Agreed Executive 2 papers

Cabinet agreed this item on Thursday 20 June 2013. Below is the council's own wording, with the papers it was decided on.

ItemCAB29/13

Resolved

RESOLVED 1. That a capital sum of £105,000 is agreed to replace the existing stage fly bars and install six static chain hoists, and approval of the virement of this sum from the capital and revenue initiative reserves; and 2. That Cabinet receive a further report setting out a programme of ongoing capital investment required in the Assembly Hall Theatre. REASON FOR DECISIONS: To ensure that the Assembly Hall Theatre can continue to safely accommodate touring West End productions
Word for word from the decision Tunbridge Wells published for this meeting. Source: democracy.tunbridgewells.gov.uk

Follow this further

Built from Tunbridge Wells's papers

What the report saysPro

Report to Cabinet

Summary

This report requests a capital allocation to address an issue with the stage flying system in the Assembly Hall Theatre, requiring new chain hoists and replacement of the existing steel bars with lighter and more resilient aluminium ladder bars

LINK TO STRATEGIC COMPASS

All

Report status

This report is for decision by Cabinet

Route to Implementation/Timetable: Appointment of a contractor and implementation during the theatre summer break 2013

I confirm that I have read the report and approve it for publication

Signed: Councillor Jane March Dated: 6 June 2013 BACKGROUND/INTRODUCTION

1. The Assembly Hall Theatre makes a significant contribution to the night-time economy of Tunbridge Wells. It has been recognised as a valuable community asset in the draft Cultural Strategy, and identified as requiring updating. It is the largest theatre in the High Weald with a capacity of 1,060 and, at 74 years old, is one of the oldest regional theatres in the area. 2. The theatre was last refurbished in 2001 - with works including the provision of additional dressing rooms, remodelling the bar and repainting of the foyer/front of house areas. In recognition that further works are now required a capital allocation of £54,000 has already been set aside to replace some of the existing seating, which is beginning to fail. To continue to provide a high quality customer experience and accommodate major West End productions, investment will be needed in the next 3 to 5 years. 3. The start of this process is the upgrading of the theatre’s flying system, which is becoming increasingly urgent. This report sets out the issues and the options for addressing concerns over bar capacity and operating within safe working loads. 4. Works would ideally be undertaken in August, when the theatre is usually closed for the summer break.

The stage flying system

5. A theatre's flying system is a vital way of effecting quick scene changes, as the fly tower can store large pieces of set which can be lowered onto the stage very quickly. Traditional flying systems use a series of steel or aluminium bars with lines attached to pulleys and counterweights. This enables stage crew to safely fly (lift) heavy curtains, lights, scenery and stage effects quickly and quietly. 6. The Assembly Hall Theatre has 27 fly bars, each with a safe working load of 300kg and four steel wire lines. The theatre has a ‘double purchase system’, which means that hanging 300kg of scenery on a bar needs 600kg of counterweight.

What is the issue?

7. Over the past ten years there has been a significant increase in the size of productions that are now staged at the theatre. The recent production of Priscilla, in particular, presented a significant challenge. Most of the major West End shows which have recently showed at the Assembly Hall - such as Blood Brothers, Joseph, Chicago and Jekyll & Hyde - have bigger and heavier sets than in previous years. This, coupled with an increase in the number of intelligent moving lights on touring shows, has pushed the theatre’s current system to its limits.

8. On average, the weight on bars for many recent large shows has nearly doubled to 360kg. An example of this is Priscilla, where the lighting bars were all 400kg each. The safe working load on these bars is 300kg, and overloading can cause bars to bend and become unsafe.

9. To avoid bars exceeding their safe working load, the theatre always links two bars together to share the load. Whilst not best practice, linking bars can be used as a temporary way of overcoming this issue. When bars are linked, however, it reduces the theatre’s ability to lift other items of set because every double bar counts as two bars – which halves the overall capacity.

Options to address overloading the fly bars

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Assembly Hall Theatre Flying System Appendix A /13Appendix 54 KB Download
PDF
Fly Bars: Assembly Hall TheatreReport 84 KB DownloadRead as text

More from Tunbridge Wells Cabinet

All decisions
MeetingDecisionOutcome
24 Sep 2026 Treasury and Prudential Indicator Management Report Quarter 1RESOLVED – 1. That the Treasury Management and Prudential Indicator position for 2026/27 be noted. 2. That the foreca... Noted Open
24 Sep 2026 Capital Management Report Quarter 1RESOLVED – 1. That the actual gross expenditure and that net of revenue for the year and the sources of finance, as s... Noted Open
24 Sep 2026 Revenue Management Report Quarter 1RESOLVED – 1. That the Quarter 1 net expenditure on services to the end of June 2026 was £5,414,000, £102,000 less th... Noted Open
24 Sep 2026 New Updated Planning Validation Checklist (Post Public Consultation)RESOLVED – 1. That the Draft Tunbridge Wells Local Validation List be adopted and used in the validation and processi... Approved Open
24 Sep 2026 Update on the Full Council Motion regarding the Maintenance of The Pantiles ColonnadeRESOLVED – 1. That the report covering the updates on the Full Council motion (FC103/25) on the Pantiles be noted. 2.... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies