Resolved
(1) That the report be noted.
Swale Joint Transportation Board noted this item on Monday 2 March 2020. Below is the council's own wording, with the papers it was decided on.
Resolved
(1) That the report be noted.
To: Swale Joint Transportation Board
By: KCC Highways, Transportation & Waste
Date: 2nd March 2020
Subject: Highway Forward Works Programme – 2019/20 onwards
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2019/20.
Kent County Council has agreed a substantial increase in the budget for planned highway works over the next three years, and as a result we are still in the process of identifying and designing schemes for inclusion in our full Year One to Two (2019/20 and 2020/21) and Year Three to Five (2021/22 to 2023/24) programmes. Because of this, we have decided to publish an interim programme, and to publish the full programmes later this year. For some assets this interim programme covers approximately the first six months of 2019/20, whilst for others it includes most of the works planned for the whole year.
This programme is subject to regular review and may change for a number of reasons including budget allocation, contract rate changes, and to reflect KCC’s changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase.
Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A
Drainage Repairs & Improvements – see Appendix B
Street Lighting – see Appendix C
Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures Externally funded schemes Local Growth Fund
Developer Funded Works – see Appendix E
Bridge Works – see Appendix F
Traffic Systems – see Appendix G
PROW – see Appendix H
Combined Member Fund – see Appendix I Conclusion
1. This report is for Members’ information.
Contact Officers:
The following contact officers can be contacted on 03000 418181
Kirstie Williams Highway Manager Mid Kent Alan Blackburn Swale District Manager Alan Casson Strategic Asset Manager Earl Bourner Drainage & Structures Asset Manager Sue Kinsella Street Light Asset Manager Toby Butler Traffic & Network Solutions Asset Manager Jamie Hare Development Agreements Manager Jamie Watson Schemes Programme Manager Appendix A – Road, Footway and Cycleway Renewal and Preservation Scheme
The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.
Machine Resurfacing – Contact Officer Byron Lovell
Current Road Name Parish Extent of Works Status Old Hook Road to To be A2500 Lower Road Minster-on-sea Rowetts Way programmed
Murston Road junction To be A2 Canterbury Road Sittingbourne programmed
50m each approach to Programmed A250 Millennium Way Sheerness High Street 9th April 2020 The Billet PH for a distance of 100m Programmed A2 London Road Sittingbourne easterly towards 14th April 2020 Sittingbourne Town Centre Millennium Way to Programmed A250 High St Sheerness junction with Victoria 15th April 2020 Street A250 Halfway Programmed A250 Halfway Road Minster Road/B2008 Minster 8th April 2020 Junction Postponed Bus layby to Church A2 High Street Newington due to gas Lane works
Footway Improvement - Contact Officer Neil Tree
Extent and Current Road Name Parish Description of Works Status Exact sections to be determined. New Road Sheerness Completed (Footway Reconstruction) Tonge Road to Great East Hall road. To be Oak Road Sittingbourne (Footway designed and Reconstruction) programmed
Exact sections to be To be Broom Road Sittingbourne determined. designed and (Footway programmed Reconstruction) Entire length Beaconsfield Road Sittingbourne (Footway Completed Reconstruction)
Exact section to be determined. Lansdown Road Sittingbourne Completed (Footway Reconstruction)
Exact section to be To be determined. Eagles Close Sittingbourne designed and (Footway programmed Reconstruction)
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Highways Work ProgrammeReport | 149 KB | DownloadRead as text |
Follow Swale Joint Transportation Board at Swale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... | Decided | Open |
| 29 Jun 2026 | Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Highways Work Programme(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. | Noted | Open |
| 30 Jun 2025 | Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.