That the application be approved Reason: Planning permission is granted on a temporary basis to allow the Phase 2 East Coast Main Line Power Supply Upgrade Programme to be implemented. Surrounding neighbouring users are commercial and industrial in nature and the proposed office use is therefore compatible with the locality. The location of the development will take advantage of sustainable transport modes and the proposal is considered to accord with national guidance in the NPPF and Draft Development Control Local Plan Policies for a temporary period of 5 years.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 4 October 2018 Ward: Holgate Team: Major and Parish: Holgate Planning Panel Commercial Team
Reference: 18/01685/FULM Application at: Land Adjacent To Cinder Lane Holgate York For: Siting of 2 storey modular buildings to accommodate office use for a 5 year temporary period together with associated works to support the implementation of rail infrastructure project. By: Network Rail (infrastructure) Ltd Application Type: Major Full Application (13 weeks) Target Date: 8 November 2018 Recommendation: Approve
1.0PROPOSAL
1.1The application site is an area of Network Rail operational land located to the north west of York Railway Station. The site is located to the south of Network Rail's Maintenance Delivery Unit (MDU) and between the Railway Depot and other operational land used for various railway activities. It is positioned on a bend adjacent to Cinder Lane. Main vehicular access is from Leeman Road, adjacent to the National Railway Museum and the entrance to the Railway Depot to the north. Cinder Lane running along the southern boundary of the site provides a public cycle and pedestrian route, leading to a pedestrian bridge to Wilton Rise and the Holgate area of the City. The site is relatively flat, containing a number of old sidings and is currently vacant.
1.2This area of land is allocated as part of the York Central site for which outline consent for the redevelopment of this area for mixed use development has been submitted. It is anticipated that this particular part of the York Central wider site will be developed in the later stages of the allocation and the proposed office use sought under this application will have ceased before the land is required.
1.3Planning permission is sought for the siting of a temporary modular building for office accommodation (Class B1). This includes associated work including a security hut, lighting, fencing and associated car parking (including electric charging points) and cycle parking.
1.4The office building is sought to provide office accommodation to facilitate Phase 2 of the East Coast Main line Power Supply Upgrade Programme, which is delivered by REAL Alliance comprising of 6 integrated organisations. The delivery of this project is expected to be undertaken between 3 and 5 years. There will be up to 170 staff Application Reference Number: 18/01685/FULM Page 1 of 15 occupying the building. Planning permission is sought on the basis of a temporary consent, inline with the programme delivery.
1.5The building containing a number of modular units constructed together would measure approximately 66m x 12m with a forward projecting section measuring 15m x 12m on the southern elevation. It would be two storeys high. Approximately 1954sqm of gross internal floorspace shall be provided.
1.6The site lies within the Central Area of Archaeological Importance and is within Flood zone 1. It is noted that the application site lies outside any Conservation Area. The nearest listed buildings are the Network Rail Maintenance Delivery Unit and National Railway Museum (Annexe) but these are some distance from the proposed building location.
2.0POLICY CONTEXT
DEVELOPMENT CONTROL LOCAL PLAN (DCLP) 2005
2.1The policies that are relevant to matters raised by this application include:
YC1 York Central Action Area GP1 Design GP4a Sustainability GP4b Air Quality GP15a Development and flood risk HE10 Archaeology GP6 Contaminated Land T4 Cycle Parking Standards GP23 Temporary Planning Permission
PUBLICATION DRAFT YORK LOCAL PLAN 2018
2.2The main draft policies that are relevant to matters raised by this application are:
DP1 York Sub Area DP2 Sustainable Development DP3 Sustainable Communities SS1 Delivering Sustainable Growth for York SS4 York Central EC1 Provision of Employment Land D1 Placemaking D6 Archaeology ENV1 Air Quality ENV3 Land Contamination ENV4 Flood Risk Application Reference Number: 18/01685/FULM Page 2 of 15 T1 Sustainable Access T3 York Railway Station and Associated Operational Facilities
3.0CONSULTATIONS
INTERNAL
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.