Decision The Motion was carried by 3 votes to 2 and the Board resolved accordingly. The Chair said that it would be appropriate to invite Roads and Amenity Services to a meeting to discuss the installation of the railings. (Ref: A report by Robert Pollock, dated 5 April 2011, submitted).
Word for word from the decision Argyll and Bute published for this meeting.Source: www.argyll-bute.gov.uk
1.1This paper outlines the findings thus far in assessing the requirements involved in extending the scope of public realm being provided by the Kinloch Road Regeneration (KRR) project to include Hall Street and specifically the waterfront railings.
Recommendations
2.1That the Campbeltown CHORD Project Board note the costs involved in extending the public realm scope of KRR to include Hall Street and note that the high costs involved are not considered to add value for money in delivering on the agreed KRR objectives;
2.2That the Board note that progressing Hall Street would have a detrimental effect on the remainder of the KRR project.
2.3That the Board agree that the scope of the public realm should not include Hall Street but rather return to the previously agreed scope, i.e. the new road, Kinloch Road down to the Royal Hotel and Lochend street between Kinloch Road and Millknowe.
3. DETAIL
3.1At the Project Board Meeting 10 December 2010, it was agreed to extend the scope of the KRR public realm to consider the Hall Street area. Previously, the scope covered the new road, Lochend Street and Kinloch Road as far towards the quayside as the Royal Hotel.
3.2This was done to:
• seek to assist with the THI monies available for public realm (£100,000) which are not yet allocated due to a lack of suitable projects to which the THI money can be contributed1; and • to assist with the installation of new railings which have been purchased.
3.3The agreed budget for public realm works as part of the KRR project is £1.25 million. This was to remain unchanged by the extended scope.
3.4Railings have been purchased to replace those currently in place between Old Quay and New Quay in Campbeltown. The figures below show the existing railings and footway surfacing.
1 THI public realm money can only be used to fund the difference between standard materials and those more suited for use in a conservation area. Existing railings between New Quay and Old Quay
3.5The existing concrete posts appear to be cast within the concrete slab of the footpath and the central reinforcing bar which will be within the post may also be fixed into the top of the masonry wall.
3.6New railings would require to be fixed into something sound and the removal of the existing railings will most likely damage the concrete slab of the footpath. This presents an opportunity to renew the surface materials in this area, tying in with the Kinloch Road Public Realm Improvements and the THI work.
3.7New railings have been purchased and are currently in storage at the new roads depot. The figures below show these. 200m of railings are in storage which should be sufficient to replace the full length between Old Quay and New Quay.
New railings currently in storage at Machrihanish Roads Depot
3.8Following the Board meeting in December the following has taken place:
• Consultation with Audrey Martin and James Lafferty to discuss the use of the THI monies, agree the physical scope of the work; and agree consultees; • Consultation with Alison Younger and Julian Green regarding any money available from the Area Committee receipts; • Consultation with Arthur McCulloch to determine what had been included for within the marine works budget in relation to the waterfront railings; • Preparation of a sketch showing the current position, possible improvements and a cost estimate on this basis
3.9The outcome of the consultations has demonstrated that there is no funding available at present for the installation of the railings and that the KRR budget would have to pay for all works, minus the ‘top up’ that the THI could provide.
3.10This exercise has quickly shown that resurfacing the footpath alongside the railings would be the most significant sum of money with an estimate of:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.