4Important Notes A/ Although Asbestos may be mentioned within this survey this survey is not a specific Asbestos survey and should not be used for this purpose. A specific Asbestos survey must be carried out by a specialist.

B/ This survey is a non intrusive visual survey and therefore does not cover hidden items.

C/No access to the roof was avaliable during the site visit. It is recommended that a roof survey is carried out.

1.5Date the survey was carried out: 5/10/23

1.6Weather conditions during the survey: Warm, dry and sunny.

1.7Address: T21 Lifstan Way, Southend-on-Sea, Essex SS1 2XG Condition Grading The condition of each element is assessed, using the following recommended grades:

Grade A - Good Performing as intended and operating efficiently.

Grade B - Satisfactory Performing as intended but exhibiting minor deterioration.

Grade C - Poor Exhibiting major defects and/or not operating as intended.

Grade D - Bad Life expired and/or serious risk of imminent failure.

Priority grading Once the condition of premises has been assessed, if any work is necessary such work will be allocated a priority according to the seriousness of the condition revealed and the urgency associated with any breaches of legislation.

The following priority grades are used in the context of a fifteen year planning period:

Priority 1. Typically urgent work that will prevent immediate closure of premises and/or address an immediate high risk to the health and safety of occupants and/or remedy a serious breach of legislation. Carry out work within 1 year.

Priority 2. Typically essential work required that will prevent serious deterioration of the fabric or services and/or address a medium risk to the health and safety of occupants and/or remedy a less serious breach of legislation. Carry out work within 2-3 years

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Petition response: Save Southchurch Library from ClosureReport 122 KB Withheld: personal details
PDF
Southchurch Library Condition Survey 2023Report 2.4 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 18 attended
DC
Councillor Daniel CowanChair, present
MS
Councillor Maxine SadzaVice-Chair, present
PC
Councillor Paul CollinsCommittee Member, present
MD
Councillor Matt DentCommittee Member, present
IF
Councillor Irene FergusonCommittee Member, present
CN
Councillor Cheryl NevinCommittee Member, present
MO
Councillor Mandy O'ConnorCommittee Member, present
KR
Councillor Kevin RobinsonCommittee Member, present
CW
Councillor Chris WebsterCommittee Member, present
RW
Councillor Ron WoodleyCommittee Member, present
SW
Councillor Steven WakefieldDeputy, present
CA
Colin AnsellOfficer, in attendance

All 18 on the meeting page

On this subject at Southend-on-Sea

Search all
  1. Petition response - Save Southchurch Library from ClosureThis decision
  2. Response to the e-Petition: Mandate to Reassess Bin Suitability in Westcliff AreasNoted
  3. Response to the e-Petition: Release Underutilised Parts of Resident Parking Zone SH from 6-9pm to Support Local BusinessNoted
  4. Response to the e Petition: Secure Burial Plots for Christians and MuslimsNoted
  5. Response to e-Petition: Stop HMO Development in SouthendAgreed

More from Southend-on-Sea Cabinet

All decisions
MeetingDecisionOutcome
12 Oct 2026 Minutes of the Meeting held on Monday, 7 September 2026That the Minutes of the Meeting held on Monday 7 September 2026 be amended to correct the typographical error in minu... Decided Open
12 Oct 2026 Decisions taken by, or in consultation with, Cabinet MembersThat the decisions taken by, or in consultation with, the relevant Cabinet Members since the last Cabinet meeting be ... Noted Open
12 Oct 2026 Official Feed and Food Control Service Plan 2026-27That the achievements delivered against the Official Feed and Food Control Service Plan 2025/26 be noted. 2. That the... Noted Open
12 Oct 2026 Income Contract with Castle Point Borough Council for CCTV System ManagementThat it be agreed to enter into a contract with Castle Point Borough Council for the provision of CCTV Services to Ca... Agreed Open
12 Oct 2026 Procurement of a Stairlift Installation, Maintenance & Removal ServiceThat approval be given to undertake a procurement exercise to establish a Framework Agreement for the provision of a ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies