Resolved
Resolved Permission be granted subject to the following conditions: 1. Standard 3 year time limit for commencement. 2. Development to be carried out in accordance with approved plans. (16 votes for, 0 against and 1 abstention) · STARCROSS - 17/01703/MAJ - Cockwood Harbour & Starcross Slipways, Cockwood - Tidal defence scheme to include flood gate installation and replacement, slipway raising and wall raising at tidal inlets, together with a combination of raising, repair and reconstruction of Cockwood Harbour seawall, and associated works The Committee noted the further information requested at the meeting on 29 August in relation to technical information and any impacts on nearby buildings arising from pile driving works alongside possible alternatives, and measures to minimise and monitor vibration levels or mitigation. It was proposed by Councillor Dennis and seconded by Councillor Bullivant that the application be approved as set out in the report circulated with the agenda. Resolved Permission be granted subject to the following conditions: 1. Standard 3 year time limit for commencement. 2. Development to proceed in accordance with the approved details. 3. Cockwood Harbour wall shall be recorded at level 3 as set out in HistoricEngland Guidance Understanding Historic Buildings: A Guide to Good Recording Practice and the results deposited with the Devon Historic Environment Record (HER). 4. Archaeological written scheme of investigation to be submitted to and approved by the Local Planning Authority and implemented as agreed. 5. Photographic survey of Cockwood Harbour wall and Starcross Slipways shall be completed and shall inform and form part of a method statement for the proposed works to be submitted and approved by the Local Planning Authority. Method statement shall determine the extent of capping and stone to be salvaged and reused, how capping and salvaged stone will be stored, and re-used. 6. Details of a sustainable Urban Drainage System for the full period of construction shall be submitted to and approved by the Local Planning Authority 7. Notwithstanding the approved plans, submission of details/materials of the following items shall be submitted for each individual section of the scheme as relevant: a) Wall capping details. b) Steps. c) Handrails (type, colour, material and method of fixing). d) Flood defence gates (design, materials and levels of fixings). e) Surface treatments to slipways and walkways, and pavements (including between Rock Cottage and Cockwood Harbour). f) Balustrade (type, colour, material and method of fixing). ... view the full minutes text for item 149.