Haxby Road, New Earswick – Triple Cushion Replacement Trial
ApprovedExecutive4 papers
Decision Session - Executive Member for Transport - Expired approved this item on Monday 18 January 2021. Below is the council's own wording, with the papers it was decided on.
i. Approved the suggested amendments in Option 3 and as shown in Annex B, which is to make the trial measures permanent with minor changes. Reason: To improve on the existing layout and allay some safety concerns about the southbound direction. There could also be minor reductions in noise and vibration nuisance to residents. i. Approved the suggested amendments in Option 3 and as shown in Annex B, which is to make the trial measures permanent with minor changes. Reason: To improve on the existing layout and allay some safety concerns about the southbound direction. There could also be minor reductions in noise and vibration nuisance to residents.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to Decision Session - Executive Member for Transport - Expired
Summary
1. This report advises on the results and evaluation of a trial road layout on Haxby Road, New Earswick, and offers recommendations for concluding the trial and completing the scheme.
Recommendations
2. The Executive Member is asked to consider the feedback received from various interested parties and approve the suggested amendments in Option 3 and as shown in Annex B, which is to make the trial measures permanent with minor changes:
Reason: To improve on the existing layout and allay some safety concerns about the southbound direction. There could also be minor reductions in noise and vibration nuisance to residents.
Background
3. This section of Haxby Road is in a 20mph school safety zone. Prior to the trial, the traffic calming measures comprised two sets of triple speed cushions which had been installed at different times, the first over 20 years ago as part of the original school safety zone, the second in 2015 as part of the Haxby to Clifton Moor cycle route scheme which saw the 20mph zone extended to include a full width speed table cycle crossing just south of the Outer Ring Road. The carriageway width lends itself to a triple speed cushion arrangement, but in order to provide safe gaps between the cushions, the cushions had to be installed off-centre in the traffic lanes.
4. Council officers have received complaints from members of the public about the potential danger to cyclists from drivers veering into the advisory cycle lanes to negotiate the outer cushions. These complaints have included reports of near-misses and non-injury collisions between vehicles and cyclists. Officers have also received complaints from residents living in the properties adjacent to the measures about vibration and, in one case, alleged damage to their property as a result of vehicles passing over the cushions.
5. In an attempt to tackle these issues, proposals for trial road layouts were discussed and presented in a Decision Session report in May 2017. Following further design work, the two sets of triple speed cushions were removed in late November 2019, and in January 2020 a new arrangement was introduced just south of Haxby Road Farm with a pair of cushions and the northbound cycle lane protected by delineators with “wands” as shown in Annex A.
6. The trial was originally intended to last six months, however, this was extended to nine months to allow for a period of abnormal traffic conditions experienced during the first Covid19 lockdown.
7. There have been no recorded injury accidents at either set of cushions, before or after the recent changes.
8. Vehicle speed surveys have been undertaken before and after implementation of the scheme. As the northern set of triple speed cushions was removed and not replaced, it was expected that vehicle speeds would increase. However, recent speed surveys show a reduction in mean speeds of 3mph to 18mph southbound and 20mph northbound near the trial road layout. There has also been a slight speed reduction north of this but this could be due to the before and after surveys not being undertaken in exactly the same place. Here, there are mean speeds of 23mph southbound and 22mph northbound. Traffic volumes currently average around 8,500 vehicles from 7am to 7pm each day. This demonstrates that the measures are effective as mean speeds at the measures are within the speed limit.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Decision Session - Executive Member for Transport - Expired at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.