Resolved
That the Planning, Transport, Regeneration Overview and Scrutiny Committee noted the progress on the A13 Widening Scheme.
Planning, Transport, Regeneration Overview and Scrutiny Committee noted this item on Tuesday 8 January 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
That the Planning, Transport, Regeneration Overview and Scrutiny Committee noted the progress on the A13 Widening Scheme.
This is to update Members about progress in delivering the A13 Widening scheme.
There will be a short presentation of the scheme provided by our contractors, Kier at the meeting.
1. Recommendation(s)
1.1That the Planning Transport Regeneration Overview and Scrutiny Committee notes the progress on the A13 Widening scheme
2. Introduction and Background
2.1This project will widen the A13 Stanford le Hope By-pass from 2 to 3 lanes in both directions, from the junction with the A128 (Orsett Cock roundabout) in the west and the A1014 (The Manorway) to the east. On completion of this scheme, the A13 will be three lanes wide in both directions all the way from the M25 motorway to Stanford le Hope.
2.2Since the last Committee update in March 2017, good progress has been made towards the delivery of the project as follows:
2.3In April 2017, the Department for Transport announced funding of £66.057m for the A13 Widening Project against a total project cost of £78.866m. The balance of the funding is provided by the South East Local Enterprise Partnership (SELEP) and DP World London Gateway Port Limited. 2.4 In June 2017, DP World London Gateway Port Limited compulsorily acquired most of the land needed for the scheme, using its powers under the London Gateway Port Harbour Empowerment Order 2008. Ownership of that land subsequently transferred to Thurrock Council. Additional land has been acquired by negotiation.
2.5The contract for detailed design was awarded to Atkins and commenced in June 2017.
2.6The contract for the widening works was awarded to Kier and commenced in July 2017.
2.7Preparatory work started in December 2017 and will continue throughout winter 2018. It includes vegetation clearance, boundary fencing, surveys, the construction of site offices and haul roads, wildlife protection, archaeology, diverting underground pipes and cables, drainage work and the construction of a new balancing pond. This work is mainly taking place away from the road, with minimal impact on road users.
2.8The main construction works on the road are due to start in March 2019 and be completed by autumn 2020. During the daytime there will be two narrow lanes in both directions with speed restrictions, camera enforcement and free vehicle recovery service. Overnight, there will be some lane closures on the A13 in both directions and slip road closures at the Orsett and Stanford le Hope junctions with diversions in place.
2.9Where possible, public bridges will be constructed and brought into operation before the existing bridges are demolished. On up to 12 occasions, it will be necessary to fully close the A13 in both directions, so that complex bridge demolition and lifting work can take place safely. These closures will be advertised well in advance and take place at weekends (from 10 p.m. Friday until 5 a.m. Monday) to reduce disruption to road users. Carefully planned diversions will be used to minimise the effect on local roads.
2.10Pre-commencement planning conditions have been discharged. Several design packages have undergone checking and the associated drawings have been released for construction e.g. drainage.
2.11The project is progressing well and is within the agreed programme and budget envelope set.
3. Issues, Options and Analysis of Options
3.1N/A
4.1To comply with the reporting arrangements agreed by Cabinet and ensure democratic scrutiny of the A13 Widening scheme. 5. Consultation (including Overview and Scrutiny, if applicable)
5.1A communication plan has been prepared and agreed.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
A13 Widening: Scheme UpdateReport | 70 KB | DownloadRead as text |
PDF |
A13 Widening PresentationReport | 6 MB | Download |
Follow Planning, Transport, Regeneration Overview and Scrutiny Committee at Thurrock and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 21 Feb 2024 | ITB Capital Programme 2024/251.1 That the Committee provide comments on the 2024/25 Integrated Transport Block capital programme allocations and p... | Agreed | Open |
| 21 Feb 2024 | Tilbury and Grays Towns Fund Update - to follow1.1 That the Committee notes the proposed changes to the original programmes and the progress on delivering the Tilbu... | Decided | Open |
| 21 Feb 2024 | Regeneration Projects Update - to follow1.1 That the committee notes the proposed changes to the original programmes and the progress on delivering the Regen... | Decided | Open |
| 17 Oct 2023 | Thurrock Scheduled Ancient Monuments: Assessment of Settings - April 2023That the Planning, Transportation and Regeneration Overview and Scrutiny Committee note and provide comment on the Th... | Decided | Open |
| 17 Oct 2023 | East Tilbury (Bata Village) & Corringham Conservation Areas Character Appraisal and Management Plans - April 2023That the Planning, Transport and Regeneration Overview and Scrutiny Committee notes and comments on the East Tilbury ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.