Resolved
That the application be approved subject to the conditions listed in the report and the following additional conditions: 1 Condition 10 – 10% of the energy requirements of the development hereby approved shall be provided from renewable energy resources generated on land under the control of the applicant. The development shall be carried out in accordance with submitted details and the approved scheme shall be implemented prior to the first occupation of the development. Written confirmation from the installer of the technology, post build, verifying the installation has been installed shall be submitted to the Local Planning Authority prior to occupation. The site thereafter must be maintained to the required level of generation. Reason – In the interests of providing sustainable development. Condition 11 – The development hereby approved shall be constructed to a BREEAM standard of at least Very Good. A formal post construction assessment by a licensed BREEAM assessor and a copy of the certificate will be submitted for the written approval of the Local Planning Authority demonstrating what remedial measures shall be undertaken to achieve a ‘very good’ rating. The remedial measures shall then be undertaken within a timescale to be approved in writing by the Local Planning Authority’. Reason – In the interests of sustainable development. Condition 12 – No development shall commence until details of foul and surface water drainage works have been submitted to and approved in writing by the Local Planning Authority and carried out in accordance with these approved details. These details shall include: ` 1. Calculations and invert levels of the existing surface water system should be provided together with details to include calculations and invert levels of the proposals for the new development. This will enable the impact of the proposals on the downstream University watercourse/lake to be assessed. 2. Additional surface water shall not be connected to any foul/combined sewer, if a suitable surface water sewer is available. 3. Peak surface water run-off from the development shall be attenuated to 70% of the existing rate, in accordance with a scheme to reduce run of to be submitted to and agreed in writing by the Local Planning Authority (based on 1.40l/s/ha of connected impermeable areas). The scheme submitted shall include storage volume calculations, using computer modelling, allowing for a 1:30 year storm with no ... view the full minutes text for item 74e