Item2b
Resolved
Resolved That permission be granted subject to the following conditions: 1. 3-year time limit condition 2. Compliance with the approved plans/documents Pre-commencement: 3. Prior to commencement of development details of fuel tanks and decommissioning methodology to remediate the land be submitted to and approved in writing by the Local Planning Authority. (Agreed 12 December 2023) 4. Prior to the commencement of development, a Construction Environmental Management Plan (CEMP) will have been submitted to and approved in writing by the Local Planning Authority. (Agreed 12 December 2023) 5. The development shall proceed in accordance with the submitted Surface Water Drainage Assessment produced by Dennis Gedge Consulting Engineer, dated October 2023. During Construction 6. If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the developer has submitted, and obtained written approval from the Local Planning Authority for an investigation and risk assessment and, where necessary, a remediation strategy and verification plan detailing how this unsuspected contamination shall be dealt with. Before works above DPM: 7. No development shall take place above damp proof course level until samples of the materials to be used in all external surfaces of the building have first been submitted to and approved in writing by the Local Planning Authority. 8. No development shall take place above damp proof course level until such time as a detailed external lighting scheme for the development (including lighting to the store and within the car park and servicing areas), together with a timetable for its provision, has first been submitted to and approved in writing by the Local Planning Authority. Prior to first use: 9. Any plant (including ventilation, refrigeration and air conditioning units) or ducting system permission shall be so installed prior to the first use of the premises and be so retained and operated that the noise generated at the boundary of the nearest neighbouring property shall not exceed 5db below the background noise level at the time of operation. Details of the scheme to demonstrate the above shall accord with the noise survey method British Standard: BS 4142:2014 and shall be submitted to and approved in writing by, the Local Planning Authority prior to the commencement of development. (Agreed 12 December 2023) 10. Deliveries shall take place only between the hours of 8.00 am and 7.00 pm, other than those solely delivering newspapers 11. The ... view the full minutes text for item 2b
Word for word from the decision Teignbridge published for this meeting.
Source: democracy.teignbridge.gov.uk