Planning Committee, Tuesday 4 August 2026 at 2.00pm

A/26/100488/FULL - Change of use of land to accommodate a short stay holiday let accommodation comprising of a shepherd's hut, gazebo and associated landscape works (Retrospective application).

Approved Planning 1 paper

AI summaryWigan Planning Committee approves retrospective shepherd's hut holiday let in Lowton Green Belt by 13 votes to 1, subject to conditions including a 14-day occupancy cap and a hot tub water management scheme.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedVote 13 in favour, 1 against, 0 abstentions
MoneyNot stated
What happens nextConditions to be dischargedHot tub scheme within 2 months; EV charging within 3 months
Who it affectsGreen Belt at 8 Belle Vue, LowtonShepherd's hut, gazebo and landscaping to be retained

What was decided

The Committee granted retrospective planning permission for a shepherd's hut, timber gazebo and associated landscaping as short-stay holiday let accommodation on land at 8 Belle Vue, Lowton, within the Green Belt. Report P7, P8, P15

The permission is subject to conditions including a maximum 14 consecutive day occupancy, a ban on use as a sole or main residence, and a hot tub water management and disposal scheme to be approved within two months. Report P115, P165

An Electric Vehicle charging point must be provided within 3 months of the decision, alongside a Lighting Design Strategy for Biodiversity and an informative on protected species. Report P54, P135, P169

Why

Officers concluded the development falls within the NPPF paragraph 154(b) exception for appropriate facilities linked to outdoor recreation, and therefore is not inappropriate development in the Green Belt. Report P100, P111, P118

The shepherd's hut, gazebo and landscaping were judged to preserve the openness of the Green Belt given their modest scale, screening by existing vegetation and distance from public vantage points. Report P105, P108, P109

The scheme was found to support rural tourism, deliver biodiversity enhancements such as bat and bird boxes, and cause no unacceptable harm to neighbour amenity, highways, drainage or ecology, subject to the conditions. Report P114, P138, P149, P158, P166

What happens next

A Hot Tub Water Management and Disposal Scheme must be submitted and approved in writing by the council within two months of the date of permission. Report P165

One EV charging point must be made available within 3 months of the decision and retained thereafter. Report P169

All external lighting must be installed and maintained in accordance with a Lighting Design Strategy for Biodiversity to be approved by the Local Planning Authority, and the development must be built and operated strictly in line with the approved plans. Report P54

Options considered

  • Chosen: Approve with conditions as recommended by officers. Development deemed not inappropriate in the Green Belt under NPPF paragraph 154(b), preserves openness, causes no unacceptable amenity, highway or ecology harm, and supports rural tourism. Report P111, P118, P120, P186
  • Rejected: Refuse. Not supported in the papers as the officer assessment found no material harm sufficient to outweigh the presumption in favour of sustainable development. Report P119, P184, P186

Implications

  • Legal: Permission has been granted under Section 73A of the Town and Country Planning Act 1990, retrospectively regularising development already on site, with the usual legal caveat that a retrospective application is not a ground for refusal or for penalising the applicant. Report P15, P177, P178
  • Environment and climate: A condition secures an EV charging point to mitigate air quality impacts, and the biodiversity exemption under paragraph 13 of Schedule 7A of the Town and Country Planning Act 1990 applies because the application is retrospective, so no mandatory Biodiversity Gain Plan is required. Report P136, P169
  • Risk: Officers judged the site, located near a high-pressure gas pipeline (Feeder 15) and in a low-risk coal mining area, to fall outside the pipeline's Building Proximity Distance and to raise no land contamination or stability concerns. Report P70, P71, P166

Who and where

  • The applicant (owner of 8 Belle Vue, Lowton) seeking to retain the shepherd's hut and gazebo as holiday let accommodation Report P5, P8, P15
  • Visitors using the short-stay holiday let, capped at two persons and stays of 14 consecutive days Report P115, P146
  • Neighbouring residents along Belle Vue and Byrom Lane, addressed by 45 representations (26 supporting, 19 objecting) Report P73, P75, P76, P142
  • Users of Public Footpath Golborne No. 35, which runs along the access road Report P11, P58, P156
  • Local rural economy, including nearby restaurants, pubs, cafes, shops, garden centres and Pennington Flash visitor economy Report P76, P99, P114

Timeline

  • 23 March 2026: Location plan received as part of the application
  • 14 April 2026: Site notice displayed on Byrom Lane at the entrance to the private access road Report P180
  • 24 April 2026: Replacement site notice displayed after the original was reported removed before the consultation period ended Report P180
  • Within 2 months of permission: Hot Tub Water Management and Disposal Scheme to be submitted to and approved by the Local Planning Authority Report P165
  • Within 3 months of permission: EV charging point to be made available alongside the holiday let parking space and retained thereafter Report P169

Plain English for the jargon

  • Green Belt: Designated open land around built-up areas where the NPPF attaches strong protection against inappropriate development and requires preservation of openness.
  • NPPF paragraph 154(b): National policy exception allowing buildings for outdoor sport and outdoor recreation in the Green Belt where openness is preserved and the purposes of the Green Belt are not conflicted with.
  • Section 73A of the Town and Country Planning Act 1990: Legal provision that allows a local planning authority to grant planning permission retrospectively for development that has already been carried out.
  • Biodiversity Net Gain (BNG): Mandatory 10% biodiversity uplift normally required under Schedule 7A, but retrospective applications are exempt from the requirement to submit a Biodiversity Gain Plan.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item7

Resolved

Approved Vote: In Favour (of Approval) 13 Against (Approval) 1 Abstain 0 The Committee approve the planning application and grant planning permission, subject to the conditions specified below. Representations had been received in objection to the application in relation to inappropriate development in the Green Belt; retrospective nature of the application undermines the planning process; impact on wildlife and ecology; the adequacy and regulatory compliance of the septic tank and wastewater drainage arrangements; boundary and land ownership disputes; the installation and compliance of utility infrastructure; increased vehicle movements creating road safety and pedestrian conflict issues; impact on neighbouring residential amenity including overlooking, loss of privacy, noise disturbance; and inadequate consultation before the development became operational. Representations had been received in support of the application in relation to small scale and well managed tourism use; positive contribution to the local economy; environmental and biodiversity benefits; minimal traffic generated; minimal visual and residential amenity impacts; and high quality, well crafted development that has been sensitively designed and integrated into its rural surroundings. Conditions: 1. The development hereby approved shall be carried out in accordance with the details indicated on plan and drawing references: - Location Plan – Received 23/03/2026; - Post Development Site Plan – Drawing No. 1630226 REV B; and - Shepherd’s Hut and Gazebo Info – Drawing No. 1610226. 2. The short stay holiday let accommodation hereby approved shall only be occupied for holiday purposes and by no person, or group of persons, for a period exceeding 14 consecutive days. The accommodation shall not be occupied as a person's sole or main place of residence at any time. 3. Within two months of the date of this permission, a Hot Tub Water Management and Disposal Scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The scheme shall include: a) Details of the maintenance regime for the hot tub, including the type and quantity of any chemicals used for water treatment; b) Procedures for the replacement, storage, treatment and disposal of water from the hot tub; c) Measures to ensure that water discharged to the field drain is free from chemical additives, contaminants and pollutants at the time of discharge, including details of any dechlorination or other treatment processes required; d) A programme of water quality monitoring and testing, including the parameters to be tested, testing frequency, trigger levels for preventing discharge, and arrangements for maintaining records of all testing and maintenance activities; e) Measures to inform and require guests not to introduce soaps, detergents, shampoos, oils, bath products, cleaning products or any other substances into the hot tub which could adversely affect water quality or the receiving environment, including the provision of visitor information and on-site signage; f) Procedures for inspecting the hot tub ... view the full minutes text for item 7.
Word for word from the decision Wigan published for this meeting. Source: democracy.wigan.gov.uk

Follow this further

Built from Wigan's papers

What the report saysPro

Report to Planning Committee

Report to Planning Committee

Planning application reference: A/26/100488/FULL

Speaking arrangements:

▪ One speaker against for 4 minutes. ▪ One speaker in favour for 4 minutes.

Applicant: [name removed].

Agent: JT Design Consultancy.

Development Proposed: Change of use of land to accommodate a short stay holiday let accommodation comprising of a shepherd’s hut, gazebo and associated landscape works (Retrospective application).

Location: 8 Belle Vue, Lowton, Warrington, WA3 1BN.

Ward: Lowton East.

Site description

The application site comprises an area of land located adjacent to, and accessed via, 8 Belle Vue, a two-storey detached dwelling situated at the end of a private access road to the south of Byrom Lane. The private road also provides access to neighbouring properties at nos. 2, 3 and 4 Belle Vue and forms a public footpath (Golborne no.35) from Byrom Lane as far as 2 Belle Vue.

The dwelling occupies a substantial plot containing a number of existing outbuildings. The specific application site is located to the east of the garden curtilage of the dwelling, and is relatively secluded in character, being enclosed by mature trees and vegetation.

The site lies wholly within the designated Green Belt. Pennington Flash Nature Reserve is located approximately 300 metres to the north-east of the site.

Proposal

Planning permission is sought retrospectively for the use of the land for the siting of a shepherd’s hut along with the erection of a timber gazebo and associated landscaping, in connection with the provision of short stay holiday let accommodation. Retrospective applications of this nature may be made under Section 73A of the Town and Country Planning Act 1990 (as amended), which allows a Local Planning Authority (LPA) to grant planning permission for development that has already been carried out.

The shepherd’s hut is predominately constructed from timber and measures 6.25 metres in length by 3.65 metres in width, with a maximum height of 4.05 metres. The hut includes an open plan double bedroom, living area and kitchen with a separate shower room. The gazebo is constructed from timber and measures 3.5 metres in length by 2.8 metres in width, with a maximum height of 3.8 metres. The gazebo provides sheltered cover for a hot tub.

In addition, landscaping works on the site comprise of a raised decking access path between the shepherd’s hut and gazebo, along with stone surfacing to an outdoor seating area, and an access path from the entrance of the site.

A designated vehicle parking space has been made available for visitors of the facility on an existing area of hardstanding closer to the dwelling, with pedestrian access only to the hut itself.

The following documents support the application and are available to view on the Council’s website or on request from the LPA:

▪ Planning application form, Notices and Certificates. ▪ Location Plan. ▪ Existing and Proposed Site Plans. ▪ Elevation Plans and Floor Plans. ▪ Design and Access Statement. ▪ Supporting correspondence.

Local Plan Allocation

The site is located within the designated Green Belt.

Relevant local and national planning policies and guidance

▪ National Planning Policy Framework (NPPF)

The NPPF sets out a presumption in favour of sustainable development. Paragraph 7 of the Framework states that the objective of sustainable development can be summarised as meeting the needs of the present without compromising the ability of future generations to meet their own needs. Paragraph 9 of the Framework states that plans and decisions need to take local circumstances into account, so that they reflect the character, needs and opportunities of each area.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A/26/100488/FULL: Change of use of land to accommodate a short stay holiday let accommodation comprising of a shepherd's hut, gazebo and associated landscape works (Retrospective application).Report 430 KB DownloadRead as text

At this meeting

Whole meeting
6MinutesOn the agenda
7A/26/100488/FULL - Change of use of land to accommodate a short stay holiday let accommodation comprising of a shepherd's hut, gazebo and associated landscape works (Retrospective application).This decision

Who was there

14 of 22 attended
JH
Councillor John HardingChairman, present
DH
Councillor David HurstVice-Chair, present
PJ
Councillor Paul John BlayCommittee Member, present
LC
Councillor Liam ClarkeCommittee Member, present
MD
Councillor Matt DawberCommittee Member, present
PF
Councillor Paul ForbesCommittee Member, present
SA
Councillor Stuart Andrew GerrardCommittee Member, present
SJ
Councillor Susan June GreensmithCommittee Member, present
YK
Councillor Yvonne KlieveCommittee Member, present
MO
Councillor Maureen O'BernCommittee Member, present
CR
Councillor Charles RigbyCommittee Member, present
ES
Councillor Eileen StrathearnCommittee Member, present

All 22 on the meeting page

On this subject at Wigan

Search all
  1. A/26/100488/FULL - Change of use of land to accommodate a short stay holiday let accommodation comprising of a shepherd's hut, gazebo and associated landscape works (Retrospective application).This decision
  2. A/25/098753/FULL - Change of use of former public house at ground floor level to two retail units (Use Class E) and 4 no. flats at first floor, together with first floor extension to side.Refused

More from Wigan Planning Committee

All decisions
MeetingDecisionOutcome
3 Sep 2026 A/25/099558/FULL - Erection of detached dwelling, formation of new shared vehicular access and alterations to existing driveway, following demolition of existing garage.Approved Vote: In Favour (of Approval) 9 Against (Approval) 0 Abstain 1 The Committee approve the planning applicatio... Approved Open
7 Jul 2026 A/26/100333/FULL - Erection of a coffee shop drive-thru unit (Sui Generis) with associated landscaping, supporting infrastructure and engineering works.Approved Vote: In Favour (of Approval) 11 Against (Approval) 1 Abstain 1 The Committee approve the planning applicati... Approved Open
7 Jul 2026 A/26/100770/FULL - Conversion of existing premises (Use Class E) to provide two commercial units within Use Class E at ground floor, with new shopfronts and alterations to fenestration, together with two self-contained one-bed flats at first floor (Use Class C3).Approved Vote: In Favour (of Approval) 12 Against (Approval) 1 Abstain 0 The Committee approve the planning applicati... Approved Open
14 Apr 2026 A/25/09945/MAJOR - Change of use of Haigh Hall to a mixed-use cultural venue comprising art galleries, education suite, event spaces, restaurant/café, retail, office and bedroom accommodation, together with a rooftop extension to form a barApproved Vote: In Favour (of Approval) 11 Against (Approval) 0 Abstain 1 The Committee approve the planning applicati... Approved Open
14 Apr 2026 A/25/099946/LB - Listed building consent for internal and external alterations to facilitate a change of use of Haigh Hall to a mixed-use cultural venue comprising art galleries, education suite, event spaces, restaurant/café, retail, officApproved Vote: In Favour (of Approval) 10 Against (Approval) 0 Abstain 2 The Committee approve the planning applicati... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies