( i ) That Option 3 be approved, as set out in paragraphs 57 to 64 of the report. Reasons: a) To achieve the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically. b) To provide further benefits for users by introducing a new pedestrian crossing, an addition generally supported by the consultees and local user groups. (ii) That officers note the suggestions made in respect of this item under Public Participation for consideration as part of the detailed design of the scheme. Reason: To ensure that proper consideration is given to the feasibility of including further improvements within the scheme. ( i ) That Option 3 be approved, as set out in paragraphs 57 to 64 of the report. Reasons: a) To achieve the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically. b) To provide further benefits for users by introducing a new pedestrian crossing, an addition generally supported by the consultees and local user groups. (ii) That officers note the suggestions made in respect of this item under Public Participation for consideration as part of the detailed design of the scheme. Reason: To ensure that proper consideration is given to the feasibility of including further improvements within the scheme.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to Decision Session - Executive Member for Transport - Expired, 14 pages
Summary
1. The traffic signalling equipment at this junction is life expired and has become difficult and costly to maintain, it needs to be replaced.
2. The TSAR (Traffic Signal Asset Renewal) programme is the means by which life expired traffic signal assets across the city are refurbished.
3. Although the programme is primarily about asset renewal, there is scope to take advantage of ‘easy wins’ whilst refurbishing the equipment. To that end, junction alterations have been proposed that offer an improvement.
4. A decision is required to approve the proposed junction alterations.
Recommendations
5. The Executive Member is asked to approve Option 3.
Reasons: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically.
This option also includes the introduction of an additional pedestrian crossing which provides further benefits for users. This addition is generally supported by the consultees and local user groups. Background
6. A report was brought to the Executive Member for Transport and Planning on 12 November 2015 to seek approval to undertake the 5-year ‘TSAR’ (Traffic Signal Asset Renewal) programme.
7. This programme entails a replacement of life expired traffic signal assets around York. The focus is on replacing equipment that is liable to imminent failure, rather than seeking to improve congestion or achieve a similar transport improvement goal. However, where ‘easy wins’ can be achieved at the same time as replacing obsolete equipment, these will be taken advantage of.
8. To date, 20 sets of signals have been refurbished and a further 10 are programmed in for the 19/20 financial year.
Consultation
9. Although the purpose of the project is simply to replace life-expired equipment, which would require no consultation, a much wider consultation has been carried out to address the input and involvement from the Bishopthorpe Road Traders Association and other groups.
10. A summary of the consultation feedback can be found in Annex A.
11. Local Ward Councillors were consulted again following recent local elections.
12. The most favoured option was Option 3.
Options
13. The following options are available:
14. Option 1 – Approve the proposed junction layout shown in drawing Annex B
15. Option 2 – Approve the proposed junction layout shown in drawing Annex C
16. Option 3 – Approve the proposed junction layout shown in drawing Annex D
17. Option 4 – Do not approve any of the presented options Analysis
Option 1
Description of changes
18. A full replacement of all traffic signalling technology, including signal heads, poles, cabling, cabinets, detectors, communications and ducting.
19. The removal of the left turn lane on the southern arm of Bishopthorpe Road, to be replaced with a widened footpath and introduction of a short length of cycle lane and ASL.
Reasoning
20. Option 1 involves the fewest changes from the existing layout and is the cheapest option to construct. The estimated cost of this option is £90,000.
21. Replacement of the traffic signal technology is the fundamental purpose of this project, as per Section 2.
22. All presented options include the removal of the left turn lane on the southern arm of Bishopthorpe Road, to be replaced with a widened footpath and short length of cycle lane and ASL.
23. This is one of the ‘easy wins’ that the design team have identified due to the fact that the capacity of the junction can remain unaffected by the removal of this lane.
Impact on vehicular traffic
24. This option has a negligible impact upon the capacity of the junction and the journey times of vehicles travelling through it.
25. The introduction of a short length of cycle lane and an ASL is a minor improvement for cyclists.
Impact on pedestrians
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Decision Session - Executive Member for Transport - Expired at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.