That (1) the content of the report be noted; and (2) delegated authority be granted to the Director of Planning, Housing and Environmental Health and the Director of Central Services, in consultation with the Leader and the Cabinet Member for Strategic Planning and Infrastructure to finalise and approve the Environmental Statement prior to public consultation in the interest of satisfying Environmental Impact Assessment requirements, and to approve any necessary minor amendments to the draft LDO prior to the public consultation for the purposes of presentation and clarity.
Word for word from the decision Tonbridge and Malling published for this meeting.Source: democracy.tmbc.gov.uk
1.1.1 In April 2017, the ‘North Kent Enterprise Zone’ was established - a multi-site Enterprise Zone comprising sites in three locations – Kent Medical Campus (Maidstone), Ebbsfleet Garden City and Rochester Airfield, also known as Innovation Park Medway (IPM). 1.1.2 Businesses that locate on an Enterprise Zone can access a number of time-limited benefits, including up to 100% business rate discount worth up to £275,000 per business over a 5-year period and a simplified local authority planning, for example, through Local Development Orders (LDO) that grant automatic planning permission for certain development (such as new industrial buildings or changing how existing buildings are used) within specified areas 1.1.3 The IPM site is a key priority for Medway Council, who are leading the project, and own the majority of the site. However, approximately 3.75 hectares of the site fall within Tonbridge & Malling Borough (see Appendix A), in both Burham and Wouldham ward and North Aylesford and Walderslade ward. 1.1.4 In March 2019, Cabinet adopted the Innovation Park Medway (IPM) masterplan for economic development and marketing purposes, subject to addressing comments by Highways England. The masterplan outlines a scheme that will deliver a high quality innovation park, with flexible plots to encourage a wide range of high-value technology, engineering, manufacturing and knowledge-intensive businesses. 1.1.5 Medway Council’s preferred option for taking forward development of the site has been the adoption of the masterplan as a Supplementary Planning Document along
EconRegenAB-NKD-Part 1 Public 14 October 2020 2
with a Local Development Order covering the entirety of the site. The main reason for this is that it allows plots to come forward with speed and ease for developers and/or businesses. In achieving full LDO coverage for the IPM site, two separate but identical LDOs will need to be adopted – one by Medway Council and one by the Borough Council.
1.1.6 As Project Lead, Medway Council are very keen to ensure that the IPM site is brought forward soon in order to realise the benefits of the North Kent Enterprise Zone. The five-year window for providing incentives for businesses looking to locate onto the site runs until the end of March 2022. The LDO allows future occupants and developers to submit proposals through a self-certification form, verifying their proposals against the criteria set out in the LDO and Design Codes. The process will be limited to 28 days from validation to help provide a swift response and allow development to come forward in a short timeframe.
1.2The Need to Re-consult
1.2.1 A public consultation exercise on the LDO and associated documents was undertaken in 2019, which received comments from public and statutory consultees. Liaison has since been ongoing with statutory consultees to ensure their concerns are addressed prior to adoption of the LDO. This has resulted in changes to the LDO, Environmental Statement and supporting documentation. Ongoing liaison with Highways England and Natural England in particular, has led to changes to the Design Code and transport assessment work.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Budgetary Control 2026/27 to July 2026RESOLVED : That (1) the net favourable variance of circa £66,093 as at the end of July 2026, when compared to the pro...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.