Resolved
Decision The Short Life Working Group noted the report. (Reference: Report by Head of Roads and Amenity Services dated 28 February 2013, submitted)
SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY noted this item on Monday 11 March 2013. Below is the council's own wording, with the papers it was decided on.
Resolved
Decision The Short Life Working Group noted the report. (Reference: Report by Head of Roads and Amenity Services dated 28 February 2013, submitted)
B&C (Standstill Budget) B&C 2013/14 Asset:- % of Asset Management Plan Target Quantity Inventory Quantity Comments Proposed Works that can be (from Asset Funding Activity Unit Budget Quantity delivered Target Unit Rate Management Plan) Capital 0101 Reconstruction sq.m £ 543,000.00 30071.23 77.68% £ 18.06 38712.26 1,973,470.00 0201 Resurfacing sq.m £ 329,000.00 15168.92 40.31% £ 21.69 37626.14 1,973,470.00 0301 Anti Skid Treatment £ - 0401 Surface Dressing sq.m £ 301,000.00 82596.65 66.69% £ 3.64 123857.73 1,973,470.00 0501 Patching (capital) sq.m £ 80,000.00 2622.95 13.29% £ 30.50 19734.70 1,973,470.00 1001 Footways Resurfacing (capital) sq.m £ 30,000.00 1633.10 65.91% £ 18.37 2477.87 166,799.84 R10 0501 Patching sq.m £ 385,713.90 12646.36 64.08% £ 30.50 19734.70 1,973,470.00 0502 Potholing £ 91,745.52 - cu.m/y - 0629 Road Master ear £ 149,500.00 0701 Bridges £ 51,750.00 - 0801 Cattle Grids £ 6,900.00 - 1402 Drainage Ditches
1001 Footways Resurfacing sq.m £ 6,371.22 346.83 14.00% £ 18.37 2477.87 166,799.84 1401 Drainage Culverts no. £ 25,484.87 654.30 34.09% £ 38.95 1919.33 3,384.00 1402 Drainage Ditches £ 91,745.52 1402 Ditching lin.m £ 59,873.12 33636.59 44.11% £ 1.78 76250.42 298,972.00 1402 French Drain Inspect & Jetting lin.m £ 2,614.75 1494.14 44.10% £ 1.75 3387.97 14,190.00 1402 French Drain Replace Filter Asset measured in lin.m but cu.m 14,190.00 Material £ 14,449.92 149.52 44.13% £ 96.64 338.80 costed per cu.m 1402 Drainage Pipework Inspect & lin.m 3,087.00 Jetting £ 532.12 313.01 44.42% £ 1.70 704.65 1402 Offlets no. £ 14,275.60 5511.82 44.13% £ 2.59 12490.00 12,490.00 1501 Grasscutting £ 66,260.65 Grasscuttin
Total includes for 2 swathes, 1501 Cut Verges lin.m 2,563,620.00 2 cuts per year 1501
£ 58,978.60 1798128.20 69.16% £ 0.03 2599912.33 g
This is the base area, however, 1501 Amenity Cut sq.m 36,017.00 £ 7,282.05 298811.88 69.14% £ 0.02 432204.00 this is cut 12 times per year 1503 Weedkilling £ 30,972.79 Weedkilling
1503 Weedkilling French Drains lin.m 3,675.00 1503
£ 160.29 1282.32 100.00% £ 0.13 1282.33
1503 Weedkilling Urban lin.m 346,500.00 £ 30,812.50 246500.00 100.00% £ 0.13 246500.00 1601 Scrub / Tree Maintenance £ 35,678.81 1701 Road Markings (HELD CENTRALLY) £ 28,114.65 1701 Centrelines lin.m £ 13,111.08 24279.78 100.00% £ 0.54 24279.79 126,494.00 Marking Road 1701
1701 Edge Lines lin.m £ 8,740.79 16186.65 100.00% £ 0.54 16186.64 84,330.00 s
1701 Junction Marks each £ 1,101.49 32.71 100.00% £ 33.67 32.71 247.00 1701 Yellow Lines lin.m £ 5,161.29 9384.16 100.00% £ 0.55 9384.17 81,066.00 Gullies are emptied 3 times in 2 years, the asset figure 4,385.00 should be multiplied by 1.5 for 1801 Gully Emptying (HELD true figure treated per year CENTRALLY) no. £ 47,408.00 6043.86 91.89% £ 7.84 6577.50 2301 Traffic Signs £ 11,415.77 2302 Traffic
2301 Check & Inspect no. 1,035.00 Signs
£ 1,749.15 1035.00 100.00% £ 1.69 1035.00
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Bute and CowalReport | 60 KB | DownloadRead as text |
PDF |
Helensburgh and LomondReport | 58 KB | Download |
PDF |
MAKIReport | 62 KB | Download |
PDF |
OLIReport | 62 KB | Download |
PDF |
ROADS MAINTENANCE PLANReport | 129 KB | Download |
Follow SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY at Argyll and Bute and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Apr 2013 | Recommendations arising from short life working group - roads hierarchyDecision Agreed that the report be put forward for consideration by the Council by the Executive Director of Developm... | Agreed | Open |
| 2 Apr 2013 | Recommendations arising from short life working group - road defects and response timesDecision Agreed that the report be put forward for consideration by the Council by the Executive Director of Developm... | Agreed | Open |
| 11 Mar 2013 | Alternative options for the allocation of capital fundingDecision The Short Life Working Group noted the demonstration they were given on the WDM system. (Reference: Demonstr... | Noted | Open |
| 11 Mar 2013 | Roads asset management plan and roads hierarchyDecision The Short Life Working Group - In terms of roads hierarchy; agreed to recommend to the Council - To adopt th... | Agreed | Open |
| 11 Mar 2013 | Roads asset life cycle planningDecision The Short Life Working Group noted the demonstration. (Reference: Demonstration by Jamie McLafferty, Technic... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.