Monkgate Roundabout Cycle/Pedestrian Safety Scheme

Approved Executive 3 papers

Decision Session - Executive Member for Transport - Expired approved this item on Thursday 13 October 2016. Below is the council's own wording, with the papers it was decided on.

Item35

Resolved

( i ) That the scheme be approved as shown in Annex A to the Officer’s report. (ii) That authority be delegated to the Director for City and Environmental Services to investigate the feasibility of the installation of additional signs for cyclists. Reason: To improve facilities for cyclists and pedestrians and to reduce the number of accidents involving cyclists. ( i ) That the scheme be approved as shown in Annex A to the Officer’s report. (ii) That the decision to install signs to inform cyclists of dropped kerbs on the junction be delegated to the Director of City and Environmental Services. Reason: To improve facilities for cyclists and pedestrians and to reduce the number of accidents involving cyclists.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Decision Session - Executive Member for Transport - Expired, 6 pages

Decision Session – Executive Member for 13 October 2016 Transport and Planning

Report of the Corporate Director - Place

Monkgate Roundabout Cycle / Pedestrian Safety Scheme

Summary 1. This report updates the Executive Member on work undertaken to develop the previously agreed option to reduce the number of accidents at Monkgate Roundabout, and includes the results of consultation. The report also seeks approval of a recommended layout for construction. Recommendations

2. The Executive Member is asked to approve the scheme shown in Annex A:

Reason: To improve facilities for cyclists and pedestrians and to reduce the number of accidents involving cyclists. Background

3. A feasibility report was presented to the Director Decision Session on 2 December 2014. The study had considered various options to reduce the number of collisions involving cyclists and to improve conditions for pedestrians at the Monkgate roundabout. These measures were wide in their degree of complexity, ranging from simple solutions such as creating two circulatory lanes on the roundabout, to amending the shape of the central island, to signalising the junction. The Director was asked to approve the progression of a combination of the proposed measures, outlined below and shown in Annexes B and F of the study report, through detailed design and implementation as part of the Local Safety Scheme programme. 4. The measures aim to reduce the number of traffic lanes onto the roundabout from Huntington Road from three to two (reducing the conflicts by 50%), and to provide an off-road cycle facility on Huntington Road to enable safer access to existing facilities on Foss Bank and Monkgate.

5. When Officers began consultation on the proposals, it became clear that there would be a number of difficult issues to resolve. Firstly, the telephone call box at the southern end of Huntington Road would need to be removed and the estimated cost from British Telecom (BT) was £2200.

6. Secondly, widening the footway on Huntington Road and Heworth Green away from the carriageway would require a supporting structure to retain the footway, as the difference in level between it and the adjacent river-side grassed area increases towards the bridge. This would involve considerable expense.

7. In addition to this, the Environment Agency requested information to show that there would be no nett loss of storage area in the flood plain. Any reduction of storage within the flood plain would require compensatory storage to be provided on site or in a location hydraulically linked. This requirement would be very difficult to provide.

8. In light of these considerations, Officers concluded that the measures to improve the off-road facilities should be modified. The proposed amendments also reflect feedback through internal consultation. The revised proposals are shown in Annex A and are described below:

 The shared use path on the eastern footway of Huntington Road has been shortened. This will still enable cyclists to leave the carriageway prior to the roundabout and access the existing off-road facilities on Heworth Green, Foss Bank and Monkgate. A cycle lane has been included on-road to provide a continuous lane that joins up with the existing cycle lane on Heworth Green.

 The proposed lane markings on Huntington Road have been amended to better reflect the numbers of vehicles using the junction from that approach. Hence the left hand lane would be reserved for straight ahead and left turning vehicles, while the right hand lane would be intended for right turning vehicles, particularly those heading for Monkgate.

 A central cycle lane for right turning cyclists has been added to cater for confident cyclists who would not want to follow the alternative, off-road route around the outside of the roundabout.

 Officers are also proposing modifications to both traffic islands to assist cyclists and pedestrians to cross Huntington Road and Heworth Green more safely.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Drawing no TP/DEC 130041/21.Appendix A 1 pages Download
PDF
Monkgate Roundabout ALL Consultation ResponsesAppendix B 1 pages Withheld: personal details
PDF
Monkgate Roundabout Cycle/Pedestrian Safety SchemeReport 6 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

1 of 1 attended
IG
Councillor Ian GilliesCommittee Member, present

More from York Decision Session - Executive Member for Transport - Expired

All decisions
MeetingDecisionOutcome
21 Mar 2023 Acomb Road Safety Updatei. That the council promote and relaunch the existing campaign to recruit a school crossing patroller on Acomb Road; ... Noted Open
21 Mar 2023 Active Travel Programme Updatei. Noted the update on the progress of the Active Travel Programme contained within this report; Reason: To provide i... Noted Open
21 Mar 2023 Active Travel Programme – Hospital Fields Road Schemei. Approved the advertisement of amendments to the Traffic Regulation Order (TRO) to implement the parking restrictio... Approved Open
21 Mar 2023 Resident Parking (Recommendations from Scrutiny)i. Noted the response to the scrutiny recommendations detailed within paragraph 25 of this report; ii. Noted that the... Noted Open
14 Mar 2023 Exclusion of Press and PublicThat the press and public be excluded from the meeting during the consideration of annexes D and E for Agenda Items 5... Decided Open