Junction Alterations – Bishopthorpe Road / Scarcroft Road

Approved Executive 5 papers

Decision Session - Executive Member for Transport - Expired approved this item on Thursday 25 July 2019. Below is the council's own wording, with the papers it was decided on.

Item11

Resolved

( i ) That Option 3 be approved, as set out in paragraphs 57 to 64 of the report. Reasons: a) To achieve the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically. b) To provide further benefits for users by introducing a new pedestrian crossing, an addition generally supported by the consultees and local user groups. (ii) That officers note the suggestions made in respect of this item under Public Participation for consideration as part of the detailed design of the scheme. Reason: To ensure that proper consideration is given to the feasibility of including further improvements within the scheme. ( i ) That Option 3 be approved, as set out in paragraphs 57 to 64 of the report. Reasons: a) To achieve the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically. b) To provide further benefits for users by introducing a new pedestrian crossing, an addition generally supported by the consultees and local user groups. (ii) That officers note the suggestions made in respect of this item under Public Participation for consideration as part of the detailed design of the scheme. Reason: To ensure that proper consideration is given to the feasibility of including further improvements within the scheme.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Decision Session - Executive Member for Transport - Expired, 14 pages

Summary

1. The traffic signalling equipment at this junction is life expired and has become difficult and costly to maintain, it needs to be replaced.

2. The TSAR (Traffic Signal Asset Renewal) programme is the means by which life expired traffic signal assets across the city are refurbished.

3. Although the programme is primarily about asset renewal, there is scope to take advantage of ‘easy wins’ whilst refurbishing the equipment. To that end, junction alterations have been proposed that offer an improvement.

4. A decision is required to approve the proposed junction alterations.

Recommendations

5. The Executive Member is asked to approve Option 3.

Reasons: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically.

This option also includes the introduction of an additional pedestrian crossing which provides further benefits for users. This addition is generally supported by the consultees and local user groups. Background

6. A report was brought to the Executive Member for Transport and Planning on 12 November 2015 to seek approval to undertake the 5-year ‘TSAR’ (Traffic Signal Asset Renewal) programme.

7. This programme entails a replacement of life expired traffic signal assets around York. The focus is on replacing equipment that is liable to imminent failure, rather than seeking to improve congestion or achieve a similar transport improvement goal. However, where ‘easy wins’ can be achieved at the same time as replacing obsolete equipment, these will be taken advantage of.

8. To date, 20 sets of signals have been refurbished and a further 10 are programmed in for the 19/20 financial year.

Consultation

9. Although the purpose of the project is simply to replace life-expired equipment, which would require no consultation, a much wider consultation has been carried out to address the input and involvement from the Bishopthorpe Road Traders Association and other groups.

10. A summary of the consultation feedback can be found in Annex A.

11. Local Ward Councillors were consulted again following recent local elections.

12. The most favoured option was Option 3.

Options

13. The following options are available:

14. Option 1 – Approve the proposed junction layout shown in drawing Annex B

15. Option 2 – Approve the proposed junction layout shown in drawing Annex C

16. Option 3 – Approve the proposed junction layout shown in drawing Annex D

17. Option 4 – Do not approve any of the presented options Analysis

Option 1

Description of changes

18. A full replacement of all traffic signalling technology, including signal heads, poles, cabling, cabinets, detectors, communications and ducting.

19. The removal of the left turn lane on the southern arm of Bishopthorpe Road, to be replaced with a widened footpath and introduction of a short length of cycle lane and ASL.

Reasoning

20. Option 1 involves the fewest changes from the existing layout and is the cheapest option to construct. The estimated cost of this option is £90,000.

21. Replacement of the traffic signal technology is the fundamental purpose of this project, as per Section 2.

22. All presented options include the removal of the left turn lane on the southern arm of Bishopthorpe Road, to be replaced with a widened footpath and short length of cycle lane and ASL.

23. This is one of the ‘easy wins’ that the design team have identified due to the fact that the capacity of the junction can remain unaffected by the removal of this lane.

Impact on vehicular traffic

24. This option has a negligible impact upon the capacity of the junction and the journey times of vehicles travelling through it.

25. The introduction of a short length of cycle lane and an ASL is a minor improvement for cyclists.

Impact on pedestrians

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Stakeholder Consultation ResponseAppendix A 4 pages Withheld: personal details
PDF
YK2235-OP 1Appendix B 1 pages Download
PDF
YK2235-OP 2Appendix C 1 pages Download
PDF
YK2235-OP 3Appendix D 1 pages Download
PDF
Junction Alterations: Bishopthorpe Road / Scarcroft RoadReport 14 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at York

Search all
  1. Junction Alterations – Bishopthorpe Road / Scarcroft RoadThis decision
  2. TSAR Junction Alterations – Gillygate/Bootham/St Leonards PlaceDeferred
  3. Junction Alterations - Monkgate BarApproved
  4. Junction Alterations – Lendal Arch GyratoryApproved
  5. Traffic Signal Asset Renewal (TSAR) - Junction AlterationsApproved

More from York Decision Session - Executive Member for Transport - Expired

All decisions
MeetingDecisionOutcome
21 Mar 2023 Acomb Road Safety Updatei. That the council promote and relaunch the existing campaign to recruit a school crossing patroller on Acomb Road; ... Noted Open
21 Mar 2023 Active Travel Programme Updatei. Noted the update on the progress of the Active Travel Programme contained within this report; Reason: To provide i... Noted Open
21 Mar 2023 Active Travel Programme – Hospital Fields Road Schemei. Approved the advertisement of amendments to the Traffic Regulation Order (TRO) to implement the parking restrictio... Approved Open
21 Mar 2023 Resident Parking (Recommendations from Scrutiny)i. Noted the response to the scrutiny recommendations detailed within paragraph 25 of this report; ii. Noted that the... Noted Open
14 Mar 2023 Exclusion of Press and PublicThat the press and public be excluded from the meeting during the consideration of annexes D and E for Agenda Items 5... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies