Resolved
(1) That the report be noted. (2) That Members comments on the location of the crossing be fed back and any amendments made to the scheme implemented if appropriate.
Swale Joint Transportation Board noted this item on Monday 2 March 2020. Below is the council's own wording, with the papers it was decided on.
Resolved
(1) That the report be noted. (2) That Members comments on the location of the crossing be fed back and any amendments made to the scheme implemented if appropriate.
PROPOSED CARRIAGEWAY REALIGNMENT, LONDON ROAD, TEYNHAM (BETWEEN STATION ROAD AND CELLAR HILL)
To: Swale Joint Transportation Board – 02 March 2020
By: Tim Read, Head of Transportation, Kent County Council
Classification: Unrestricted
Local Electoral Division: Swale East
Summary: This report gives details of a proposed realignment scheme on the 30mph section of London Road (between Station Road and Cellar Hill) and the results of the consultation.
For Recommendation
1.0Introduction and Background
1.1In November 2019 Kent County Council published proposals to improve the local environment for residents and pedestrians and encourage better driver compliance with the existing speed limit along A2 London Road, Teynham between the junctions with Station Road and Cellar Hill. Planned residential development in the village is predicted to generate more pedestrian trips and demand to cross London Road in this area. The proposed scheme will encourage and enable people to walk around the village safely and it is therefore considered appropriate to use financial contributions from nearby development to fund this work.
1.2The speed limit change between the national and 30mph speed limit is located at the eastern gateway entrance to the village. Until recently, the conspicuity of the village for drivers on London Road approaching from the east was poor with many drivers not reacting soon enough to the change in road environment and continuing at higher speed into the village. Previous work has sought to address this by enhancing the gateway effect with kerb build-outs and carriageway lining changes. A location plan for the previous work and for this scheme is included in Appendix A of this report.
1.3Once past the Cellar Hill junction, the existing road environment does little to encourage drivers to maintain a suitable speed with a wide, straight route, no deflection, opposing directions separated by hatching and buildings set back beyond wide footways.
1.4Many of the properties on London Road do not have off-street parking and drivers frequently park on the footway throughout the day and especially overnight. There are currently no authorised parking bays on the footways on either side and it is unlikely that the footway has been strengthened to take the weight of vehicles away from authorised vehicle crossovers.
1.5The proposed scheme will:
- Reduce the width of the main carriageway and introduce minor deflection for vehicles; - Provide parking laybys providing space for the equivalent of 14 cars. As well as seeking to reduce the number of unauthorised vehicles driven and parked over the footway, bring parked vehicles closer to the traffic lanes will also have the effect of visually narrowing the road to encourage lower traffic speed; - Provide an uncontrolled crossing point in front of 41 London Road; and - Adjust the kerb line at the existing bus stop outside of The Dover Castle Public House.
1.6The drawings used in the consultation plans (Appendix B to this report) have been subject to a combined Stage 1/2 road safety audit.
2.0The Consultation
2.1A drop-in session with representatives from Teynham and Lynsted with Kingsdown Parish Councils was held on Wednesday 31st July 2019 to discuss the scheme and undertake a review of the scheme objectives.
2.2Consultation with local residents and other stakeholders took place from Tuesday, 5 November until Monday 2 December 2019. A copy of the proposed plan that was distributed to residents and stakeholders is included in Appendix B to this report.
2.3The proposals were placed on the Kent Consultation Website on 5 November 2019 and sent to statutory consultees and local residents by post. Public notices were also placed on site. The deadline for responses was 2 December 2019. Copies of the consultation material were made available at Teynham Library.
2.4Fifty-nine (59) responses were received with thirty two (32) of these being positive, twenty five (25) objecting and two (2) who neither agreed nor disagreed.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
A2 London Road, Teynham: Carriageway realignmentReport | 1.9 MB | DownloadRead as text |
Follow Swale Joint Transportation Board at Swale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... | Decided | Open |
| 29 Jun 2026 | Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Highways Work Programme(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. | Noted | Open |
| 30 Jun 2025 | Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.