Resolved
RESOLVED Planning permission be approved subject to the following conditions: 1. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: Date Received Drawing/reference number Description 24 Oct 2025 TM58C.A1 Location Plan (1:12500) 24 Oct 2025 TM58C.P2 Proposed Floor Plan, Elevations & Roof Plan of SW Building 27 Apr 2026 TM58c.P1b+BNG2a V4 Appendix 1 Layout Plan within the BRE 365 Soak-Away Test report (numbered S26-29/365) REASON: In order to ensure compliance with the approved drawings. 2. Construction work shall only commence at least 30 minutes after sunrise and cease at least 30 minutes before sunset each day during the active season of bats (i.e., from April to October inclusive). No lighting shall be left on over-night during the construction phase. REASON: To protect light-averse bats during the construction period, in light of the site's location within the Landscape Connectivity Zone of the South Hams SAC. 3. No later than three months following approval of this application, the detailed design and maintenance arrangements of the proposed permanent surface water drainage management system shall be submitted to the Local Planning Authority for approval in writing. The design of this permanent surface water drainage management system shall comply with the site layout drawing ref. TM58c.P1b+BNG2a V4. Once approved, the surface water drainage management system shall be installed prior to first use of the hereby permitted new building and thereafter maintained in accordance with the approved arrangements. REASON: To ensure that surface water runoff from the development is managed in accordance with the principles of sustainable drainage systems, to prevent an increase in flood risk elsewhere, in accordance with Policy EN6 of the adopted Teignbridge Local Plan 2040 and Policies F7 and F8 of the National Planning Policy Framework 2026. 4. Three integrated swift nesting boxes shall be incorporated into the fabric of the building on its north western elevation, immediately under the eaves of the roof. The swift nesting boxes shall be installed prior to first use of the building and thereafter retained and maintained. REASON: To meet the requirement at Policy N2 of the NPPF 2026 for the incorporation of integrated nesting boxes. 5. Prior to first use of the hereby permitted new building, the foul water drainage septic tank and drainage field shall have been installed, made available for use and once installed shall be thereafter maintained. REASON: To prevent wastewater pollution arising from the development in accordance with Policy EN6 of the adopted Teignbridge Local Plan 2040 and P3 of the National Planning Policy Framework 2026. 6. The building hereby approved shall be used for agricultural purposes only and for no other use, including as a café, shop, for workshops or for educational purposes. REASON: To prevent uses which do not require a countryside location and have not otherwise been shown to require this location, in accordance with Policies GP3 and CC4 of the adopted Teignbridge Local Plan 2040 and S5 of the National Planning Policy Framework 2026. 7. No later than 3 months following first ...