CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Swale Borough Council
Swale Joint Transportation Board, Monday 6 September 2021 at 5.30pm

Update from Highways England on the M2/Junction 5 improvements

Noted Committee 2 papers

Swale Joint Transportation Board noted this item on Monday 6 September 2021. Below is the council's own wording, with the papers it was decided on.

Item222

Resolved

(1) That the presentation be noted.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Swale Joint Transportation Board

M2 Junction 5 Improvement Update https://highwaysengland.co.uk/our-work/south-east/m2-junction-5-improvements/

06/09/2021 Introduction

06/09/2021 Project Introduction – Location & The Need Location The M2 forms part of an important corridor for the southeast, connecting London and Dover.

Junction 5 provides the main access point for people travelling northeast to Sittingbourne, the Isle of Sheppey and the Port of Sheerness, and southwest to Maidstone and the surrounding area.

The Need This junction and the A249 Stockbury Roundabout cannot cope with the current and future expected volume of traffic.

It is also one of the top 50 national casualty hotspots on England’s major A roads and motorways.

The scheme improvements aim to improve journey times, reduce delays and improve safety of the junction for all road users.

The capacity upgrade will also help economic growth in the area, as it will support future housing and employment opportunities in the area. Project Introduction – What We’re Doing The Improvements • Providing a new flyover, over the top of the existing roundabout, allowing free-flowing movement on the A249

• Creating two new dedicated free flowing slip roads: • left turn from the A249 southbound to the M2 westbound towards London • left turn from the A249 northbound to the M2 eastbound towards Canterbury

• Closing the connection from the Maidstone Road to the A249 Stockbnury Roundabout

• Re-routing the Maidstone Road to link with Oad Street

• Building a new link from Oad Street that connects directly with the A249 Stockbury Roundabout and closing the existing junction of Oad Street and the A249

• Closing the Honeycrock Hill junction with the A249 for safety reasons Where We Are

06/09/2021 Current Position & Look Ahead – Stage 5 Pre-construction & Stage 6 Construction

Current Project Position

M2 J5 is currently running at Stage 5 (pre- construction) and will soon be in Stage 6 (construction), as we begin to start preparing the site from September 2021 for the main construction activities to begin at the start of 2022.

Upcoming Major Milestones

Activity Date Site September 2021 – clearance January 2022

Main January 2022 – construction Winter 2024

Open for Winter 2024 traffic 6 What We’ll Be Doing

06/09/2021 Current Position & Look Ahead – Stage 5 Pre-construction & Stage 6 Construction

How We’ll Deliver the Scheme

Our project team have developed a programme to ensure we work as efficiently and safely as possible, while minimising disruption to customers and keeping the traffic on and around the junction moving.

There will be times when we need to close roads in order to keep everyone safe while carry out work. We’ll advertise these well in advance, along with any diversion routes, through our project website and social media.

The following show approximate timescales of the key stages of our project.

8 1 Year Look Ahead

Work Activities • Site clearance • Utility diversions From September 2021 • Archaeological investigations • Site compound set up For the first phase of our work, we will be preparing the site for main construction.

This consists of clearing vegetation, creating habitats for wildlife, relocating hedgerows and woodland plants, setting up site compounds and carrying out some archaeological investigations.

There will also be some closures along the A249, so we can move utility pipes underneath the road.

More information about these, will be available on the project website.

9 1 Year Look Ahead

Work Activities • Start of main construction • Preparation work for new Oad Street link January 2022 – Winter 2022 • Site clearance • Foundation and piling work The second phase of our work will see the main construction activities start.

This includes preparing the new links with the junction for Maidstone Road and Oad Street.

We’ll be clearing the sites, excavating, prepping the ground and beginning to install drainage.

You’ll also notice the installation of foundations starting on the new bridge under the M2.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Update from Highways England on the M2/Junction 5 improvementsReport 3.8 MB DownloadRead as text
PDF
onlineReport 3.8 MB Download

At this meeting

Whole meeting

Who was there

15 of 34 attended
MB
Mr Mike BaldockKent County Councillor, present
CB
Mr Cameron BeartKent County Councillor, present
AB
Alan BlackburnOfficer, in attendance
MB
Monique BonneyVisiting Councillor, in attendance
AB
Mr Andy BoothKent County Councillor, apologies
MC
Martyn CassellOfficer, in attendance
SC
Simon ClarkCommittee Member, apologies
SD
Steve DaveyVisiting Councillor, in attendance
MD
Mr Mike DendorKent County Councillor, present
OE
Oliver EakinVisiting Councillor, in attendance
TG
Tim GibsonVisiting Councillor, in attendance
AG
Alastair GouldCommittee Member, present

All 34 on the meeting page

More from Swale Swale Joint Transportation Board

All decisions
MeetingDecisionOutcome
29 Jun 2026 Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... Decided Open
29 Jun 2026 Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. Noted Open
6 Oct 2025 Highways Work Programme(1) That the report be noted. Noted Open
6 Oct 2025 Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. Noted Open
30 Jun 2025 Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies