KINLOCH ROAD REGENERATION - UPDATE ON THE IMPACT OF EXTENDING THE PUBLIC REALM SCOPE TO INCORPORATE HALL STREET

Decided Committee 1 paper

Campbeltown CHORD Project Board decided this item on Wednesday 13 April 2011. Below is the council's own wording, with the papers it was decided on.

Item6

Resolved

Decision The Motion was carried by 3 votes to 2 and the Board resolved accordingly. The Chair said that it would be appropriate to invite Roads and Amenity Services to a meeting to discuss the installation of the railings. (Ref: A report by Robert Pollock, dated 5 April 2011, submitted).
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Campbeltown CHORD Project Board

Summary

1.1This paper outlines the findings thus far in assessing the requirements involved in extending the scope of public realm being provided by the Kinloch Road Regeneration (KRR) project to include Hall Street and specifically the waterfront railings.

Recommendations

2.1That the Campbeltown CHORD Project Board note the costs involved in extending the public realm scope of KRR to include Hall Street and note that the high costs involved are not considered to add value for money in delivering on the agreed KRR objectives;

2.2That the Board note that progressing Hall Street would have a detrimental effect on the remainder of the KRR project.

2.3That the Board agree that the scope of the public realm should not include Hall Street but rather return to the previously agreed scope, i.e. the new road, Kinloch Road down to the Royal Hotel and Lochend street between Kinloch Road and Millknowe.

3. DETAIL

3.1At the Project Board Meeting 10 December 2010, it was agreed to extend the scope of the KRR public realm to consider the Hall Street area. Previously, the scope covered the new road, Lochend Street and Kinloch Road as far towards the quayside as the Royal Hotel.

3.2This was done to:

• seek to assist with the THI monies available for public realm (£100,000) which are not yet allocated due to a lack of suitable projects to which the THI money can be contributed1; and • to assist with the installation of new railings which have been purchased.

3.3The agreed budget for public realm works as part of the KRR project is £1.25 million. This was to remain unchanged by the extended scope.

3.4Railings have been purchased to replace those currently in place between Old Quay and New Quay in Campbeltown. The figures below show the existing railings and footway surfacing.

1 THI public realm money can only be used to fund the difference between standard materials and those more suited for use in a conservation area. Existing railings between New Quay and Old Quay

3.5The existing concrete posts appear to be cast within the concrete slab of the footpath and the central reinforcing bar which will be within the post may also be fixed into the top of the masonry wall.

3.6New railings would require to be fixed into something sound and the removal of the existing railings will most likely damage the concrete slab of the footpath. This presents an opportunity to renew the surface materials in this area, tying in with the Kinloch Road Public Realm Improvements and the THI work.

3.7New railings have been purchased and are currently in storage at the new roads depot. The figures below show these. 200m of railings are in storage which should be sufficient to replace the full length between Old Quay and New Quay.

New railings currently in storage at Machrihanish Roads Depot

3.8Following the Board meeting in December the following has taken place:

• Consultation with Audrey Martin and James Lafferty to discuss the use of the THI monies, agree the physical scope of the work; and agree consultees; • Consultation with Alison Younger and Julian Green regarding any money available from the Area Committee receipts; • Consultation with Arthur McCulloch to determine what had been included for within the marine works budget in relation to the waterfront railings; • Preparation of a sketch showing the current position, possible improvements and a cost estimate on this basis

3.9The outcome of the consultations has demonstrated that there is no funding available at present for the installation of the railings and that the KRR budget would have to pay for all works, minus the ‘top up’ that the THI could provide.

3.10This exercise has quickly shown that resurfacing the footpath alongside the railings would be the most significant sum of money with an estimate of:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
KINLOCH ROAD REGENERATION: UPDATE ON THE IMPACT OF EXTENDING THE PUBLIC REALM SCOPE TO INCORPORATE HALL STREETReport 1.6 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

4 of 9 attended
NB
Neil BrownOfficer, expected
RC
Councillor Rory ColvilleMember, present
AH
Councillor Anne HornMember, apologies
DK
Councillor Donald KellyMember, present
AM
Aileen MacLennanOfficer, expected
RP
Robert PollockOfficer, present
JS
Councillor John SempleMember, present
BW
Bruce WestOfficer, expected
AY
Alison YoungerOfficer, expected

On this subject at Argyll and Bute

Search all
  1. KINLOCH ROAD REGENERATION - UPDATE ON THE IMPACT OF EXTENDING THE PUBLIC REALM SCOPE TO INCORPORATE HALL STREETThis decision
  2. Kinloch road regeneration public realm - position statement (agenda item 4)Agreed
  3. Argyll community housing association: erection of 30 residential units (comprising 2 semi detached dwellinghouses and 28 flats over 4 blocks) with associated access road, parking and communal garden areas: development site, mccallum street and kinloch road and longrow, campbeltown (ref: 10/02153/pp)Agreed
  4. Highlight progress report - kinloch road regenerationAgreed
  5. Campbeltown chord - kinloch road regeneration project - acha fundingApproved
  6. Campbeltown chord - kinloch road regeneration project - drawdown of next phase of capital funding (public realm)Approved

More from Argyll and Bute Campbeltown CHORD Project Board

All decisions
MeetingDecisionOutcome
7 Mar 2013 Kinloch road regeneration public realm - position statement (agenda item 4)Decision Members agreed to note the report and asked that clarification be provided by email to Members by the CHORD ... Agreed Open
7 Mar 2013 Campbeltown budget position statement (agenda item 5)Decision Members agreed to note the report. (Reference: Report by Head of Economic Development and Strategic Transpor... Agreed Open
7 Mar 2013 Campbeltown berthing facility - highlight / progress report (agenda item 6)Decision Members agreed 1. To note the report. 2. That a proper plan needs to be developed to improve the fishermen’s... Agreed Open
13 Apr 2011 Highlight progress report - campbeltown thiThe Board agreed to note the report. (Ref: A report by Audrey Martin, dated 6 April 2011, submitted). Agreed Open
13 Apr 2011 Highlight progress report - kinloch road regenerationThe Board agreed to note the report. (Ref: A report by Joanne Casey, dated 4 April, 2011, submitted). Agreed Open