Resolved
Resolved (11:0) – That the application be approved subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission. 2. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority on 28th January 2019 and listed as follows: 1887-00A; 1887-07D; 1887-08D; 1887-09C 3. Before any construction above ground level commences, samples of the materials to be used in the external construction of this development shall be submitted to and approved in writing by the Local Planning Authority. The approved materials shall then be used in the construction of the development. 4. No development shall commence until the final detailed sustainable drainage design, for the management and disposal of surface water from the site, demonstrating compliance with the discharge hierarchy and in accordance with the principles identified in the following preliminary documents, including but not limited to a restricted discharge rate of 5 l/s and the offering of all communal elements of the surface water drainage system for adoption by United Utilities at adoptable standards, has been submitted to and approved in writing by the Local Planning Authority, in consultation with the Lead Local Flood Authority: · Drainage Strategy and Flood Risk Assessment (Delamere Avenue, Eastham, Wirral/ CL8198/ SWF Consultants) · Proposed Drainage Layout (07.11.18/ rev A/ Drawing Number CL8198-01/ SWF Consultants) 5. The development hereby permitted by this planning permission, including all components of the sustainable drainage system, shall be carried out in accordance with the approved final Sustainable Drainage Strategy, including any phasing embodied within, and maintained in perpetuity in accordance with an agreed Operation and Maintenance Plan, to be submitted for each development phase, approved by the Local Planning Authority, in consultation with the Lead Local Flood Authority. The approved drainage scheme shall be fully constructed prior to occupation in accordance with the approved details, phasing and timetable embodied within the approved final Sustainable Drainage Strategy, or within any other period as may subsequently be agreed, in writing, by the Local Planning Authority in consultation with the Lead Local Flood Authority. ‘As built’ drainage design/layout drawings and a final Operation and Maintenance Plan, confirming asset details and maintenance arrangements, shall be submitted to the Lead Local Flood Authority, in accordance with any approved phasing, prior to occupation. 6. No development shall take place until a full scheme of works and timetable for the construction of the new highways and/or amendment of the existing highway made necessary by this development, including new carriageways, footways, footpaths, street lighting, surface water drainage, traffic signs, TROs, road markings, tactile paved pedestrian crossings, street furniture, access ... view the full minutes text for item 151.