Swale Highway Works Programme

Noted Committee 1 paper

Swale Joint Transportation Board noted this item on Monday 4 July 2016. Below is the council's own wording, with the papers it was decided on.

Item772

Resolved

(1) That the report be noted.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Swale Joint Transportation Board

To: Swale Joint Transportation Board

By: KCC Highways and Transportation

Date: 4th July 2016

Subject: Highway Works Programme 2016/17

Classification: Information Only

Summary: This report updates Members on the identified schemes approved for construction in 2016/17

1. Introduction

This report provides an update and summarises schemes that have been programmed for delivery in 2016/17

Footway and Carriageway Improvement Schemes – see Appendix A

Drainage Repairs & Improvements – see Appendix B

Street Lighting – see Appendix C

Traffic Systems – see Appendix D

Developer Funded Works – see Appendix E

Transportation, PROW and Safety Schemes – see Appendix F

Public Rights of Way – see Appendix G

Bridge Works – see Appendix H

Member Highway Fund – see Appendix I

Pothole Blitz 2016 – see Appendix J

Conclusion

1. This report is for Members information. Contact Officers:

The following contact officers can be contacted on 03000 418181

Kirstie Williams Highway Manager (Mid) Alan Blackburn Swale District Manager Alan Casson Resurfacing Manager Katie Moreton Drainage Manager Sue Kinsella Street Lighting Manager Toby Butler Intelligent Transport Systems Manager Andrew Hutchinson Transportation, PROW and Safety Schemes Katie Moreton Acting Structures Manager Appendix A – Footway and Carriageway Improvement Schemes

The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.

Machine Resurfacing – Contact Officer Byron Lovell

Road Name Parish Extent of Works Current Status

Roundabout and Park Road Sittingbourne approaches, junction Completed with Albany Road Westbound approach to Programmed 29th B2007 Main Road Queenborough junction with June 2016 Rushenden Road Northbound approach Programmed 27th B2006 Mill Way Sittingbourne to roundabout June 2016

Grovehurst Road and B2005 Grovehurst Rd Sittingbourne To be programmed Mill Way Roundabouts

Footway Improvement - Contact Officer Neil Tree

Road Name Parish Extent and Description Current Status of Works

Sections of footway from its junction with Roseleigh Road to its To be programmed Minterne Avenue Eastchurch junction with Woodside Gardens. (Footway Reconstruction).

North side only, from its junction with Alma Road to the change in surface Marine Parade Sheerness type opposite No. 16 To be programmed Marine Parade. (Footway Reconstruction)

South side only, From its To be programmed junction with Alma Road (Works subject to Marine Parade Sheerness to its junction with specialist contractor Richmond Street. assessment) (Footway protection treatment). Entire Length To be programmed Wards Hill Road Minster (Footway protection (Works subject to treatment). specialist contractor assessment)

To be programmed Entire Length (Works subject to Shurland Avenue Sittingbourne (Footway protection specialist contractor treatment). assessment)

Surface Treatments - Contact Officer [name removed] Name Parish Extent of Works Current Status

Chalk Road to To Be Programmed – North Street Queenborough Coronation Crescent Summer 2016 Micro Surfacing Brielle Way to Lower To Be Programmed – Queenborough Road Queenborough Road July 2016 Surface Dressing Whole length Programmed 20th Woollett Road Sittingbourne Micro Surfacing June 2016 Admiral Road to To Be Programmed – Swanton Street Bredgar Bashford Barn Lane Summer 2016 Micro Surfacing Velum Drive to railway Staplehurst Road Sittingbourne bridge Completed Surface Dressing Bysing Wood Road to Western Link Faversham Oare Road Completed Surface Dressing Newhouse Lane to Dayton Road and Sheldwich Badlesmere To Be Programmed – Ashford Road Badlesmere Green to Leaveland July 2016 Shottenden Road Surface Dressing Western Link to To Be Programmed – London Road Ospringe Faversham Road July 2016 Surface Dressing Faversham Road to To Be Programmed – Throwley Road Throwley Loose Down Road July 2016 Surface Dressing Appendix B – Drainage Repairs & Improvements

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Swale Highway Works ProgrammeReport 137 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 29 attended
DC
David Colin AustinParish Councillor, in attendance
MB
Mr Mike BaldockKent County Councillor, in attendance
CB
Councillor Cameron BeartCommittee Member, present
GB
Councillor George BobbinCommittee Member, present as substitute
AB
Mr Andrew BowlesKent County Councillor, in attendance
LB
Mr Lee BurgessKent County Councillor, in attendance
MC
Martyn CassellOfficer, in attendance
MC
Councillor Mike CosgroveCommittee Member, present
AC
Mr Adrian CrowtherKent County Councillor, in attendance
PH
Peter Henry FinchParish Councillor, present
JG
Councillor June GarradCommittee Member, apologies
TG
Mr Tom GatesKent County Councillor, in attendance

All 29 on the meeting page

On this subject at Swale

Search all
  1. Swale Highway Works ProgrammeThis decision
  2. Members Note on Highway Issues and Items for the Swale JTBNoted
  3. Swale Highway Works ProgrammeNoted
  4. Swale Highway Works Programme Report - September 2015Noted

More from Swale Swale Joint Transportation Board

All decisions
MeetingDecisionOutcome
29 Jun 2026 Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... Decided Open
29 Jun 2026 Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. Noted Open
6 Oct 2025 Highways Work Programme(1) That the report be noted. Noted Open
6 Oct 2025 Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. Noted Open
30 Jun 2025 Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies