Resolved
Approved Vote: In Favour (of Approval) 13 Against (Approval) 1 Abstain 0 The Committee approve the planning application and grant planning permission, subject to the conditions specified below. Representations had been received in objection to the application in relation to inappropriate development in the Green Belt; retrospective nature of the application undermines the planning process; impact on wildlife and ecology; the adequacy and regulatory compliance of the septic tank and wastewater drainage arrangements; boundary and land ownership disputes; the installation and compliance of utility infrastructure; increased vehicle movements creating road safety and pedestrian conflict issues; impact on neighbouring residential amenity including overlooking, loss of privacy, noise disturbance; and inadequate consultation before the development became operational. Representations had been received in support of the application in relation to small scale and well managed tourism use; positive contribution to the local economy; environmental and biodiversity benefits; minimal traffic generated; minimal visual and residential amenity impacts; and high quality, well crafted development that has been sensitively designed and integrated into its rural surroundings. Conditions: 1. The development hereby approved shall be carried out in accordance with the details indicated on plan and drawing references: - Location Plan – Received 23/03/2026; - Post Development Site Plan – Drawing No. 1630226 REV B; and - Shepherd’s Hut and Gazebo Info – Drawing No. 1610226. 2. The short stay holiday let accommodation hereby approved shall only be occupied for holiday purposes and by no person, or group of persons, for a period exceeding 14 consecutive days. The accommodation shall not be occupied as a person's sole or main place of residence at any time. 3. Within two months of the date of this permission, a Hot Tub Water Management and Disposal Scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The scheme shall include: a) Details of the maintenance regime for the hot tub, including the type and quantity of any chemicals used for water treatment; b) Procedures for the replacement, storage, treatment and disposal of water from the hot tub; c) Measures to ensure that water discharged to the field drain is free from chemical additives, contaminants and pollutants at the time of discharge, including details of any dechlorination or other treatment processes required; d) A programme of water quality monitoring and testing, including the parameters to be tested, testing frequency, trigger levels for preventing discharge, and arrangements for maintaining records of all testing and maintenance activities; e) Measures to inform and require guests not to introduce soaps, detergents, shampoos, oils, bath products, cleaning products or any other substances into the hot tub which could adversely affect water quality or the receiving environment, including the provision of visitor information and on-site signage; f) Procedures for inspecting the hot tub ... view the full minutes text for item 7.