West & City Centre Area Planning Sub-Committee approved this item on Wednesday 19 January 2011. Below is the council's own wording, with the papers it was decided on.
That the application be approved subject to the conditions listed in the report and the amended condition below. Amended Condition 10 The height of the treatment building shall not exceed 22.250m AOD. The height of the silos shall not exceed 24.4m AOD. Reason: In the interests of the visual amenity of the area in accordance with policy GP1 (Design) of the Local Plan. REASON: The proposal, subject to the conditions listed in the report and the amended condition above, would not ... view the full minutes text for item 44b
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to West & City Centre Area Planning Sub-Committee
COMMITTEE REPORT
Date: 19 January 2011 Ward: Holgate Team: Major and Commercial Parish: No Parish Team
Reference: 10/02519/FULM Application at: Water Works Landing Lane York For: Construction of water treatment works enclosed within a new building, new sub-station and new motor control centre kiosk. By: [name removed] Type: Major Full Application (13 weeks) Target Date: 11 February 2011 Recommendation: Approve
1.0PROPOSAL
1.1The application site is situated off Landing Lane within Acomb Landing Water Treatment Works in Holgate. The application site area is approximately 0.33 hectare, although the overall area of the site owned by Yorkshire Water is approximately 19 hectares. The Treatment Works provides the City of York with potable drinking water. The site has been used for water treatment since the nineteenth century. Over the years the water treatment works has been extended to meet supply and water quality regulations needs.
1.2The main east coast railway lines are situated approximately 15m to the west of the development proposals. Beyond the existing water treatment plants to the east of the site lies River Ouse. On the opposite side of the Ouse lies an existing public footpath and cycleway. RSPCA and Water End are situated to the south, and Acomb, Poppleton and Clifton Ings to the north.
1.3The purpose of the proposals is to construct a new Water Treatment Works to meet current drinking water standards. The proposals would consist of a new treatment plant building and associated access road, a high voltage sub-station building and a pump control panel kiosk, all of which would be situated within the existing flood protection wall.
1.4In addition it is proposed to install new underground intake pipes by river Ouse. These operational development fall outside the consideration of this planning application as by virtue of part (g), Class E, Part 17, Schedule 2 of the Town and Country Planning (General Permitted Development) Order 1995, the proposed intake pipes do not require planning permission.
1.5To reduce its scale and visual impact and to break up its overall massing the main water treatment plant as shown on the revised plans would consist of differential ridge heights which is reflected by its roof design. Whilst its maximum height of 11.55m would remain (as measured from the lowest ground level) the pitched roof which covers a large part of the building would reduce its overall height to 7.45m. The twin
Application Reference Number: 10/02519/FULM Item No: 5b Page 1 of 12 steel silos adjacent would measure 13.6m high. The gross floor area of the building would remain unchanged (51.3m x 46.7m max).
1.6The sub-station brick building to the west of the proposed water treatment works would measure 8.75m x 8.55m with an overall height of 3.7m, and the proposed pump control panel kiosk to the south of the treatment works would be a 2.5m high ‘Holly Green’ fibreglass structure. It would measure 3.65m x 9.15m.
1.7The proposed treatment plant building would be partially situated above a disused slow sand filter. Prior to construction the abandoned slow sand filter will be filled by spoil imported from outside the treatment works site.
1.8Existing access arrangements and car park would remain unchanged.
RELEVANT PLANNING HISTORY:
1.9Acomb Landing Water Treatment Works has been the subject of a number of planning applications, none of which are directly related to the development proposals.
2.0POLICY CONTEXT
2.1Development Plan Allocation:
City Boundary GMS Constraints: York City Boundary 0001
DC Area Teams GMS Constraints: West Area 0004
York North West Boundary GMS Constraints: York North West Boundary CONF
2.2Policies:
CYSP3 Safeguarding the Historic Character and Setting of York
CYGP1 Design
CYNE2 Rivers and Stream Corridors, Ponds and Wetland Habitats
CYGP15 Protection from flooding
CYNE6 Species protected by law
CYNE7 Habitat protection and creation
3.0CONSULTATIONS
EXTERNAL
Neighbours
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow West & City Centre Area Planning Sub-Committee at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.