More Homes Parc Yr Helyg Site Options Appraisal.

Noted Executive 5 papers

Cabinet noted this item on Thursday 21 June 2018. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

Resolved that: 1) The options as outlined in the report were considered and the preferred specification as the Swansea Standard (with value engineering) be confirmed; 2) The emerging longer term development programme be noted and the allocation of £500,000 for the scheme for Colliers Way Phase 2 for the enabling works be approved, the detail of which being delegated to the Director of Place, in line with the requirements of Financial Procedure Rule 7.
Word for word from the decision Swansea published for this meeting. Source: democracy.swansea.gov.uk

Follow this further

Built from Swansea's papers

What the report saysPro

Report to Cabinet

Background

1.1Following construction of the first pilot project at Colliers Way (formally Milford Way), Penderry, a report reviewing progress and any “lessons- learned” was approved by Cabinet on the 16th November 2017. It was agreed a further report would be presented to Cabinet to confirm which options should be progressed at Parc Yr Helyg, along with details of the final expected costs. The mix of new homes for the Parc Yr Helyg scheme was determined as the following:

 4 no. 2 bedroom units and 12 no. 1 bedroom units.

To ensure the scheme meets the Council’s policy of tackling fuel poverty and future generation’s obligations, it was agreed to build to a standard above building regulations as minimum standards were not deemed acceptable. As such, a comparison was to be made between the Passivhaus standard and a “fabric first” high-energy efficient property which will be referred to as a ‘Swansea Standard’. This report deals with the outcome of these comparisons, along with the recommendations for Parc Yr Helyg.

2 Improvements from Lessons Learnt

As summarised in the Cabinet report dated 16th November, the lessons learnt included:

i. Site selection ii. Timescale for delivery iii. Decision to proceed with Passivhaus house. iv. Design issue. v. Restricted supply chain procurement due to Passivhaus standard. vi. Enhanced specification choices. vii. Supplementary heating viii. Pilot scheme experience/Knowledge gained. ix. Review external works x. All costs “cost comparison” benchmark data

These were reviewed in order to try to assess the potential benefit and reduction in costs that these could make for Parc Yr Helyg and as such, the following principle changes were deemed necessary.

2.1Changes to Specification

As stated in the Lessons Learnt report, the Council had not designed new homes directly for a generation which led to the decision being made to commission architectural and Passivhaus Support. In line with CPRs, a specialist Passivhaus advisor was appointed to prepare the Passivhaus designs for both Colliers Way and Parc Yr Helyg. Although the Passivhaus support/experience offered was extensive, issues did arise in relation to insufficient construction detailing and specification which caused problems in terms of accurately pricing the works, ensuring Building Regulations were met and designs being WHQS compliant. In addition, the site layout provided did not align with topographical & GIS data once further detailed analysis had been carried out. These issues all impacted at site level, affecting both the programme and sequencing of construction works and would all still need to be considered if the option was to build again to Passivhaus Standard.

2.2Changes to Size

There were no changes made to size as the original layouts would be used for both options, with the aim being that cost comparisons could calculated on a ‘like for like’ basis in terms of size/scale.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
09 (2 of 5): App AAppendix 52 KB Download
PDF
09 (3 of 5): App BAppendix 51 KB Download
PDF
09 (4 of 5): App CAppendix 53 KB Download
PDF
09 (5 of 5): App DAppendix 114 KB Download
PDF
More Homes Parc Yr Helyg Site Options Appraisal.Report 168 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

10 of 23 attended
RS
Rob StewartChair, present
JB
June BurtonshawCommittee Member, present
MC
Mark ChildCommittee Member, present
RF
Robert Francis-DaviesCommittee Member, present
DH
David HopkinsCommittee Member, present
AL
Andrea LewisCommittee Member, present
CL
Clive LloydCommittee Member, present
JR
Jennifer RaynorCommittee Member, present
MT
Mark ThomasCommittee Member, present
CS
Chris SiversOfficer, expected
MN
Martin NichollsOfficer, expected
DH
David HowesOfficer, expected

All 23 on the meeting page

On this subject at Swansea

Search all
  1. More Homes Parc Yr Helyg Site Options Appraisal.This decision
  2. Scrutiny of Cabinet Member Portfolio Responsibilities: More Homes Delivery - Councillor Andrea Lewis, Cabinet Member for Service Transformation.Decided
  3. More Homes Delivery Programme.Noted
  4. More Homes Strategy and Decarbonisation of Existing Housing Stock.Noted
  5. More Homes Development Programme Update.Noted
  6. Pre-decision Scrutiny: More Homes Parc Yr Helyg Site Options Appraisal Report.Decided

More from Swansea Cabinet

All decisions
MeetingDecisionOutcome
16 Sep 2026 Minutes.Resolved that the Minutes of the meeting(s) listed below be approved and signed as a correct record: 1) Cabinet held ... Approved Open
16 Sep 2026 Public Space Protection Order Scheme. *Resolved that: 1) The findings of the Public Spaces Protection Order Review be approved. 2) The introduction of a new... Approved Open
16 Sep 2026 Local Authority Governor Appointments.Resolved that: 1) The following nominations recommended by the Director of Education in conjunction with the Cabinet ... Approved Open
16 Sep 2026 Revenue and Capital Budget Monitoring 1st Quarter 2026/27.Resolved that: 1) The comments and variations, including the heightened material uncertainties, set out in the report... Noted Open
16 Sep 2026 Quarter 1 2026/27 Performance Monitoring Report.Resolved that: 1) The Council’s performance in delivering its well-being objectives during Quarter 1 of 2026/27 be no... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies