Key Street/Grovehurst Road Roundabouts

Noted Committee 4 papers

Swale Joint Transportation Board noted this item on Monday 27 February 2023. Below is the council's own wording, with the papers it was decided on.

Item724

Resolved

(1) That the report be noted.
Word for word from the decision Swale published for this meeting. Source: democracy.swale.gov.uk

Follow this further

Built from Swale's papers

What the report saysPro

Report to Swale Joint Transportation Board

Background

2.1One of the outcomes of the Swale Local plan adopted 2017 was the need to improve the junctions along the A249 at M2J5, Key Street and Grovehurst Road. The improvements would support the delivery of over 6,000 homes in the period 2022 – 2031 identified in the adopted Swale Local Plan, reduce existing congestion and queuing, as well as improving facilities for pedestrians and cyclists.

2.2A detailed funding bid was submitted and in November 2019, Homes England, the non-departmental public body under MHCLG announced that the bid had been successful and £38.1m of grant funding had been allocated for both junction improvements. A Grant Determination Agreement (GDA) between KCC and Homes England was signed in September 2020. A condition of the GDA is that funding was due to be spent by 31 March 2024, however due to delays in the M2 Junction 5 scheme, which was a condition in the release of the HIF funding, an extension has been granted to 30 September 2024.

2.3Approval to progress these proposals was confirmed following the KCC Environment & Transport Cabinet Committee meeting in March 2020. 2.4 The M2 Junction 5 scheme is being delivered by National Highways (formally Highways England). Following a public inquiry, the Secretary of State published a decision approving the project in June 2021. These works are currently under construction and due to be complete in 2025.

3 Current Situation

3.1Systra have been commissioned to undertake the transportation assessments and develop the detailed designs for these schemes.

Key Street

3.2The A249 Key Street junction is a two-bridge oval shaped roundabout junction with slip roads on the southern side and connections to the A249, A2 Keycol Hill, Bobbing Hill, Sheppey Way and Chestnut Street. It serves the A2, village communities, and Sittingbourne town centre.

3.3The scheme for Key Street is to improve capacity and safety on the existing Key Street gyratory and to relocate the access to the south bound slip road to the A249 along Chestnut Street. The improvements are considered permitted development, so a planning consent is not required.

3.4Due consideration has been given to the proposed access to the Wises Lane development, granted planning consent by the Secretary of State following an appeal. A new footway/cycleway is to be included along Chestnut Street and the proposals are shown on the scheme plan in Appendix A.

3.5The new roundabout on Chestnut Street is due to be provided as part of the Wises Lane development. The connection onto the A249 from the new roundabout is being delivered as part of the Key Street Improvement works.

3.6The development of the detailed proposals for the Key Street improvements had been put on hold awaiting the outcome of the developer’s application to discharge planning conditions ref 22/500782/SUB (condition 25). The application to discharge was approved on 2 February 2023, which will now allow the consultants to progress the detailed design.

3.7A further update on the detailed proposals will be provided once the programme for the delivery of the new roundabout is confirmed by the developer. Alternative arrangements will be looked at if there is a delay that prevents the Key Street improvements being delivered within the funding timetable.

Grovehurst Road

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
.pdf GROVEHURST ROADAppendix A 2.3 MB Download
PDF
.pdf GROVEHURST ROADAppendix B 3.8 MB Download
PDF
.pdf GROVEHURST ROADAppendix C 4.4 MB Download
PDF
Key Street/Grovehurst Road RoundaboutsReport 162 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

16 of 27 attended
BA
Billy AttawayOfficer, in attendance
MB
Mr Mike BaldockKent County Councillor, present, as expected, virtual
AB
Alan BlackburnOfficer, in attendance, virtual
MB
Monique BonneyVice-Chair, present
AB
Mr Andy BoothKent County Councillor, present
MD
Mr Mike DendorKent County Councillor, present
JA
John Arthur FassenfeltParish Councillor, present, as expected, virtual
TG
Tim GibsonVisiting Councillor, in attendance, virtual
AG
Alastair GouldCommittee Member, present
AH
Mr Antony Hook - Please see Kent County Council WebsiteKent County Councillor, present, as expected, virtual
EJ
Elliott JayesCommittee Member, present, as expected, virtual
RL
Mr Rich LehmannKent County Councillor, present, as expected, virtual

All 27 on the meeting page

On this subject at Swale

Search all
  1. Key Street/Grovehurst Road RoundaboutsThis decision
  2. Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction SittingbourneNoted
  3. Deferred Item 2 - 24/502378//FULL 34 Key Street, Sittingbourne, Kent, ME10 1YSDecided
  4. Deferred Item 3 - 24/502460/FULL 34 Key Street, Sittingbourne, Kent, ME10 1YSDecided
  5. Update - A249 Key Street and Grovehurst Road junction ImprovementsNoted
  6. Update on Highway Improvements Key Street and Grovehurst Road, SittingbourneNoted

More from Swale Swale Joint Transportation Board

All decisions
MeetingDecisionOutcome
29 Jun 2026 Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... Decided Open
29 Jun 2026 Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. Noted Open
6 Oct 2025 Highways Work Programme(1) That the report be noted. Noted Open
6 Oct 2025 Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. Noted Open
30 Jun 2025 Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. Noted Open