CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Teignbridge District Council
Planning Committee, Tuesday 26 September 2017 at 10.00am

Planning Applications for Consideration - to consider applications for planning permission as set out below.

Approved Planning 6 papers

Planning Committee approved this item on Tuesday 26 September 2017. Below is the council's own wording, with the papers it was decided on.

Item149

Resolved

Resolved Permission be granted subject to the following conditions: 1. Standard 3 year time limit for commencement. 2. Development to be carried out in accordance with approved plans. (16 votes for, 0 against and 1 abstention) · STARCROSS - 17/01703/MAJ - Cockwood Harbour & Starcross Slipways, Cockwood - Tidal defence scheme to include flood gate installation and replacement, slipway raising and wall raising at tidal inlets, together with a combination of raising, repair and reconstruction of Cockwood Harbour seawall, and associated works The Committee noted the further information requested at the meeting on 29 August in relation to technical information and any impacts on nearby buildings arising from pile driving works alongside possible alternatives, and measures to minimise and monitor vibration levels or mitigation. It was proposed by Councillor Dennis and seconded by Councillor Bullivant that the application be approved as set out in the report circulated with the agenda. Resolved Permission be granted subject to the following conditions: 1. Standard 3 year time limit for commencement. 2. Development to proceed in accordance with the approved details. 3. Cockwood Harbour wall shall be recorded at level 3 as set out in HistoricEngland Guidance Understanding Historic Buildings: A Guide to Good Recording Practice and the results deposited with the Devon Historic Environment Record (HER). 4. Archaeological written scheme of investigation to be submitted to and approved by the Local Planning Authority and implemented as agreed. 5. Photographic survey of Cockwood Harbour wall and Starcross Slipways shall be completed and shall inform and form part of a method statement for the proposed works to be submitted and approved by the Local Planning Authority. Method statement shall determine the extent of capping and stone to be salvaged and reused, how capping and salvaged stone will be stored, and re-used. 6. Details of a sustainable Urban Drainage System for the full period of construction shall be submitted to and approved by the Local Planning Authority 7. Notwithstanding the approved plans, submission of details/materials of the following items shall be submitted for each individual section of the scheme as relevant: a) Wall capping details. b) Steps. c) Handrails (type, colour, material and method of fixing). d) Flood defence gates (design, materials and levels of fixings). e) Surface treatments to slipways and walkways, and pavements (including between Rock Cottage and Cockwood Harbour). f) Balustrade (type, colour, material and method of fixing). ... view the full minutes text for item 149.
Word for word from the decision Teignbridge published for this meeting. Source: democracy.teignbridge.gov.uk

Follow this further

Built from Teignbridge's papers

What the report saysPro

Report to Planning Committee

PLANNING COMMITTEE CHAIRMAN: Cllr Dennis Smith

DATE: 26 September 2017

REPORT OF: Business Manager – Strategic Place

ITEM: 2.

CASE OFFICER Donna Crabtree

APPLICATION FOR STARCROSS - 17/01703/MAJ - Cockwood Harbour & CONSIDERATION: Starcross Slipways, Cockwood - Tidal defence scheme to include flood gate installation and replacement, slipway raising and wall raising at tidal inlets, together with a combination of raising, repair and reconstruction of Cockwood Harbour seawall, and associated works

APPLICANT: Environment Agency

WARD MEMBERS: Councillor Connett, Kenton-with-Starcross

1. REASON FOR REPORT

This application is reported to Planning Committee as the site includes land which is owned by Teignbridge District Council

UPDATE TO PREVIOUS REPORT TO 29 AUGUST PLANNING COMMITTEE

This report is returned for the consideration of Members following deferral of the application at the Committee Meeting which took place on 29 August 2017. The application was deferred to allow further Officer consideration of technical information and any impacts on nearby buildings arising from pile driving works alongside possible alternatives, and measures to minimise and monitor vibration levels or mitigation.

Following the August Committee Meeting, the Applicant (Environment Agency) has submitted additional information for consideration comprising a Technical Note which sets out how vibrations will be monitored and what mitigation measures will be implemented.

The Technical Note explains that equipment will be used to measure vibration levels (Peak Particle Velocity) over baseline levels. Action levels are identified (initial trigger of 1.5mm/s and action level of 3.0mm/s) which would confirm if any obstruction is reached during the piling works. Piling works would be achieved by pre-augering key positions. During these works, should the initial trigger of 1.5mm/s be reached, the contractor would stop works and retract the auger and move to the next auger position. If no further obstruction is reached, the auger would be repeated in the previous position as it is a likely isolated area which could be cleared with minimal vibration. If further obstruction is encountered, consideration will be given to adapting the design to provide a shorter pile at these locations.

If the action level of 3mm/s is reached, operations would be stopped immediately and records of obstructions checked. If the obstruction is isolated it would be passed with minimal vibration, if it is not, dependent on depth, the design would be amended to leave the sheet pile shorter.

If action levels area reached then the option of pre-drilling (auger mounted within a casing to prevent uncontrolled movement when hitting hard material) would be carried out, rather than pre-auger.

The Technical Note also confirms that structural assessments will be undertaken of the listed properties directly adjacent to the site (in exceedance of normal practice only to assess properties where there is obvious visible signs that there is already an underlying issue and potential failure of the structure).

The Teignbridge District Council Coastal and Drainage Manager has reviewed the Technical Note and accompanying documents and is satisfied that mitigation measures have been properly considered and included, and that any objections relating to structural damage have been properly addressed.

Having due regard to Sections 66 and 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990, subject to a condition requiring compliance with the Technical Note methodology, it is not considered that the proposed development would impact the structural stability of nearby listed buildings and other structures.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
2.17.01703: Starcross and CockwoodReport 1.5 MB DownloadRead as text
PDF
3.15.00708: South West ExeterReport 857 KB Download
PDF
4.16.03251: West Exe ParkReport 581 KB Download
PDF
5.16.01961: Land to the Rear of Mount Pleasant RoadReport 363 KB Download
PDF
6.16.02074: 1 Prior Park Road DawlishReport 577 KB Download
PDF
Planning Applications for Consideration: to consider applications for planning permission as set out below.Report 383 KB Download

At this meeting

Whole meeting

On this subject at Teignbridge

Search all
  1. Planning Applications for Consideration - to consider applications for planning permission as set out below.This decision
  2. Recommendation from Procedures - Notice of Motion on variations of conditions on major planning applicationsApproved
  3. Vacant Building Credit - The Council’s Approach in Considering Planning ApplicationsApproved

More from Teignbridge Planning Committee

All decisions
MeetingDecisionOutcome
22 Sep 2026 MinutesThe of the meeting held on 21 July 2026 were approved as a correct record and signed by the Chair. Approved Open
22 Sep 2026 ASHBURTON - 25/01752/FUL - Land at GoodstoneRESOLVED Planning permission be approved subject to the following conditions: 1. The development hereby permitted sha... Approved Open
22 Sep 2026 BICKINGTON - 26/00876/MAJ - Land at Chipley MillRESOLVED a) The application be referred to the Secretary of State in accordance with the Town and Country Planning (C... Approved Open
21 Jul 2026 Kerswell-with-Combe - 25/01844/MAJ - Land at East of Buckland Road25/01844/MAJ - Land to the East of Buckland Road Newton Abbot Outline application for up to 50 dwellings, public open... Approved Open
12 May 2026 Woodland - 26/00353/HOU - Sunset Cottage House CrossRESOLVED Planning Permission be granted subject to the following conditions: 1. The development hereby permitted shal... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies