RESOLVED that the recommendation at Paragraph 5.1 of the report be adopted: “That the scheme shown on drawings 10-ITS-TH-02-003 to 006, Annex 1 to the report, is approved for consultation, and, if no objections are received, approved for construction”. Tribute was paid to KCC H&T on the marked improvements brought about by the first phases of the Westwood Transport Plan.
Word for word from the decision Thanet published for this meeting.Source: democracy.thanet.gov.uk
1.1Members may recall that an overall Westwood Transport Plan was approved by this Board on 30 September 2010. The plan sets out proposed highway improvements to address the increasing level of traffic that is attracted to Westwood and reflects the success of the Westwood Cross shopping area.
1.2The first phases of the Westwood Transport Plan were completed in September 2011 and provide two lanes in each direction on A254 Margate Road between the Westwood roundabout and the superstores roundabout..
2.0Proposal
2.2The next phase of the transport plan is the widening of Westwood Road on the approach to Westwood roundabout and includes: • Two westbound lanes between Tesco’s roundabout and Westwood roundabout, • Modifications to the mini roundabout to provide left slips into and out of Tesco store, • Improved right turn lane into Poorhole Lane, • Shared footway / cycle way on the southern side of Westwood Road • Improvements to footway / cycleway on the northern side between Poorhole Lane and Westwood roundabout • The relocation and upgrade of existing pelican crossing to a toucan crossing. • Improved pedestrian refuges and islands
2.3These proposals are shown on drawing numbers 10-ITS-TH-02-003 to 006 in Appendix 1.
3.0Financial
3.1The scheme is estimated at £420,000 and will be funded from developer contributions. Construction is expected to be programmed for mid 2012.
4.0Conclusion 4.1 The scheme provides improvements in highway capacity, traffic flow, and pedestrian and cycle facilities and delivers a further element of the Westwood transport plan. 5.0 Recommendation
5.1It is therefore recommended that the scheme shown on drawings 10-ITS-TH-02-003 to 006 in Appendix 1 are approved for consultation, and that if no objections are received the scheme is approved for construction.
Future Meeting if applicable: March 2012 JTB if Date: 20/10/2011 objections are received at consultation stage.
Contact Officer: Kelly Garrett, Traffic Engineer 08458 247800 Reporting to: Andy Corcoran, Traffic Schemes and Member Highway Fund Manager
Annex List
Annex 1 Drawing numbers 10-ITS-TH-02-003 to 006
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Highways Forward Works ProgrammeIt was agreed that officers would investigate this report. · A request was made to ensure contractors collect warning...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.