Worcester City Council
Policy and Resources Committee, Monday 16 October 2023 at 7.00pm

St Martins Gate Multi Storey Car Park Photovoltaic Panel Array Extension

Agreed Committee 1 paper

Policy and Resources Committee agreed this item on Monday 16 October 2023. Below is the council's own wording, with the papers it was decided on.

Item52

Resolved

That the Committee agreed to: 1. approve the business case for an extension of the Photovoltaic Panel array on the top deck of St Martins Gate Multi Storey Car Park; and 2. delegate the award of a works contract to the Corporate Director - Finance and Resources, subject to there being no material deviation in the final business case post tender.
Word for word from the decision Worcester published for this meeting. Source: committee.worcester.gov.uk

Follow this further

Built from Worcester's papers

What the report saysPro

Report to Policy and Resources Committee, 6 pages

Recommendations

The Committee is recommended to:

1.1Approve the business case for an extension of the Photovoltaic Panel array on the top deck of St Martins Gate Multi Storey Car Park; and

1.2Delegate the award of a works contract to the Corporate Director - Finance and Resources, subject to there being no material deviation in the final business case post tender.

Background

2.1Following the Environment Committee’s consideration of an outline proposal last summer, the Council commissioned mechanical and electrical consultants Ridge to undertake a detailed feasibility for an extension of the photovoltaic panel array on the open top deck of St Martins Gate car park.

Summary

3.1The Ridge feasibility study reports that an arrangement similar to that already installed at the car park is the best option. A car port-style array of panels mounted on a steel frame would maximise the available space and generate 239 mega watt hours of electricity per annum.

3.2The total cost of the new works is estimated to be £521,000 including fees.

3.3The amount of electricity generated equates to an annual saving of over £58,000 pa at the current price paid by the Council.

3.4It would be necessary to remove 38 parking bays as the width between the stanchions supporting the panel frame would only be wide enough for 2 spaces, rather than 3 as currently marked out. The loss of income would be limited as currently the car park is only at maximum capacity in the fortnight before Christmas.

3.5However, taking into account the loss of revenue and array maintenance costs, the net annual saving would be £46,000 pa, representing a simple pay back of 11 years. 3.6 The cost of borrowing over the 25 year life of the solar panels at a rate of 5% would be £33k p.a. The net return at current prices would therefore be £13k p.a. (or 2.5% on the £521,000 invested).

Information

Construction

3.7The roof area of the car park has an existing structural steel PV canopy on level 5 which spans over part of the parking area. The new installation will comprise of 5No additional new canopy structures which follow a similar form to the existing structural PV canopy.

3.8The scope of works considered by the consultants Ridge has encompassed Electrical and Structure issues in detail:

Electrical

• Photovoltaics (PV) system. • Low Voltage (LV) power distribution and equipment. • Cable containment systems. • Final circuit small power & lighting distribution. • Sub-metering of electrical loads and linking to the existing energy metering system. • Earthing and equipotential bonding installation. • Link to the existing lightning protection system. • Transient over voltage surge suppression. • Normal and emergency lighting. • Lighting control including daylight dimming and presence detection. • IT cabling systems. • Testing and commissioning of the installed systems.

Structure

• Existing building structure • Super structure (canopy) • Secondary steel work and bracing • Fixings into existing structure • Drainage • Construction risk management and loadings • Wind loading

3.9There are no insurmountable issues and costs associated with mitigation, provision etc are included in the cost estimates provided by Ridge.

3.10Informal planning officer advice has also been obtained. The project will require planning consent and there are a number of issues that will need to be dealt with satisfactorily:

• The structures supporting the PV’s should be set off all boundaries by at least 1 metre to reduce the impact on the street scene.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
St Martins Gate Multi Storey Car Park Photovoltaic Panel Array ExtensionReport 6 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Worcester

Search all
  1. St Martins Gate Multi Storey Car Park Photovoltaic Panel Array ExtensionThis decision
  2. Savings Plan - St Martins Gate Multi Storey Car Park - LED Lighting RetrofitAgreed
  3. Proposal For Fees And Charges For The Use Of Electric Vehicle Charge Points At St Martins Gate Car ParkAgreed
  4. Application P18D0231 - St Martins Gate Multi-Storey Car ParkDecided

More from Worcester Policy and Resources Committee

All decisions
MeetingDecisionOutcome
30 Jun 2026 MinutesThat the minutes of the meeting held on 19 th May 2026 be approved as a correct record and signed by the Chair. Approved Open
30 Jun 2026 Quarter 4 and Annual Key Performance Indicator Report for 2025/26That the Committee agree to note the Council’s quarter 4 and annual performance for the Key Performance Indicators in... Agreed Open
30 Jun 2026 Provisional 2025/26 Outturn - Financial Monitoring ReportThat the Committee agree to note the following: 1. the Provisional 2025-26 Revenue outturn as detailed in section 2 o... Agreed Open
30 Jun 2026 Medium Term Financial Plan 2027/28 - 2031/32That the Committee agree: 1. to note the update; and 2. the MTFP and budget timetable as set out in paragraph 3.2 of ... Agreed Open
30 Jun 2026 Town Investment Plan UpdateThat the Committee agree to note the contents of this report. Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies