Communities and Housing Advisory Board noted this item on Tuesday 12 November 2019. Below is the council's own wording, with the papers it was decided on.
Decision Notice D190083MEM The report of the Director of Street Scene, Leisure and Technical Services provided an update on progress with key projects included in the Capital Plan and brought forward a number of post implementation reviews which were in many cases supported by external funding. RECOMMENDED: That (1) the updates on the current schemes within the Capital Plan, as shown at Annex 1 to the report, be noted; and (2) the Post Implementation Reviews shown at Annexes 2 to 4 to the report be approved.
Word for word from the decision Tonbridge and Malling published for this meeting.Source: democracy.tmbc.gov.uk
Report of the Director of Street Scene, Leisure & Technical Services Part 1- Public
Matters for Recommendation to Cabinet - Non-Key Decision (Decision may be taken by the Cabinet Member)
1 CAPITAL PLAN PROJECTS
Summary This report updates Members of progress with key projects included in the Council’s Capital Plan and brings forward a number of Post Implementation Reviews supported in many cases by external funding. Projects costs are already included within List A of the Capital Plan.
1.1Introduction
1.1.1 It is important that progress on the Council’s Capital Plan programme is kept under regular review and a number of key projects have been updated below. In addition, a full update reflecting all current List A schemes relevant to this Board is attached at Annex 1 for information.
1.2Haysden Country Park – Sewage Treatment Facility
1.2.1 The current sewage treatment plant that serves the toilets at the Country Park was installed in 2008 and, at the time, adequately served the needs of the Park. Recent investments in the site, including improved catering, an extended play area and other landscape works has resulted in a notable increase in the Park’s popularity and it is apparent that the current sewage system is struggling to cope.
1.2.2 As a result of increased use, public complaints have been raised regarding undesirable smells, periodic closures of the toilets have been required and there are concerns over the future ability to comply with legal discharge requirements.
1.2.3 A Capital Plan Evaluation for the replacement of the sewage system was taken to and approved by Members of the Finance, Innovation and Property Advisory Board on the 3 January 2018. Budget allocation within the Capital Plan is £75,000 and the scheme is to be fully funded through external funding.
1.2.4 Quotations for the works are currently being sought and are due for return on 20th November. Subject to the outcome of the quotations the works are due to be completed by the end of February 2020. Environment Agency consent has been received.
Communities&HousingAB-NKD-Part 1 Public 12 November 2019 2
1.2.5 In the interim a number of water saving measures and remedial works have already taken place on the existing sewage system. These works have reduced water consumption by approximately one third and improved the smell issue.
1.3Leybourne Lakes Country Park – Development Opportunities
1.3.1 Members will be aware that the Council is investigating the potential outsourcing of the management of Leybourne Lakes Country Park. As previously reported to Members of this Board it was the intention to go out to tender prior to July 2019, but a delay has been experienced due to pressure on staff resources and the complexity of the Tender documents that need to be prepared.
1.3.2 It is proposed to recommence the preparation of tender documents in spring/summer 2020, when hopefully workload pressures will have reduced, and consideration is currently being given to the commission of an external consultant to assist.
1.4Tonbridge Racecourse Swimming Pool Bridge
1.4.1 The new bridge was installed earlier this month and will open in late November following accommodation works including ramps, railings and bollards. The area around the bridge will also be tidied up following completion of the works.
1.5Tonbridge Racecourse Sportsground Revetment
1.5.1 The scheme aims to replace sections of existing wooden revetment which are now failing, resulting in bank erosion. The section due to be replaced is located at the entrance to the sportsground and runs from Tonbridge Canoe Club to the first bridge that connects to Tonbridge Swimming Pool (the bridge currently closed for replacement – see 1.4 above). The project is estimated at £225,000 and is in part funded by a grant from the Environment Agency.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Communities and Housing Advisory Board at Tonbridge and Malling and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.