Resolved
(i) That a firm set of designs be drawn up to achieve road closure Layout Option 1 shown in Annex C put forward by the consultants. Reason: to confirm the ability / practicality to take these measures forward (ii) Approval in Principle for the implementation of an Experimental Traffic Regulation Order (TRO) in line with Layout Option 1 be granted subject to the outcome of detailed design, with approval of the detail of the implementation delegated to the Assistant Director Transport, Highways and Environment after consultation with the Executive Member and Ward Members. Reason: Because although the modelling indicates the impact on the surrounding road network is potentially acceptable there is the possibility that actual driver behaviour will have a greater impact than anticipated not only on the immediate road network but also on the local residents the scheme is designed to benefit. (iii) That an Experimental TRO be implemented to merge the existing Residents parking zones in the area when the road closures are taken forward. Reason: Because the proposed changes to the vehicle routes in the area do not fit with the existing residents parking zone boundaries and this will likely have an impact on how and where residents choose to park. (iv) That the Experimental TRO does not commence until the planned roadworks have been completed in the Lord Mayor’s Walk area. Reason: Because the experiment needs to be conducted at a time when road and traffic conditions are not impacted by temporary circumstances. (v) That authority be delegated to the Assistant Director Transport, Highways and Environment in consultation with the Executive Member for Transport and Ward Members to approve any amendment to the Experimental TRO considered desirable during the course of the experiment, including suspension or ending of the Experimental TRO. Reason: Because this allows the greatest level of flexibility to respond to unexpected issues in a timely manner.