A249 Key Street and Grovehurst Road junction Improvements
To: Swale Joint Transportation Board – 20 June 2022
Main Portfolio Area: Growth, Environment & Transport
By: Tim Read, Head of Transportation
Classification: For Information
Ward: Division: Swale West and Sittingbourne North
Summary: Update on the proposed junction improvements on the A249 at Key Street and Grovehurst Road
1.0Introduction
1.1One of the outcomes of the Swale Local plan adopted 2017 was the need to improve the junctions along the A249 at M2J5, Key Street and Grovehurst Road. The improvements would support the delivery of over 6,000 homes in the period 2022 – 2031 identified in the adopted Swale Local Plan, reduce existing congestion and queuing, as well as improving facilities for pedestrians and cyclists.
1.2A detailed funding bid was submitted and in November 2019, Homes England, the non-departmental public body under MHCLG announced that the bid had been successful and £38.1m of grant funding had been allocated for both junction improvements. A Grant Determination Agreement (GDA) between KCC and Homes England was signed in September 2020. A condition of the GDA is that funding was due to be spent by 31 March 2024, however an extension has been requested following the delays in confirming the M2J5 scheme which was also a condition of release of the HIF funding.
1.3This report gives an update on the A249 Junction improvement Schemes at. Key Street Grovehurst Road
1.4Approval to progress these proposals was confirmed following the Environment & Transport Cabinet Committee meeting in March 2020
1.5The M2J5 scheme is being delivered by National Highways (formally Highways England). Following a public inquiry, the Secretary of State published a decision approving the project in June 2021. 2.0 Current Situation
1.0Systra have been employed as the consultants to undertake the transportation assessments and develop the detailed designs for these schemes.
Key Street
1.1The A249 Key Street junction is a two-bridge oval shaped roundabout junction with slip roads on the southern side and connections to the A249, A2 Keycol Hill, Bobbing Hill, Sheppey Way and Chestnut Street. It serves the A2, village communities, and Sittingbourne town centre.
1.2The scheme for Key Street is to improve capacity and safety on the existing Key Street gyratory and to relocate the access to the south bound slip road to the A249 along Chestnut Street, giving due consideration to the proposed access to Wises Lane development granted planning consent by the Secretary of State following an appeal. A new footway cycleway and controlled crossing provision is included along Chestnut Street. The proposals are shown on the scheme plan in Appendix A.
1.3The new roundabout on Chestnut Street is due to be provided as part of the Wises Lane development. Details of the proposals are required to be submitted to Swale Borough Council Planning to approve and discharge the reserved matters – 22/500782/SUB
1.4The connection onto the A249 from the new roundabout will be delivered as part of the Key Street Improvement works.
1.5These improvements are considered permitted development, so a planning consent is not required.
Grovehurst Road
1.6The A249 Grovehurst Road junction is a double roundabout layout with a single two lane carriageway bridge over the A249 connecting the two. It is the main route for traffic heading towards the Sittingbourne Northern Relief Road to the east and Iwade village to the west. The junction also has connections to Grovehurst Road and Swale Way
1.7The scheme for Grovehurst Road is to provide an additional bridge over the A249 creating a full gyratory junction. The pedestrian and cycle facilities included signal controlled crossings within the junction have been revised following comments received during the recent public consultation exercise. The proposals are shown on the scheme plan in Appendix B
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
HIF Appendix AAppendix | 3.7 MB | Download |
PDF |
HIF Appendix BAppendix | 3.8 MB | Download |
PDF |
Update: A249 Key Street and Grovehurst Road junction ImprovementsReport | 313 KB | DownloadRead as text |
PDF |
Update note: A249 Key Street and Grovehurst Road junction ImprovementsReport | 100 KB | Download |
Follow Swale Joint Transportation Board at Swale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... | Decided | Open |
| 29 Jun 2026 | Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Highways Work Programme(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. | Noted | Open |
| 30 Jun 2025 | Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.