That Cabinet : 1. Considered the options available; Cleaner, Greener & Safer Overview and Safer Overview and Scrutiny Committee recommend Option 1 as outlined the report (sections 3.51. and 3.5.2 for consideration. 2. Considered Option 3 (section 3.5.4) as recommended by Cleaner, Greener & Safer Overview and Scrutiny Committee for the next financial year (2019/20)
Word for word from the decision Thurrock published for this meeting.Source: democracy.thurrock.gov.uk
This report outlines options for Cabinet consideration in response to a Motion which was raised at Full Council on 25 July 2018. The motion is as follows:
Motion 3 - Submitted by Councillor Redsell This chamber recognises the valuable contribution that trees make to our local environment and calls on Cabinet and / or officers: Where practicable to consult Members prior to the removal of trees from local authority land within their respective wards, and Where possible in accordance with the current budget to replace within a reasonable period all trees felled from local authority land including public areas; and To investigate availability of funding sources for the 2019 -20 budget to enable the Council to purchase replacement trees.
1. Recommendation(s)
1.1That Cabinet consider the options available; Cleaner Greener & Safer Overview and Scrutiny Committee recommend Option 1 as outlined in this report (sections 3.5.1 and 3.5.2) for consideration. 1.2 That Cabinet consider option 3 (section 3.5.4) as recommended by Cleaner, Greener & Safer Overview and Scrutiny Committee for the next financial year (19/20).
2. Introduction and Background
2.1The felling of trees in the borough is only used as a last resort. It is necessary however to remove trees for a variety of reasons. A full assessment of the tree is undertaken to establish the condition of the tree and the likelihood of its survival. The main concern when conducting this assessment is, does the tree pose a Health and Safety risk? Severe damage or severe decay to the tree can mean that the tree requires removal.
2.2During 2016/17, 26 trees were removed, in 2017/18, 25 trees were removed and so far this calendar year 15 trees have been removed. The average number of trees removed over this three year period is therefore 22 trees per annum. There are many factors that could potentially increase this number in the future, for example: -
Instances of disease are increasing in frequency throughout the UK Severe weather conditions can cause damage to trees at certain times Instances when trees are damaged in road traffic incidents and from acts of vandalism.
2.3Over the past 3 – 4 years, when trees have required removing, no additional trees have been planted to replace them. There is currently no revenue budget provision to do so.
3. Issues, Options and Analysis of Options
3.1The motion at Full Council recommended that the Council, where practical, to consult Members prior to the removal of trees from local authority land within their respective wards. What is proposed is that when there are plans for a tree to be removed, an email containing the location and the reason why the tree requires removal, be sent to all of the local ward members, notifying them of the tree removal. There will be instances when a tree has to be removed urgently, when this occurs an email will be sent to the local ward members retrospectively.
3.2Where possible the proposal is for a tree to be planted in the same position that the previous tree was removed from. However, this may not always be possible for example when a tree is cut down and the stump and roots cannot be dug up, a machine called a stump grinder has to be used to cut away the stump to below ground level. The lower part of the stump and root system remain below the ground and overtime die and rot. A new tree cannot therefore be planted in the same position. In these instances trees will be planted at the most suitable site as close to the previous trees location as possible. 3.3 Tree Species and Planting
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Thurrock Transport Strategy Adoption2.1 Cabinet approved the Thurrock Transport Strategy given in Appendix 1 to be progressed to Full Council for adoptio...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.