That the Committee agreed to: 1. approve the business case for an extension of the Photovoltaic Panel array on the top deck of St Martins Gate Multi Storey Car Park; and 2. delegate the award of a works contract to the Corporate Director - Finance and Resources, subject to there being no material deviation in the final business case post tender.
Word for word from the decision Worcester published for this meeting.Source: committee.worcester.gov.uk
1.1Approve the business case for an extension of the Photovoltaic Panel array on the top deck of St Martins Gate Multi Storey Car Park; and
1.2Delegate the award of a works contract to the Corporate Director - Finance and Resources, subject to there being no material deviation in the final business case post tender.
Background
2.1Following the Environment Committee’s consideration of an outline proposal last summer, the Council commissioned mechanical and electrical consultants Ridge to undertake a detailed feasibility for an extension of the photovoltaic panel array on the open top deck of St Martins Gate car park.
Summary
3.1The Ridge feasibility study reports that an arrangement similar to that already installed at the car park is the best option. A car port-style array of panels mounted on a steel frame would maximise the available space and generate 239 mega watt hours of electricity per annum.
3.2The total cost of the new works is estimated to be £521,000 including fees.
3.3The amount of electricity generated equates to an annual saving of over £58,000 pa at the current price paid by the Council.
3.4It would be necessary to remove 38 parking bays as the width between the stanchions supporting the panel frame would only be wide enough for 2 spaces, rather than 3 as currently marked out. The loss of income would be limited as currently the car park is only at maximum capacity in the fortnight before Christmas.
3.5However, taking into account the loss of revenue and array maintenance costs, the net annual saving would be £46,000 pa, representing a simple pay back of 11 years. 3.6 The cost of borrowing over the 25 year life of the solar panels at a rate of 5% would be £33k p.a. The net return at current prices would therefore be £13k p.a. (or 2.5% on the £521,000 invested).
Information
Construction
3.7The roof area of the car park has an existing structural steel PV canopy on level 5 which spans over part of the parking area. The new installation will comprise of 5No additional new canopy structures which follow a similar form to the existing structural PV canopy.
3.8The scope of works considered by the consultants Ridge has encompassed Electrical and Structure issues in detail:
Electrical
• Photovoltaics (PV) system. • Low Voltage (LV) power distribution and equipment. • Cable containment systems. • Final circuit small power & lighting distribution. • Sub-metering of electrical loads and linking to the existing energy metering system. • Earthing and equipotential bonding installation. • Link to the existing lightning protection system. • Transient over voltage surge suppression. • Normal and emergency lighting. • Lighting control including daylight dimming and presence detection. • IT cabling systems. • Testing and commissioning of the installed systems.
Structure
• Existing building structure • Super structure (canopy) • Secondary steel work and bracing • Fixings into existing structure • Drainage • Construction risk management and loadings • Wind loading
3.9There are no insurmountable issues and costs associated with mitigation, provision etc are included in the cost estimates provided by Ridge.
3.10Informal planning officer advice has also been obtained. The project will require planning consent and there are a number of issues that will need to be dealt with satisfactorily:
• The structures supporting the PV’s should be set off all boundaries by at least 1 metre to reduce the impact on the street scene.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.