A/26/100333/FULL - Erection of a coffee shop drive-thru unit (Sui Generis) with associated landscaping, supporting infrastructure and engineering works.

Approved Planning 1 paper

AI summaryWigan Planning Committee approved a drive-thru coffee shop at Marus Bridge Retail Park, with 48 car parking spaces lost and 186 remaining. Conditions cover coal mining investigations, surface water drainage and electric vehicle charging.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedPlanning Committee vote, one abstention
MoneyNot stated
What happens nextBegin within three yearsDevelopment must start by 2029
Who it affectsMarus Bridge Retail Park, Winstanley wardPart of the existing car park

What was decided

The committee granted planning permission for a single-storey drive-thru coffee unit of 196 square metres gross floor space, including a 28 square metre bin and plant compound. Report P15

Eleven members voted in favour, one against, with one abstention, against the officer recommendation to approve. Report P231

Why

Officers found the proposal acceptable in principle because a sequential test showed no suitable sites in nearby local centres of Hawkley Hall or Winstanley for a drive-thru operation. Report P120, P122, P123, P134

Transport officers raised no objection, as surveys on 14th to 16th March 2025 showed peak use of 94 spaces, leaving 83 or more available after the development. Report P151, P152, P153, P156

The Coal Authority withdrew its objection after a second Coal Mining Risk Assessment dated 20th March 2026, with risks to be addressed by conditions. Report P65, P215, P216

What happens next

Pre-commencement conditions require intrusive site investigations for coal mining, a sustainable surface water drainage scheme, and a remediation strategy if unexpected contamination is found. Report P199, P214, P217

Before occupation, the developer must submit a signed declaration that the site is safe and stable, details of cycle storage, and an electric vehicle charging point. Report P161, P209

A separate advertisement consent application will be needed for signage on the building. Report P17, P172

Options considered

  • Chosen: Approve the application as recommended by officers. Compliant with development plan and NPPF, with conditions addressing all material concerns Report P230, P231
  • Rejected: Refuse the application. Officers concluded concerns over traffic and parking loss did not demonstrate planning harm sufficient to refuse Report P84, P220
  • Rejected: Alternative site on Warrington Road. Not sequentially preferable as it lies outside any defined town or local centre Report P124

Implications

  • Risk: Coal mining legacy, including a possible buried opencast highwall and shallow coal workings, requires intrusive investigations and possibly special foundations before development. Report P65, P213, P214, P215
  • Climate: Surface water runoff must be reduced by 50 percent compared with the existing brownfield rate, and at least one electric vehicle charging point is required. Report P78, P199, P209
  • Equalities: Two accessible parking bays are provided to the front of the building, with level threshold access for all users. Report P18, P160, P178
  • Legal: Multiple pre-commencement and pre-occupation planning conditions must be discharged by the Local Planning Authority.
  • Other: Biodiversity Net Gain does not apply as the de minimis exemption is met, with no existing onsite habitat. Report P192, P193, P194
  • Other: Unrestricted opening hours are proposed, but delivery hours will be controlled by condition to protect residential amenity. Report P16, P181, P186

Who and where

  • Users of Marus Bridge Retail Park in Winstanley ward Report P7, P8, P10
  • Adjacent retailers including Sainsbury's, McDonald's and Homebase at the retail park Report P11, P44, P50
  • Residents on Worthington Way and along Warrington Road to the east Report P13, P176
  • Ward councillor who raised concerns about traffic and parking Report P84
  • Future customers and staff of the drive-thru coffee unit Report P136, P161

Timeline

  • 14th to 16th March 2025: Car park occupancy surveys undertaken by a survey company Report P151
  • 26th September 2025: Initial Coal Mining Risk Assessment prepared by GeoDyne Limited Report P20
  • 7th January 2026: Coal Mining Risk Assessment report reviewed by the Coal Authority Report P63
  • 20th March 2026: Updated Coal Mining Risk Assessment submitted and accepted Report P20, P65
  • 23rd June 2026: Advertisement consent for totem sign approved under separate application Report P58
  • 7th July 2026: Planning Committee resolved to grant planning permission
  • Three years from the date of permission: Deadline for the development to begin

Plain English for the jargon

  • Sui Generis: A planning use class for uses that do not fall within any other defined category
  • NPPF: National Planning Policy Framework, the national planning policy guidance
  • PfE: Places for Everyone, the joint Development Plan Document for nine Greater Manchester districts
  • UDP: Wigan Replacement Unitary Development Plan 2006, with some saved policies still in use
  • Sequential test: A test requiring main town centre uses to be located in centres before edge of centre and out of centre sites are considered
  • AQMA: Air Quality Management Area, an area where air quality objectives are not being met
  • LLFA: Lead Local Flood Authority, the council body responsible for surface water drainage
  • BNG: Biodiversity Net Gain, a measurable improvement in biodiversity resulting from a development
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item3

Resolved

Approved Vote: In Favour (of Approval) 11 Against (Approval) 1 Abstain 1 The Committee approve the planning application and grant planning permission, subject to the conditions specified below. Representations had been received in relation to additional traffic and loss of car parking spaces. Conditions: 1. The development hereby approved must be begun not later than the expiration of three years beginning with the date of this permission. 2. The development hereby approved shall be carried out in accordance with the following plans: - Existing Site Block Plan - drawing no: 208100 Rev P03; - Proposed Site Block Plan - drawing no: 208150 Rev P03; - Proposed Ground Floor Plan External Layout - drawing no: 208151 Rev P02; - Proposed Roof Plan – drawing no: 208152 Rev P00; - Proposed Elevations - drawing no: 208250 Rev P00; - Illuminated Bollard Details; and - Proposed Height restrictor drawing no 26-SBS001 Rev 01. 3. If, during development, contamination not previously identified is found to be present at the site then no further development shall be carried out until a remediation strategy, options appraisal and verification plan have been submitted to, and approved in writing by, the Local Planning Authority, detailing how the unsuspected contamination shall be dealt with. The remediation measures shall thereafter be implemented as approved. The development hereby approved shall not be occupied until a verification report demonstrating the completion of works and the effectiveness of the remediation has been submitted to, and approved in writing by, the Local Planning Authority. If no contamination is identified, a Completion Statement shall be submitted on completion of the approved development. 4. No development shall take place until: a) A scheme of intrusive investigations has been carried out on site to establish the risks posed to the development by past coal mining activity; and b) Any remediation works and/or mitigation measures to address land instability arising from coal mining legacy, as may be necessary, have been implemented on site in full in order to ensure that the site is made safe and stable for the development proposed. The intrusive site investigations and remedial works shall be carried out in accordance with authoritative UK guidance. 5. The development hereby approved shall not be occupied until a signed statement or declaration prepared by a suitably competent person, confirming that the site is or has been made safe and stable for the approved development, has been submitted to, and approved in writing by, the Local Planning Authority. This document shall confirm the methods and findings of the intrusive site investigations and the completion of any remedial works and/or mitigation necessary to address the risks posed by past coal mining activity. 6. No development shall take place until details of a sustainable surface water drainage scheme and a foul ... view the full minutes text for item 3.
Word for word from the decision Wigan published for this meeting. Source: democracy.wigan.gov.uk

Follow this further

Built from Wigan's papers

What the report saysPro

Report to Planning Committee

Report to Planning Committee

Planning application reference: A/26/100333/FULL

Speaking arrangements:

▪ One speaker against for 4 minutes. ▪ One speaker in favour for 4 minutes.

Applicant: Hathaway Opportunity Fund General Partner Ltd. C/O Cube Advisers Ltd.

Development proposed: Erection of a coffee shop drive-thru unit (Sui Generis) with associated landscaping, supporting infrastructure and engineering works.

Location: Marus Bridge Retail Park, Worthington Way, Wigan.

Ward: Winstanley.

Site description

The application site is located within Marus Bridge Retail Park and comprises part of the existing vehicle parking area serving the retail park.

The retail park is characterised by large retail food stores and commercial uses together with associated parking and servicing areas. The majority of units are served by the large vehicle parking area located centrally within the retail park. To the south of the site are additional commercial uses, including a petrol filling station and a McDonald’s drive‑thru restaurant, which are served by dedicated parking areas.

The site is located within the northern section of the vehicle parking area and will be located alongside the railings which separate part of the car park.

Vehicle access into the retail park is taken from Worthington Way, which connects to the A49 Warrington Road to the east of the site. Residential properties are also located to the east of the site, beyond the retail park and Warrington Road.

Proposal

Planning permission is sought for the erection of a single-storey drive-thru coffee unit (Sui Generis), with associated landscaping, supporting infrastructure and engineering works. The proposed building is single-storey and has an internal floor space of 168 square metres (sq m). An enclosed bin/plant compound is proposed alongside the western gable of the building, with a floor area of 28 sq m. The gross floor space of the building is therefore 196 sq m.

The proposed development incorporates a drive-thru lane with height restrictor, together with associated vehicle and cycle parking. The applicant proposes unrestricted opening hours for the unit.

The building is contemporary in design with a flat roof, however, there is a small feature which projects upwards from the roof. Its elevations consist of timber effect cladding panels and large glazed openings with dark grey aluminum frames. Signage is proposed to be integrated into the building, however this would be required to be subject to a future application for advertisement consent (see ‘Relevant planning decisions’ section of this report below for further details).

The proposed drive-thru unit will be located within the northern section of the vehicle parking area, alongside the railings which partially separate the existing car park. The application extends across a total of 54 no. parking spaces, and the development includes 6 no. new spaces (two of which will be accessible bays) along with two motorcycle spaces. Cycle parking provision will consist of 3 no. cycle loops to accommodate 6 no. bicycles and secure staff cycle storage for 2 no. bicycles.

The application is supported by the following plans and documents, available on the Council’s website or on request from the Local Planning Authority:

- Site Location Plan - Proposed Site Plan - Elevations and Floor Plans - Elevation details of height restrictor - Coal Mining Risk Assessment report prepared by GeoDyne Limited (dated 26th September 2025) - Coal Mining Risk Assessment report prepared by GeoDyne Limited (dated 20th March 2026) - Drainage details - Planning Statement - Transport Statement

Local Plan allocation

The site is unallocated within the defined urban area.

Relevant local and national planning policies guidance

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A/26/100333/FULL: Erection of a coffee shop drive-thru unit (Sui Generis) with associated landscaping, supporting infrastructure and engineering works.Report 560 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 22 attended
JH
Councillor John HardingChairman, present
DH
Councillor David HurstVice-Chair, present
PJ
Councillor Paul John BlayCommittee Member, apologies
LC
Councillor Liam ClarkeCommittee Member, present
MD
Councillor Matt DawberCommittee Member, present
PF
Councillor Paul ForbesCommittee Member, present
SA
Councillor Stuart Andrew GerrardCommittee Member, apologies
SJ
Councillor Susan June GreensmithCommittee Member, present
YK
Councillor Yvonne KlieveCommittee Member, present
MO
Councillor Maureen O'BernCommittee Member, present
CR
Councillor Charles RigbyCommittee Member, present
ES
Councillor Eileen StrathearnCommittee Member, present

All 22 on the meeting page

On this subject at Wigan

Search all
  1. A/26/100333/FULL - Erection of a coffee shop drive-thru unit (Sui Generis) with associated landscaping, supporting infrastructure and engineering works.This decision
  2. A/25/099558/FULL - Erection of detached dwelling, formation of new shared vehicular access and alterations to existing driveway, following demolition of existing garage.Approved
  3. A/20/90256/FULL - Demolition of existing building and erection of a part 3 storey, part 4 storey building containing 9 apartments with associated parking.Refused
  4. A/20/90256/FULL - Demolition of existing building and erection of a part 3 storey, part 4 storey building containing 9 apartments with associated parkingDeferred

More from Wigan Planning Committee

All decisions
MeetingDecisionOutcome
3 Sep 2026 A/25/099558/FULL - Erection of detached dwelling, formation of new shared vehicular access and alterations to existing driveway, following demolition of existing garage.Approved Vote: In Favour (of Approval) 9 Against (Approval) 0 Abstain 1 The Committee approve the planning applicatio... Approved Open
4 Aug 2026 A/26/100488/FULL - Change of use of land to accommodate a short stay holiday let accommodation comprising of a shepherd's hut, gazebo and associated landscape works (Retrospective application).Approved Vote: In Favour (of Approval) 13 Against (Approval) 1 Abstain 0 The Committee approve the planning applicati... Approved Open
7 Jul 2026 A/26/100770/FULL - Conversion of existing premises (Use Class E) to provide two commercial units within Use Class E at ground floor, with new shopfronts and alterations to fenestration, together with two self-contained one-bed flats at first floor (Use Class C3).Approved Vote: In Favour (of Approval) 12 Against (Approval) 1 Abstain 0 The Committee approve the planning applicati... Approved Open
14 Apr 2026 A/25/09945/MAJOR - Change of use of Haigh Hall to a mixed-use cultural venue comprising art galleries, education suite, event spaces, restaurant/café, retail, office and bedroom accommodation, together with a rooftop extension to form a barApproved Vote: In Favour (of Approval) 11 Against (Approval) 0 Abstain 1 The Committee approve the planning applicati... Approved Open
14 Apr 2026 A/25/099946/LB - Listed building consent for internal and external alterations to facilitate a change of use of Haigh Hall to a mixed-use cultural venue comprising art galleries, education suite, event spaces, restaurant/café, retail, officApproved Vote: In Favour (of Approval) 10 Against (Approval) 0 Abstain 2 The Committee approve the planning applicati... Approved Open