Resolved
(1) That the report be noted.
Swale Joint Transportation Board noted this item on Monday 6 September 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
(1) That the report be noted.
Faversham Permanent Town Centre Road Closures Questionnaire Summary Report
Project number: 60656859
30 July 2021 Faversham Permanent Town Centre Road Closures Project number: 60656859
Quality information Prepared by Checked by Verified by Approved by
Kate Gambitsis Kin-Yun Lo Yumna Waggie Cassiem Jeppe Engineer Senior Engineer Senior Engineer Regional Director
Revision History Revision Revision date Details Authorized Name Position 0 16/07/2021 Draft Issue Yes Cassiem Jeppe Regional Director 1 30/07/2021 Final Issue Yes Cassiem Jeppe Regional Director
Distribution List # Hard Copies PDF Required Association / Company Name 0 Yes Swale Borough Council 1 Yes Swale Borough Council
Summary Report - Faversham.docx AECOM Faversham Permanent Town Centre Road Closures Project number: 60656859
Prepared for: Swale Borough Council
Prepared by: Kate Gambitsis Engineer E: [email removed]
AECOM Limited Sunley House 4 Bedford Park, Surrey Croydon CRO 2AP United Kingdom
T: +44 20 8639 3500 aecom.com
© 2021 AECOM Limited. All Rights Reserved. This document has been prepared by AECOM Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM.
Summary Report - Faversham.docx AECOM Faversham Permanent Town Centre Road Closures Project number: 60656859
Table of Contents
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Summary Report: Faversham: finalReport | 3.1 MB | DownloadRead as text |
PDF |
Summary Report: Sheerness: finalReport | 3.2 MB | Download |
PDF |
Summary Report: Sittingbourne: finalReport | 2.3 MB | Download |
PDF |
Temporary Town Centre Road Closures: Informal Consultation Questionnaire Analysis and next stepsReport | 497 KB | Download |
Follow Swale Joint Transportation Board at Swale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... | Decided | Open |
| 29 Jun 2026 | Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Highways Work Programme(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. | Noted | Open |
| 30 Jun 2025 | Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.