Resolved
Approved Vote: In Favour (of Approval) 9 Against (Approval) 0 Abstain 1 The Committee approve the planning application and grant planning permission, subject to the conditions specified below. Representations had been received in relation to overdevelopment and out of character/design; loss of light, overshadowing and visual dominance; loss of privacy and overlooking; ecological and environmental concerns; noise and disturbance; highway safety, access and parking, drainage and land levels; property value impact; and lack of meaningful change from the previous application. Conditions and Reasons: 1. The development hereby approved must be begun not later than the expiration of three years beginning with the date of this permission. Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990 (as amended). 2. The development hereby approved shall be carried out in accordance with the following plans and drawings: • Site Plan and Location Plan Dwg: 005.01.04 Rev E; • Floor Plan Dwg: 005.01.01 Rev B; • Elevation (1) Dwg: 005.01.03 Rev B; • Elevation (2) Dwg: 005.01.02 Rev B; • Highways and Transport Dwg: 005.01.06 Rev B; and • Landscape Proposal Dwg: 7759.01 Rev A. Reason: For the avoidance of doubt and to ensure a satisfactory standard of development, in accordance with the remaining policies of the Wigan Replacement Unitary Development Plan and the Wigan Local Plan Core Strategy, the adopted Places for Everyone Joint Development Plan and the National Planning Policy Framework. 3. No development shall take place until the following information has been submitted to, and approved in writing by, the Local Planning Authority: (i) A full site survey showing: The datum used to calibrate the site levels; Levels along all site boundaries; Levels across the site at regular intervals; and Floor levels of adjoining buildings. (ii) Full details of the proposed finished floor levels of the building and proposed levels for external areas at regular intervals. The development shall thereafter be implemented only in full accordance with the approved details. Reason: Prior approval of such details is necessary to help to assimilate the development into its surroundings, having regard to Policy DP3 of the National Planning Policy Framework, Policies CP10 and CP17 of the Wigan Local Plan Core Strategy and Policies JP-S1 and JP-P1 of the Places for Everyone Joint Development Plan. 4. No development shall take place until details of a sustainable surface water drainage scheme and a foul water drainage scheme have been submitted to, and approved in writing by, the Local Planning Authority. The drainage schemes must include: i. An investigation of the hierarchy of drainage options in the National Planning Practice Guidance (or any subsequent amendment thereof). This investigation shall include evidence of an assessment of ground conditions and the potential for infiltration of surface water in accordance with BRE365; ii. A restricted rate of discharge of surface water agreed with the local planning authority (if it is agreed that infiltration is discounted by the investigations); ... view the full minutes text for item 10.