CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Swale Borough Council
Swale Joint Transportation Board, Monday 6 September 2021 at 5.30pm

Temporary Town Centre Road Closures – Informal Consultation Questionnaire Analysis and next steps

Noted Committee 4 papers

Swale Joint Transportation Board noted this item on Monday 6 September 2021. Below is the council's own wording, with the papers it was decided on.

Item221

Resolved

(1) That the report be noted.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Swale Joint Transportation Board

Faversham Permanent Town Centre Road Closures Questionnaire Summary Report

Project number: 60656859

30 July 2021 Faversham Permanent Town Centre Road Closures Project number: 60656859

Quality information Prepared by Checked by Verified by Approved by

Kate Gambitsis Kin-Yun Lo Yumna Waggie Cassiem Jeppe Engineer Senior Engineer Senior Engineer Regional Director

Revision History Revision Revision date Details Authorized Name Position 0 16/07/2021 Draft Issue Yes Cassiem Jeppe Regional Director 1 30/07/2021 Final Issue Yes Cassiem Jeppe Regional Director

Distribution List # Hard Copies PDF Required Association / Company Name 0 Yes Swale Borough Council 1 Yes Swale Borough Council

Summary Report - Faversham.docx AECOM Faversham Permanent Town Centre Road Closures Project number: 60656859

Prepared for: Swale Borough Council

Prepared by: Kate Gambitsis Engineer E: [email removed]

AECOM Limited Sunley House 4 Bedford Park, Surrey Croydon CRO 2AP United Kingdom

T: +44 20 8639 3500 aecom.com

© 2021 AECOM Limited. All Rights Reserved. This document has been prepared by AECOM Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM.

Summary Report - Faversham.docx AECOM Faversham Permanent Town Centre Road Closures Project number: 60656859

Table of Contents

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Summary Report: Faversham: finalReport 3.1 MB DownloadRead as text
PDF
Summary Report: Sheerness: finalReport 3.2 MB Download
PDF
Summary Report: Sittingbourne: finalReport 2.3 MB Download
PDF
Temporary Town Centre Road Closures: Informal Consultation Questionnaire Analysis and next stepsReport 497 KB Download

At this meeting

Whole meeting

Who was there

15 of 34 attended
MB
Mr Mike BaldockKent County Councillor, present
CB
Mr Cameron BeartKent County Councillor, present
AB
Alan BlackburnOfficer, in attendance
MB
Monique BonneyVisiting Councillor, in attendance
AB
Mr Andy BoothKent County Councillor, apologies
MC
Martyn CassellOfficer, in attendance
SC
Simon ClarkCommittee Member, apologies
SD
Steve DaveyVisiting Councillor, in attendance
MD
Mr Mike DendorKent County Councillor, present
OE
Oliver EakinVisiting Councillor, in attendance
TG
Tim GibsonVisiting Councillor, in attendance
AG
Alastair GouldCommittee Member, present

All 34 on the meeting page

More from Swale Swale Joint Transportation Board

All decisions
MeetingDecisionOutcome
29 Jun 2026 Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... Decided Open
29 Jun 2026 Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. Noted Open
6 Oct 2025 Highways Work Programme(1) That the report be noted. Noted Open
6 Oct 2025 Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. Noted Open
30 Jun 2025 Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies