CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Swale Borough Council
Swale Joint Transportation Board, Monday 25 June 2018 at 5.30pm

A2500 Lower Road/Barton Hill Drive, Minster

Noted Committee 4 papers

Swale Joint Transportation Board noted this item on Monday 25 June 2018. Below is the council's own wording, with the papers it was decided on.

Item81

Resolved

(1) That the report be noted.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Swale Joint Transportation Board

A2500 Lower Road / Barton Hill Drive

To: Swale Joint Transportation Board – 25 June 2018

Main Portfolio Area: Growth, Environment & Transport

By: Tim Read, Interim Director of Highways & Transportation

Classification: For Information

Ward: Sheppey Central Division: Sheppey

Summary: Update on proposals for improving the A2500 Lower Road between Cowstead Corner and Barton Hill Drive and a junction improvement at Lower Road / Barton Hill Drive - Minster

1.0Introduction

1.1Members will be aware of the scheme to improve the A2500, Lower Road and Barton Hill Drive junction, Minster from previous reports and attendance by officers at meetings of this Board - most recently 18 December 2017.

1.2This report gives a further update of the programme to deliver the A2500 Lower Road Improvement Schemes.  Phase 1 – Lower Road/Barton Hill Drive - Junction Improvement  Phase 2 – Lower Road Widening – Cowstead Corner to Barton Hill Drive

1.3The scheme for Phase 1 is a new roundabout at the junction of the A2500 Lower Road with Barton Hill Drive. Proposals are shown on the scheme plan in Appendix A

1.4The scheme for Phase 2 is to widen a 1.1km section of the A2500 Lower Road between the A249 at Cowstead Corner and Barton Hill Drive, including the construction of a new shared footway/cycleway alongside the road which will improve and provide the infrastructure for all road users, currently lacking in this location. Proposals are shown on the scheme plan in Appendix B.

1.5Approval to progress these proposals has been confirmed following the Environment & Transport Cabinet Committee meeting on the 15 May 2018.

2.0Current Situation Phase 1 2.1 The South East Local Enterprise Partnership (SELEP) funding has been confirmed and developer contributions from s106 agreements identified.

2.2Detailed design work for Phase 1 is complete and a construction contract has been awarded to Breheny Civil Engineering as the Principal Contractor to undertake the works.

2.3The roundabout has been developed to incorporate the potential for a spur road from a fourth arm to serve as access to the development site identified as Policy A12 in ‘Bearing Fruits 2031: The Swale Borough Local Plan 2017.

2.4The landowner, who also holds the land allocated under Policy A12 has made the land available for the scheme at nil cost. Access has been granted to allow construction to proceed while the formal transfer of the land is progressed by solicitors.

2.5Discussions have taken place with the KCC Streetworks Team to identify the most appropriate times to undertake these works. Details are still to be finalised, but construction will ensure minimum traffic disruption in July and August to avoid delays to holiday traffic.

2.6To facilitate the construction of the new roundabout, the contractor is proposing a temporary road closure of Barton Hill Drive for 10 weeks starting in August with traffic diverted via Thistle Hill Way see Appendix C. Temporary parking restriction are proposed along the diversion route.

2.7Further temporary road closures and/or night-time working will be required to complete the tie-ins of the new roundabout to the existing carriageway. These works will be scheduled for November/December 2018 and details will be publicised nearer the date.

Phase 2 2.8 The improvement of the Lower Road is part of the Local Plan Policy A12 and is to be provided in association with the residential development.

2.9National Productivity Investment Fund (NPIF) bid for part funding of Phase 2 was confirmed in October 2017.

2.10Match funding and the provision of the land required for the widening of Lower Road has been identified and agreed in principal with the promoters of the site of Policy A12. The match funding and land for Phase 2 will be conditional on receipt of planning consent for housing on the site of Policy A12 and this will need to be secured through a s106 agreement.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A2500 Lower Road/Barton Hill Drive, MinsterReport 76 KB DownloadRead as text
PDF
KCC A2500 Lower Rd Appendix CAppendix 1.3 MB Download
PDF
KCC A2500 Lower Road Appendix A: 0323-PH1-PE-001 Rev 0Appendix 729 KB Download
PDF
KCC Lower Road Appendix B: 0323-PH2-PE-001 Rev 0Appendix 522 KB Download

At this meeting

Whole meeting

Who was there

5 of 22 attended
MB
Councillor Mike BaldockCommittee Member, apologies
CB
Councillor Cameron BeartCommittee Member, present
AB
Alan BlackburnOfficer, in attendance
AB
Mr Andy BoothKent County Councillor, apologies
LB
Lloyd BowenVisiting Councillor, in attendance
AB
Mr Andrew BowlesChair, in attendance
MC
Martyn CassellOfficer, in attendance
DC
Councillor Derek ConwayCommittee Member, present
SG
Mrs Sue GentKent County Councillor, in attendance
AH
Mr Antony Hook - Please see Kent County Council WebsiteKent County Councillor, in attendance
JH
Councillor James HuntCommittee Member, present
KI
Councillor Ken IngletonVice-Chair, present

All 22 on the meeting page

On this subject at Swale

Search all
  1. A2500 Lower Road/Barton Hill Drive, MinsterThis decision
  2. Deferred Item 1 - 25/501882/FULL Teynham Land To The North Of Lower RoadDecided
  3. 2.1 - 23/501073/FULL Land rear of The Old Squash Courts, Lower Road, Barrow Green, TeynhamApproved
  4. Update on proposals for improving the A2500 Lower Road, Minster between Cowstead Corner and Barton Hill Drive, Minster and a junction improvement at Lower Road / Barton Hill Drive, MinsterNoted
  5. Lower Road, Isle of Sheppey, petitionNoted

More from Swale Swale Joint Transportation Board

All decisions
MeetingDecisionOutcome
29 Jun 2026 Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... Decided Open
29 Jun 2026 Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. Noted Open
6 Oct 2025 Highways Work Programme(1) That the report be noted. Noted Open
6 Oct 2025 Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. Noted Open
30 Jun 2025 Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies